| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 Cr+₹23.1 L (19.2%)Rejected-AOC | ₹1.4 Cr+₹23.1 L (19.2%) | L2 | Rejected-AOC L2 |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
27 Oct 2020, 4:00 pmClosed
Superintending Engineer
139 Mal Road Pratappur Agra
Restoration of Hindon Barrage in Distt. Ghaziabad.
2020_UPIDC_522363_1
8/SE/2020-2021
Open Tender
Civil Works
Item Rate
120 days
Hindon Barrage in GZB
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,270
₹3.2 L
Yes
13 Sept 2021
19 Oct 2020
28 Oct 2020
19 Oct 2020
27 Oct 2020
19 Oct 2020
Amount
Earth work in excavation in foundation i/c all cost of labour ,material and t&P with proper disposal & dressing etc.
Earth work in filling i/c lead up to 8.00 Km by power transport i/c all cost of labour ,material and t&P with ramming & dressing.
Making G.I. Wire crate with 8 SWG G.I. wire 150x150 mm mesh with double knot i/c all cost of material, labour and T&P etc.
Packing /filling Split Stone Boulders in wire crates with 20-40 kg wt. i/c all cost of material, labour and T&P etc.
C.C. Work 1:3:6 i/c all cost of labour, material and t&P.
C.C. Work 1:2:4 i/c all cost of labour, material and t&P.
Centering & Shuttering for CC Work i/c all cost of all labour, material and T&P etc.
Laying Coarse sand filter below pitching i/c all cost of labour ,material and t&P.
Laying Coarse aggregate filter (5-10mm) below pitching i/c all cost of labour ,material and t&P
Laying Coarse aggregate filter (10-20mm) below pitching i/c all cost of labour ,material and t&P
Laying dry Split Stone Pitching in internal section with 20-40 kg wt. i/c all cost of labour ,material and t&P
Random coarsed Rubble Masonry in 1:3 CM for Band of Pitching with 20-40 kg wt. split stone i/c all cost of labour ,material and t&P
Cement Concrete Grouting over stone pitching in C.C. 1:2:4 i/c all cost of labour ,material and t&P
Dumping 20-40 Kgs Split Stone Boulders in scoured bed of canal . i/c all cost of labour ,material and t&P
Laying of 80 mm thick factory made C.C. Interlocking Paver block of M-30 Grade laid over sand & concrete base i/c cost of all material, labour and T&P etc. complete.
R. C.C Work . 1:1.5:3 excluding Centring and Shuttering and reinforcement but i/c cost of all labour, material and T&P etc.
Centering & Shuttering for RCC Work i/c cost of all labour, material and T&P etc.
Steel Reinforcement for RCC Work i/c bending, binding, cutting and placing in position and cost of binding wire , i/c all cost of labour ,material and t&P
Rakesh kumar
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .