Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC AT KHUDGADDA NEW BASTI SAWANG BOKARO JHARKHAND 829128 | BOKARO | BOKARO | JHARKHAND | 829128 | L1 | Accepted-AOC All documents submitted and found O.K. Comparative lower rate. | |
| 2 | L2₹1.3 L+₹507.40 (0.40%)Rejected-AOC AT COLONY NO 02 KATHARA KATHARA PO KATHARA DIST BOKARO 829116 | KATHARA | BOKARO | JHARKHAND | 829116 | L2 | Rejected-AOC Comparative higher rate. | |
| 3 | L3₹1.3 L+₹1,026.60 (0.80%)Rejected-AOC AT KATHARA P O KATHARA BOKARO JHARKHAND 829116 | BOKARO | BOKARO | JHARKHAND | 829116 | L3 | Rejected-AOC Comparative higher rate. |
Tender Value
₹1.3 L
EMD Value
₹1,700
Closing Date
8 Jun 2022, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager(CP), Sawang Washery, Kathara Area
Office of the Project Officer, Sawang Washery
Repairing of sluice valve , head drum, base structure, motor base structure for BC-6 and BC-7 belt and counter weight in Deshaling Plant at Sawang Washery.
2022_CCL_245046_1
SGW/KTA/ENM/E-Tender/22-23/14
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
Office of the Project Officer, Sawang Washery
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,700
16 Jun 2022
27 May 2022
9 Jun 2022
28 May 2022
8 Jun 2022
28 May 2022
28 May 2022 - 2 Jun 2022
Amount
Repairing of sluice valve for different pipeline (i) Valve dismantling (ii) Valve cracked portion V cutting by Electrodes (iii) Valve cracked portion cutting by C.I. Electrodes (iv) Valve machining
Repairing of BC-6 & BC-7 head drum base structure and Motor base structure (i) Cutting and dismantling by gas (ii) Welding and machining of base (iii) Hole drilling and machining (iv) Cross strengthening of base
Repairing of BC-1 & BC-3 Conveyor belt take up counter weight base structure (i) Counter weight base structure of dismantling by gas (ii) Both side structure framing (iii) Both side frame drilling and taping (iv) Both side play long rib setting
Total impact of GST for the purpose of CTC
M/S PERFECT ELECTRICAL WORKS
STAR ELECTRICAL WORKLS
stage.html
html • 0.04 MB
techsummary_253150.pdf
PDF • 0.95 MB
finsummary_253150.pdf
PDF • 0.95 MB
Award14.pdf
PDF • 0.88 MB
finance_253150.pdf
PDF • 0.11 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .