| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-AOC | ₹10.2 L | L1 | Accepted-AOC AOC |
| 2 | L2₹10.4 LRejected-Finance | ₹10.4 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | ARAVIND MUGESH L1 | Jegan L2 |
|---|---|---|---|---|---|
| 1.00Construction of 3.00 m Span culvert at North Side of Near Post office in Idaikal Village and Panchayat in Kadayanallur Panchayat Union | |||||
| 2.00 | Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete. | 58.75 | Cum | 263.5 ₹15,480.63 | 264 ₹15,510 |
| 3.00 | Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete. | 18.29 | cum | 5,451 ₹99,698.79 | 5,452 ₹99,717.08 |
| 4.00 | Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete. | 200.65 | sqm | 547 ₹1.1 L | 548 ₹1.1 L |
| 5.00 | Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete. | 26.16 | sqm | 1,095 ₹28,645.20 | 1,096 ₹28,671.36 |
| 6.00 | Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 78.73 | cum | 5,722 ₹4.5 L | 5,723 ₹4.5 L |
| 7.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 9.6 | cum | 9,064 ₹87,014.40 | 9,095 ₹87,312 |
| 8.00 | Supplying, Fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification. | 0.48 | MT | 91,865 ₹44,095.20 | 91,866 ₹44,095.68 |
| 9.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 4.59 | cum | 6,744 ₹30,954.96 | 9,745 ₹44,729.55 |
| 10.00 | Refilling the basement with excavated earth other than Sand complying the Standard specification | 38.08 | cum | 45.5 ₹1,732.64 | 46 ₹1,751.68 |
Tender Value
₹10.5 L
EMD Value
₹10,500
Closing Date
26 Feb 2026, 4:00 pmClosed
BDO
BDO,KADAYANALLUR
Construction of 3.00 m Span culvert at North Side of Near Post office in Idaikal Village and Panchayat in Kadayanallur Panchayat Union, Tenkasi District under Peri-Urban 2025-26 (EST.AMT-10.50L)
2026_RDTN_662752_5
BDOKNR/80/2026-B3
Open Tender
Civil Works
180 days
KADAYANALLUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,500
26 May 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
Construction of 3.00 m Span culvert at North Side of Near Post office in Idaikal Village and Panchayat in Kadayanallur Panchayat Union
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete.
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Supplying, Fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Refilling the basement with excavated earth other than Sand complying the Standard specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_795679.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
BOQ_795679.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid