| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-Finance | ₹2.0 Cr | L1 | Accepted-Finance Accepted in accordance with the evaluation criteria for tied bids. |
| 2 | L1₹2.0 CrRejected-Finance FLAT NO 1 234 E 16 AHIANA BUILDING XELPEM DULER MAPUSA GOA | ₹2.0 Cr | L1 | Rejected-Finance Rejected in accordance with the evaluation criteria for tied bids. |
| 3 | L2₹2.3 Cr+₹34.4 L (17.5%)Rejected-Finance 203 SECOND FLOOR GERA IMPERIUM GRAND OPP GINGER HOTEL NEAR K T C BUS STAND PATTO PANAJIM GOA 403001 | NORTH GOA | GOA | 403001 | ₹2.3 Cr+₹34.4 L (17.5%) | L2 | Rejected-Finance Rejected in accordance with the evaluation criteria for tied bids. |
| 4 | L3₹2.3 Cr+₹35.3 L (18.0%)Rejected-Finance | ₹2.3 Cr+₹35.3 L (18.0%) | L3 | Rejected-Finance Rejected in accordance with the evaluation criteria for tied bids. |
Tender Value
₹2.5 Cr
EMD Value
₹4.9 L
Closing Date
16 Jul 2026, 3:00 pmClosed
Executive Engineer
WD.II, DDW, PORVORIM GOA
Providing water supply to Non-Residential and Residential buildings including site development, Parade Ground, Athletic track and Sports fields at CISF 6th RB, Pernem Goa (Package 1) in V.P. Tuem of Mandrem Constituency in Pernem Taluka
2026_DDW_30153_1
DDW/ WD.II/ ASW/ F.24-E/ 12/ 2026-27
Open Tender
Civil Works - Water Works
Percentage
180 days
Tuem
Please refer Tender documents.
8 documents required · 8 mandatory
₹20,000
₹4.9 L
7 Sept 2026
8 Jul 2026
17 Jul 2026
8 Jul 2026
16 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavation )/manual means in foundation pipelines trenches in all types of soft stratas comprising any of the materials such as soil ,silt, sand, clay ,gravels, moorum of all varietie, shingles .pebbles all types of conglomerates , laterite rocks ,ordinary rocks , weathered rocks and all such other materials as described under appendix A to these specification either in full or in parts as the case may be adopting any method as may be convenient or permitted inclusive of chiseling, wedging etc. in all conditions such as dry ,moist , foul saturated submerged etc. and as directed by the Engineer-in-charge etc. all complete in foundation pipeline trenches including dressing of sides, ramming of bottoms including getting out the excavated soil and disposal of surplus soil for all lead and all lifts including barricading, danger lighting guarding as per direction of Engineer-in-charge . | 2,401.58 | Cum | 1 | ₹2,399.18 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 31.39 | cu.m | - | - |
| 3 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering shuttering and finishing :;All works upto plinth level | 31.18 | cu.m | - | - |
| 4 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 38.48 | cu.m | - | - |
| 5 | Providing & laying damp proof course 25 mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand : 4 graded stone agg. 10 mm nominal size). | 28.08 | sq.m | - | - |
| 6 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 53.34 | cu.m | - | - |
| 7 | Extra for laterite masonry in all sizes in superstructure from floor I level upto floor V level. | 53.34 | cu.m | - | - |
| 8 | Providing and laying in position (1:2:4) reinforced cement concrete excluding the cost of centering shuttering finishing and reinforcement. (1 cement:2 coarse sand:4 graded stone agg 20mm nominal size);All works upto plinth level | 4.03 | cu.m | - | - |
| 9 | Providing and laying in position (1:2:4) reinforced cement concrete excluding the cost of centering shuttering finishing and reinforcement. (1 cement:2 coarse sand:4 graded stone agg 20mm nominal size);In walls (any thickness) including attached pilasters buttresses plinth and string courses fillets columns pillars piers abutments posts and structs etc. upto floor five level | 1.82 | cu.m | - | - |
| 10 | Providing and laying in position (1:2:4) reinforced cement concrete excluding the cost of centering shuttering finishing and reinforcement. (1 cement:2 coarse sand:4 graded stone agg 20mm nominal size);In beams suspended floors roofs having slope upto 15° landings balconies shelves chajjas intels bands plain window sills staircases upto floor five level | 3.32 | cu.m | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Tendernotice_2.pdf
PDF • 0.42 MB
Tendernotice_3.pdf
PDF • 1.86 MB
Tendernotice_4.pdf
PDF • 0.63 MB
BOQ_30568.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .