| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.9 Cr+₹1.4 L (0.74%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | D Anandhan L1 | maniandco L2 |
|---|---|---|---|---|---|
| 1.00 | 1) Strengthening to the road from Salem - Cochin Road to Thekkalur (Via) Vellandipalayam Km 0/0-2/100
Construction Work
Clearing the light/scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by departmental officers including all incidental charges etc. complete.
MORD Specification 111, 112, 201 | 2,192.4 | Sqm | 6 ₹13,154.4 Lowest | 6 ₹13,154.4 Lowest |
| 2.00 | Earth work excavation and depositing on back with an initial of 10m and lift 2m in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth etc., as per SS 20 B including laying and spreading in layers of 250 mm loose thick each, sectioning , watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content as determined in occurrence with complete as per MoRD 111, 112, 202, 900, 301, 304 | 1,665 | Cum | 140 ₹2,33,100 Lowest | 140 ₹2,33,100 Lowest |
| 3.00 | Providing and laying Gravel including cost and conveyance of gravel from approved sources to work site including labour for spreading , watering and compacting by power roller to achieve the required protect density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete. MORD Specification 111, 112, 401, 900 Km 0/0 - 1/0 | 222.3 | Cum | 525 ₹1,16,707.5 Lowest | 530 ₹1,17,819 |
| 4.00 | Km 1/0 - 2/0 | 299.13 | Cum | 535 ₹1,60,034.55 Lowest | 550 ₹1,64,521.5 |
| 5.00 | Km 2/0-2/10 | 30 | Cum | 545 ₹16,350 Lowest | 570 ₹17,100 |
| 6.00 | Picking Old BT
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 | 1,875.12 | Sqm | 23 ₹43,127.76 Lowest | 23 ₹43,127.76 Lowest |
| 7.00 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in subbase/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. | 703.17 | Cum | 2,460 ₹17,29,798.2 Lowest | 2,470 ₹17,36,829.9 |
| 8.00 | Providing and applying Primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 | 5,625.37 | Sqm | 88 ₹4,95,032.56 Lowest | 88 ₹4,95,032.56 Lowest |
| 9.00 | Providing and applying Tack coat with Bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.4 | 5,625.37 | Sqm | 21 ₹1,18,132.77 Lowest | 21 ₹1,18,132.77 Lowest |
| 10.00 | Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 2,289.38 | Sqm | 34 ₹77,838.92 Lowest | 35 ₹80,128.3 |
Tender Value
₹1.9 Cr
EMD Value
₹1.9 L
Closing Date
5 Mar 2026, 3:00 pmClosed
The Project Director, DRDA, Tiruppur
DRDA, Tiruppur
Strengthening/Upgradation/Renewal BT to the Roads in Avinashi Block of Tiruppur District under Pkg No. 09/MGSMT/2025-26 Additional.
2026_RDTN_669397_6
DIPR/1487/Tender/2026, dated . 01.03.2026
Open Tender
Civil Works - Roads
Item Wise
180 days
Tiruppur
Please Refer Tender Documents.
7 documents required · 7 mandatory
₹0
₹1.9 L
DRDA, Tiruppur
29 Aug 2026
3 Mar 2026
5 Mar 2026
3 Mar 2026
5 Mar 2026
3 Mar 2026
4 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1) Strengthening to the road from Salem - Cochin Road to Thekkalur (Via) Vellandipalayam Km 0/0-2/100
Construction Work
Clearing the light/scrub jungle by uprooting including all cutting charges and disposing of the products and clearing as directed by departmental officers including all incidental charges etc. complete.
MORD Specification 111, 112, 201 | 2,192.4 | Sqm | - | - |
| 2 | Earth work excavation and depositing on back with an initial of 10m and lift 2m in sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth etc., as per SS 20 B including laying and spreading in layers of 250 mm loose thick each, sectioning , watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content as determined in occurrence with complete as per MoRD 111, 112, 202, 900, 301, 304 | 1,665 | Cum | - | - |
| 3 | Providing and laying Gravel including cost and conveyance of gravel from approved sources to work site including labour for spreading , watering and compacting by power roller to achieve the required protect density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc., complete. MORD Specification 111, 112, 401, 900 Km 0/0 - 1/0 | 222.3 | Cum | - | - |
| 4 | Km 1/0 - 2/0 | 299.13 | Cum | - | - |
| 5 | Km 2/0-2/10 | 30 | Cum | - | - |
| 6 | Picking Old BT
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 | 1,875.12 | Sqm | - | - |
| 7 | Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in subbase/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. | 703.17 | Cum | - | - |
| 8 | Providing and applying Primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 | 5,625.37 | Sqm | - | - |
| 9 | Providing and applying Tack coat with Bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surface treated with Primer cleaned with Hydraulic broom as per Technical Specification Clause 503.4 | 5,625.37 | Sqm | - | - |
| 10 | Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 2,289.38 | Sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 1.64 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.31 MB
TB09.pdf
Tender Documents • 1.39 MB
PB09.pdf
Tender Documents • 1.25 MB
BOQ_804421.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .