Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance 201 A HALISAHAR N S SARANI NABANAGAR NORTH 24 PARGANAS 743136 WEST BENGAL | NABANAGAR | NORTH 24 PARGANAS | WEST BENGAL | 743136 | L1 | Admitted-Finance | ||
| 2 | L2₹2.7 L+₹3,169.81 (1.21%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.7 L+₹4,008.11 (1.53%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹2.6 L
EMD Value
₹6,000
Closing Date
19 Nov 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DY CE (SWM-I)
48, MARKET STREET, KOLKATA-87
MAINTENANCE OF RAWDON STREET COMPACTOR STATIONS BY REPAIRING OF FLOOR ALONGWITH ANCILLARY CIVIL WORKS IN WARD NO-63, BR-VII, UNDER SWM-I DEPARTMENT.
2026_KMC_1048374_1
SWM-I/CSM/26-27/C-02
Open Tender
CIVIL WORKS
Percentage
30 days
BOROUGH-VII
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
25 Nov 2026
4 Nov 2026
21 Nov 2026
4 Nov 2026
19 Nov 2026
5 Nov 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 11. Labour for taking out rolling shutter (only shutter portion)dismantling by parts for repair or (replacement of damaged parts only), rehanging and refitting the same in position after necessary repairs (excluding the cost of supply of new parts). | 44.63 | SQUARE METER | 283 | ₹12,628.88 |
| 2 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 12. Renewing seam pipe for rolling shutter as per existing size and shape fitting, fixing complete. | 3.75 | METER | 210 | ₹787.5 |
| 3 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 15. Renewing profile of rolling shutter including fitting fixing complete as per existing size and shape | 45 | METER | 54 | ₹2,430 |
| 4 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 16. Renewing spring of rolling shutter as per existing size and shape including fitting fixing complete | 3 | EACH | 609 | ₹1,827 |
| 5 | BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. B. REPAIRING 14. Oiling and greasing of rolling shutter and repair to in side lock. | 44.63 | SQUARE METER | 73 | ₹3,257.63 |
| 6 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 61.5 | SQUARE METER | 19 | ₹1,168.5 |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc..C. REPAIR AND REHABILITATION WORKS?(b) Applying 2 coats of Non-Toxic Acrylic Polymer modified Paint having adhesive & waterproofing properties by mixing in proportion (1 liquid: 4 cementitious material) or as per manufacturer's specification for water proofing layer in water tank etc. (No Departmental Cement is required) | 61.5 | SQUARE METER | 258 | ₹15,867 |
| 8 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster(3rd Corrigenda & addenda dated 04.06.2018) | 61.5 | SQUARE METER | 194 | ₹11,931 |
| 9 | BUILDING WORKS(N) THATCH, MUD AND BAMBOO WORKS.(A). ORIGINAL WORKS?(11)100 mm. thick dab wall made of bamboo walling (with crushed bamboo or split bamboo twigs) mud plastered both sides and finished with lipping of cowdung and earth (1:4) mixture complete but excluding the cost of supporting frame work) | 72 | SQUARE METER | 90 | ₹6,480 |
| 10 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(6)Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement).Using grey cement.(iii) 35 mm. thick.(Add extra @1.5% for each addl. floor upto 4th floor and @1.75% for each additional floor above 4th floor for item No.5 and 6 of subhead A). (3rd Corrigenda & addenda dated 04.06.2018) | 72 | SQUARE METER | 337 | ₹24,264 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
FORM.pdf
Tender Documents • 0.55 MB
PRICEBID.pdf
Tender Documents • 0.52 MB
BOQ_2567009.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .