| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹81,791Accepted-Finance 1 49 MELEGOUNDANPALAYAM METTUPALAYAM KINATHUKADAVU 642110 | COIMBATORE | TAMIL NADU | 642110 | 1 | Accepted-Finance ACCEPTED |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
10 Jun 2022, 2:00 pmClosed
EE/Rural/Tirunelveli
sivanthipatti Road maharajanagar Tirunelveli 627011
Execution of contract for EOS to 9 nos Agri Normal service connection in Town Alangulam section in Rural Division/ Tirunelveli
2022_EB_234202_1
ETW-001/22-23
Open Tender
Miscellaneous Works
Works
180 days
Tirunelveli
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,000
Yes
25 Nov 2022
27 May 2022
13 Jun 2022
27 May 2022
10 Jun 2022
27 May 2022
Amount
Excavation of For pole upto 8.00m length by using JCB/Manual
Excavation of For pole above 8.00m length by using JCB/Manual
Excavation of In Hard Soil (common to all size of poles)
Excavation of In rocky area (common to all size of poles) by blasting / Manual
Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual
Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual
Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual
Erection of metal supports above 9m / RSJ / Rail Pole/Tubular Poles
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
Erection of additional Stay in the same stay rod, excluding excavation of stay pit and burial of stay rod.
Erection of stay set complete in the rock area by blasting
Fixing of V cross arm 3.5 feet
Fixing of V cross arm 4.5 feet
Fixing V cross arm 5.0 feet
Fixing of LT Single phase cross arm
Fixing of LT 3 phase cross arm
Fixing of HT / LT Ti fitting
Fixing of HT PIN insulator with Pin 11 kv
Fixing of HT PIN insulator with Pin 22 kv
Fixing of LT PIN insulator
Fixing of HT strain disc 11 KV
Fixing of HT strain disc 22 KV
Fixing of Two Tapping cross arm per cut point upto 33 KV line including fixing of Discs,insulators and Jumpering etc..
Set right of all sizes of leaning poles
Fixing of shackle
Fixing of Aluminium knob
Fixing of HT LAS (3 Nos.)
Fixing of LT LAS (3 Nos.)
Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor
Paving and stringing of conductors of above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor
Paving and stringing of conductors of 7/4.09mm ACSR or other equivalent conductor
Paving and stringing of conductors of 7/4.72 mm Dog Conductor or other equivalent conductor
Releasing and reerection (resagging) of one run of all sizes of conductor
Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer. (Data as per Annexure II)
Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. Upto 25 KVA Distribution transformer / Metering set.
Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. Above 25 KVA to 100 KVA
Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa.Above 100 KVA to 250 KVA
Erection of Distribution Transformer including loading of Distribution Transformer at stores and erection at structure or vice versa. 500 KVA and above
Failed DT replacement below 100 KVA
Failed DT replacement 100 KVA and above
Erection of 11 KV single pole Structure including erection of DT complete without centre support (Data as per Annexure III)
Erection of 11 KV Single Pole structure including erection of DT complete with centre support ( Data as per Annexure III)
Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., (Data as per Annexure I) With 11 KV AB switch using all types of poles of size 9.14 m and above length
Erection of DP structure with stay as per TNEB standard including fixing of top channel, cross bracing, concreting, painting, colour washing etc., (Data as per Annexure I)With 22 / 33 KV AB switch using all types of poles of size 9.14 m and above length
Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) Mass concreting of poles
Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) Sleeve concreting
Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) Stay concreting
Earthing of poles with GI wires 4 or 6 SWG by coil earthing
Pipe earthing including excavation of earth pit and fixing earth pipe 3 m length
Replacing the corroded earth pipes of transformer structure and replacing the earth wire completely with aluminium lugs for termination
Replacement of corroded earth pipe
Loading or unloading of Distribution Transformer Upto 100 KVA
Loading or unloading of Distribution Transformer Above 100 KVA and upto 500 KVA
Loading or unloading of Metering set of all ratios
Loading or unloading of various sizes of poles REC, RCC, PSC pole upto 8.00 m length
Loading or unloading of various sizes of poles All REC, RCC pole above 8.00 m length
Loading or unloading of various sizes of poles Metal poles all sizes
Loading of Conductor
Unloading of Conductor
Loading / Unloading of line materials
Provision of guarding with two numbers earth pits excluding stay set erection Flat guarding with earth pit
Provision of guarding with two numbers earth pits excluding stay set erection Split neutral
Transportation of all types and sizes of poles and other associated materials from Road side to pole pit and vice versa upto 0.50km
Transporting of Distribution Transformer / Line materials from stores to office / site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
Transporting of Distribution Transformer / Line materials from stores to office / site above 10 KM distance by engaging 1 Ton capacity Minidor (Lorry)
Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit
For breaking the mass concrete of all supports
Dismantling of stay set complete including stay rod
Dismantling of stay set complete Without stay rod
Dismantling of conductor of upto 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of conductor of above 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side
Dismantling of V Cross arm
Dismantling of 3 phase X Arm
Dismantling of Single phase X arm
Dismantling of HT/LT TI Fitting
Dismantling of HT pin Insulators
Dismantling of LT pin Insulators
Dismantling of Strain Disc
Dismantling of Shackle
Dismantling of aluminium knob
painting of Distribution Transformer of all capacities(paint to be supplied by the board)including cleaning of DT
Numbering of poles including base painting and with cost of paint
Painting of Cement poles by Distember coating including cost of distember
Painting of structure materials distribution transformers with aluminium paint of structure poles and writing of transformer details (Items 1 to 6 brush to be owned by the contractor)(Paint to be supplied by Department)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .