Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹78.2 L+₹8,848.07 (0.11%)Rejected-AOC 3 97 RAMAR KOVIL STREET THAPPARAI KADAVALAM AMBUR 635811 | TIRUPATHUR | TAMIL NADU | 635811 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Ashika Construction L1 | SRI NIDHI CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Somalapuram to Veeraragavapuram KM 0/0-1/375 (R-81), Somalapuram Panchayat, Madhanur Block | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 1,485 | Sqm | 6 ₹8,910 Lowest | 6.5 ₹9,652.5 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 1,773.25 | Sqm | 23 ₹40,784.75 Lowest | 24 ₹42,558 |
| 4.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 370.47 | Cum | 341 ₹1,26,330.27 Lowest | 342 ₹1,26,700.74 |
| 5.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||
| 6.00 | KM 0/0-1/0 | 254.81 | Cum | 2,634 ₹6,71,169.54 Lowest | 2,635 ₹6,71,424.35 |
| 7.00 | KM 1/0-1/375 | 214.1 | Cum | 2,634 ₹5,63,939.4 Lowest | 2,635 ₹5,64,153.5 |
| 8.00 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 3,126.08 | Sqm | 86 ₹2,68,842.88 Lowest | 86.5 ₹2,70,405.92 |
| 9.00 | Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 4,400.7 | Sqm | 20 ₹88,014 Lowest | 20.5 ₹90,214.35 |
| 10.00Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP .(using Power Roller) | |||||
Tender Value
Refer Docs
EMD Value
₹82,000
Closing Date
20 Feb 2026, 3:00 pmClosed
The Project Director DRDA, Tirupathur
The Project Director DRDA, Tirupathur
Tirupathur District NABARD RIDF 2026-27 road work in Somalapuram panchayat at Madhanur Block Package No.09
2026_RDTN_657655_1
E1/4221290/2026
Open Tender
Civil Works
Item Wise
180 days
DRDA
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹82,000
DRDA, Tirupathur
5 Mar 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Somalapuram to Veeraragavapuram KM 0/0-1/375 (R-81), Somalapuram Panchayat, Madhanur Block | - | - | - | - |
| 2 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 1,485 | Sqm | - | - |
| 3 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 1,773.25 | Sqm | - | - |
| 4 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 370.47 | Cum | - | - |
| 5 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | - | - | - | - |
| 6 | KM 0/0-1/0 | 254.81 | Cum | - | - |
| 7 | KM 1/0-1/375 | 214.1 | Cum | - | - |
| 8 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 3,126.08 | Sqm | - | - |
| 9 | Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 4,400.7 | Sqm | - | - |
| 10 | Providing and laying Bituminous Concrete to 30 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP .(using Power Roller) | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.68 MB
Tendernotice_2.pdf
PDF • 1.50 MB
Tendernotice_3.pdf
PDF • 0.72 MB
BOQ_788857.xls
BOQ • 0.27 MB
Apost.pdf
PDF • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .