Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.0 LAccepted-AOC | 1 | Accepted-AOC ok | |
| 2 | Not Admitted-Fee/PreQual/Technical ASSANDH ASSANDH KARNAL 132039 | KARNAL | HARYANA | 132039 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹20.4 L
EMD Value
₹40,900
Closing Date
3 Jun 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Karnal W/S Division, Karnal
Executive Engineer, Karnal W/S Division, The Mall Road Karnal
Replacement of V.R. Bridge at RD 9000 on Pakhana Disty.
2021_HRY_173490_8
No.5198-5218/53M dated 26/05/2021
Open Tender
Civil Works - Bridges
Item-rate/Agreement basic
270 days
KARNAL
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹40,900
Yes
11 Aug 2021
29 May 2021
3 Jun 2021
29 May 2021
3 Jun 2021
29 May 2021
90 days
Amount
Works Details
Dismantling reinforced cement concrete with cleaning and straightening and cutting of bars if required complete in all respect as per direction of Engineer-in-Charge. HSR item No.8.6 (e).
Dismantling C.C 1:4:8 complete in all respect as per direction of Engineer-in-Charge. HSR Item No. 8.6(b)
Dismantling brick work, Tile masonry or Tile lining and Tile Terracing in cement complete in all respect as per direction of Engineer-in-Charge. HSR item No. 8.5 (b)
Dismantling road including soling and wearing coat, screening and stacking of old serviceable material, complete in all respect as per direction of Engineer-in-Charge. HSR item 24.37
Earth work excavation in all kind of soil including breaking of clods with all lead, lifts & other allowances if any including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item 6.2 (b) + (c ), i,ii,iii + 6.3 (i)
Extra for compaction for laying earth in 25 cm layer including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.6.2 (g), (i,ii)- 6.3 (i)+6.2 (g), (v)
Earth work excavation in Foundation, Trenches etc. in all kind of soils, not exceeding 2 mtrs. Depth including dressing of bottom and sides of trenches etc. including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 6.6
Shuttering for faces of concrete foundation and foundation beams (vertical or battering) including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR Item 9.13
PCC providing & Laying in position machine batched and Machine mixed desgin mix M-15 Grade cement concrete for reinforced cement concrete work, using cement content as per approved desgin mix i/c pumping of concrete to site of laying but excluding the cost of centering shutteing finishing, and reinforcement including admixture in recommended proportion as per IS 9103 to Accelrate, retard setting of concrete, imporive work ability without impreaing strength & durability as per direction Engineer-in-Charge in F&P. cement content 240 kg Per cum including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-incharge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.(10.64-10.79+10.41)
Ist Class brick work laid in C:M 1:3 in F&P including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. HSR item No. 11.5
RCC providing & Laying in position machine batched and Machine mixed desgin mix M-25 Grade cement concrete for reinforced cement concrete work, using cement content as per approved desgin mix i/c pumping of concrete to site of laying but excluding the cost of centering shutteing finishing, and reinforcement including admixture in recommended proportion as per IS 9103 to Accelrate, retard setting of concrete, imporive work ability without impreaing strength & durability as per direction Engineer-in-Charge in F&P minimum cement content 330 kg including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 10.66
PCC providing & Laying in position machine batched and Machine mixed desgin mix M-25 Grade cement concrete for reinforced cement concrete work, using cement content as per approved desgin mix i/c pumping of concrete to site of laying but excluding the cost of centering shutteing finishing, and reinforcement including admixture in recommended proportion as per IS 9103 to Accelrate, retard setting of concrete, imporive work ability without impreaing strength & durability as per direction Engineer-in-Charge in F&P minimum cement content 330 kg including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.(10.66-10.79+10.41)
Centering & Shuttering of faces of wall partitions, retaining walls, well staining and the like (vertical or battering) including attached pilasters, buttresses etc. including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 9.5
Centring and shuttering for main slab Culverts including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.9.18 (b)
Providing & fixing PVC rain water pipe 6 Kg. pressure of ISI mark in cement mortar during masonry work including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 13.89 (a)
Providing & fixing PVC rain water pipe 6 Kg. pressure of ISI mark in cement mortar during masonry work including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 13.89 (b) (150 mm dia PVC pipe)
Rehandling of earth work with all lead, lift & other allowances (If any) including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications as per HSR Chapter-6 (Note-II).
Fe-500 EQ TMT steel bars RCC work where not included in the complete rate of RCC including bending, binding and placing in position including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications. (HSR item No.18.22)
Providing expansion joint remolded joint filler 20 mm wide including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No. 24.35 (b)
Filling sand behind the structure with all lead, lift & other allowances (If any) including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications (NS Item).
Dry brick on edge paving sand grounted over 50mm thick earth mud plaster including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No 14.20.
Striking joints in cement on brick and tile work including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR 15.69 (a)
Laying of dry brick bats including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR Item No 10.116
Dismantling of dry brick on edge complete in all respect as per direction of Engineer-in-Charge. HSR item No. 8.5 (i)
Preparation of plastered or concrete surfaces for painting, including sand papering the surface, applying once coat of linseed oil and filling with approved quality filler, consisting of white lead, linseed oil, varnish and chalk mitti including finishing surface to the required finish, complete including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR Item No.16.24
Applying priming coat with cement primer in all shades on newaly plastered including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications HSR item No.16.25)
Painting two coats with ready mixed exterior paint in all shades including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications (HSR item No. 16.26)
Supply & fixing sign board including S/o & C/o material and labour charges complete in all respect as per direction of Engineer-in-Charge, as per approved drawing/ design supplied by the department & as per PWD specifications (N.S.Item)
Credit of material:- (i) Old Steel
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .