Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.6 LAccepted-Finance | ₹12.6 L | 1 | Accepted-Finance Accept |
| 2 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 3 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 4 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 5 | Rejected-Technical | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | Jothi Prakash L1 | Nirajankumar L6 | Pandian electricals L4 | Monika Construction L2 | Sri Padhma Constructions L3 | rcihfield enterprises L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 17.87 | Cum | 260 ₹4,646.16 | 265 ₹4,735.51 | 280 ₹5,003.56 | 263 ₹4,699.77 | 270 ₹4,824.86 | 260 ₹4,646.16 |
| 2.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 9.37 | Cum | 1,730 ₹16,207.85 | 1,455 ₹13,631.46 | 2,000 ₹18,737.4 | 1,736 ₹16,264.06 | 1,800 ₹16,863.66 | 1,450 ₹13,584.61 |
| 3.00 | Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification | 9.37 | Cum | 5,440 ₹50,965.73 | 5,445 ₹51,012.57 | 6,000 ₹56,212.2 | 5,442 ₹50,984.47 | 5,500 ₹51,527.85 | 5,440 ₹50,965.73 |
| 4.00 | Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. | 9.13 | Cum | 6,140 ₹56,065.54 | 6,145 ₹56,111.2 | 6,200 ₹56,613.42 | 6,144 ₹56,102.07 | 6,200 ₹56,613.42 | 6,140 ₹56,065.54 |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.18 | MT | 91,850 ₹16,206.14 | 91,805 ₹16,198.2 | 92,000 ₹16,232.61 | 91,858 ₹16,207.55 | 92,000 ₹16,232.61 | 91,800 ₹16,197.32 |
| 6.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items with cost and conveyance incluidng all other labour charges etc complete | 6.44 | Cum | 9,320 ₹60,044.97 | 9,325 ₹60,077.19 | 9,500 ₹61,204.64 | 9,326 ₹60,083.63 | 9,400 ₹60,560.38 | 9,320 ₹60,044.97 |
| 7.00 | Centering with shuttering for all cc works using Ms sheet with cost and conveyance incluidng all other labour charges etc complete | 11.12 | Sqm | 540 ₹6,003.72 | 550 ₹6,114.9 | 600 ₹6,670.8 | 547 ₹6,081.55 | 550 ₹6,114.9 | 545 ₹6,059.31 |
| 8.00 | Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data) | 68.69 | Sqm | 1,460 ₹1,00,291.05 | 1,465 ₹1,00,634.51 | 1,550 ₹1,06,473.38 | 1,469 ₹1,00,909.28 | 1,500 ₹1,03,038.75 | 1,460 ₹1,00,291.05 |
| 9.00 | Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers. | 18.07 | Sqm | 1,430 ₹25,845.82 | 1,435 ₹25,936.19 | 1,550 ₹28,014.7 | 1,433 ₹25,900.04 | 1,500 ₹27,111 | 1,430 ₹25,845.82 |
| 10.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 34.83 | Sqm | 280 ₹9,751.78 | 285 ₹9,925.92 | 300 ₹10,448.34 | 284 ₹9,891.1 | 290 ₹10,100.06 | 280 ₹9,751.78 |
Tender Value
₹14 L
EMD Value
₹14,000
Closing Date
23 Oct 2025, 3:00 pmClosed
BDO
KTR
Construction of Bus Shelter to Vandalur Arignar Anna Zoological Park in Vandalur Panchayat at Kattankolathur Panchayat Union
2025_RDTN_613063_1
2397/2025/A2 dt 10.10.2025
Open Tender
Civil Works
90 days
BDO KTR
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹14,000
Yes
7 May 2026
10 Oct 2025
23 Oct 2025
10 Oct 2025
23 Oct 2025
10 Oct 2025
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items with cost and conveyance incluidng all other labour charges etc complete
Centering with shuttering for all cc works using Ms sheet with cost and conveyance incluidng all other labour charges etc complete
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data)
Dadooing walls with following best approved quality, white / colour glazed tiles of following sizes set in Cement Mortar 1:2 (One Cement and Two crushed stone M.Sand) 10mm thick and pointing the joints with white cement mixed with colouring pigments at the rate of 0.40 Kg. / sq.m. neatly in all floors, curing, etc., complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supply and fixing of ISMB 200x100 mm with cost and conveyance including all other labour charges etc complete.
Supply and fixing of 49.50x49.50x2.90mm SHS with cost and conveyance including all other labour charges etc complete.
Supply and fixing of ACP Sheet with cost and conveyance including all other labour charges etc complete as per MR.
Manufacturing, Supplying and Fixing of Stainless Steel Hand rails for staircase near wet riser using 50mm dia 304L Grade Stainless Steel pipe of 1.60mm thick will be provided with tubular supports made of 304L Grade Stainless Steel pipe of 25mm dia of 1.60mm thick welded to the railing. The supports will be grouted into the wall and provided with 93.00mm thick Stainless Steel circular base plate of 304 Grade. The rate shall included for grouting into concrete with necessary supporting arrangements the hand rail in floor polishing buffing, bonding, cutting, grinding, conveyance,welding charges, electrical charges, etc. complete
Provision for for Powed coated channel with Grid false ceiling with cost and conveyance including all other labour charges etc complete
Provision for MS roofing sheet with cost and conveyance including all other labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_732534.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_732534.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid