| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-Finance | L1 | Accepted-Finance Accept | |
| 2 | L2₹9.3 L+₹68,772.98 (7.99%)Rejected-Finance ASANSOL | ASANSOL | WEST BENGAL | L2 | Rejected-Finance Reject | |
| 3 | L3₹9.7 L+₹1.1 L (12.4%)Rejected-Finance | L3 | Rejected-Finance Reject | |
| 4 | Rejected-Technical ASANSOL | ASANSOL | WEST BENGAL | - | Rejected-Technical Reject |
Tender Value
₹9.6 L
EMD Value
₹19,157
Closing Date
19 Jun 2026, 3:00 pmClosed
Superintending Engineer
Asansol Municipal Corporation
Construction of pucca pond ghat at Masi Pukur in Ward No. 84, Borough-VI under Asansol Municipal Corporation.
2026_MAD_5015269_1
ET-01 / PW/Eng/26
Open Tender
Miscellaneous Works
Percentage
90 days
Asansol Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹19,157
3 Jul 2026
10 Jun 2026
22 Jun 2026
10 Jun 2026
19 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing compound premises of shurbs,
plants, jungles etc. by cutting and removing
as directed (Specific permission of EngineerIn Charge prior to execution will be
necessary). (Payment to be made on area
cleared) | 125 | M2 | 11 | ₹1,375 |
| 2 | Balling or pumping out water from
foundation trenches | 360 | M3 | 20.88 | ₹7,516.8 |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil
(Including mixed soll but excluding laterite
or sandstone) Including removing, spreading
or stacking the spoils within a lead of 75 m.
as directed. The item Includes necessary
trimming the sides of trenches, levelling,
dressing and ramming the bottom, balling
out water as required complete. (a) Depth of
excavation not exceeding 1,500 mm. | - | M3 | 119.27 | - |
| 4 | Earth work in filling in foundation trenches
or plinth with good earth, in layers not
exceeding 150 mm. Including watering and
ramming etc. layer by layer complete.
(Payment to be made on the basis of
measurement of fintshed quantity of work)
(a) With earth obtained from excavation of
foundation. | 1 | M3 | - | - |
| 5 | Earth work in filling in foundation trenches
or plinth with good earth, In layers not
exceeding 150 mm. Including watering and
ramming etc. layer by layer complete.
(Payment to be made on the basis of
measurement of finished quantity of work).
(C) (1) With carried earth arranged by the
contractor within a radius of 3 km. including
cost of carried earth. | 0.6 | M3 | - | - |
| 6 | Filling in foundation or plinth by Fine sand in layers not exceeding 150 mm. as directed
and consolidating same by thorough
saturation with water ramming complete,
including the cost of supply of sand.
(Payment to be made on measurement of
finished quantity)
(B) Do- by fine sand | - | M3 | - | - |
| 7 | Single Brick Flat Soling of picked jhama
bricks including ramming and dressing bed
to proper level and filling joints with local
sand. | 0.6 | M2 | 324 | ₹194.4 |
| 8 | Ordinary Cement concrete (mix 1:2:4) with
graded stone chips (20 mm nominal size)
excluding shuttering and reinforcement if
any, in ground floor as per relevant IS codes.
(i) Pakur Variety | - | M3 | 4,706.54 | - |
| 9 | Hire and labour charges for shuttering with
centering and necessary staging upto 4 m
using approved stout props and thick hard
wood planks of approved thickness with
required bracing for concrete slabs, beams
and columns, lintels curved or straight
including fitting ground floor) fixing and
striking out after completion of works (upto
roof of (c) Steel shuttering or 9 to 12 mm
thick approved quality ply board shuttering
in any concrete work. | - | M2 | 363 | - |
| 10 | Reinforcement for reinforced concrete work
in all sorts of structures including
distribution bars, stirrups, binders etc initial
straightening and removal of loose rust (if
necessary), cutting to requisite length
hooking and bending to correct shape,
placing in proper position and binding with
16 gauge black annealed wire at every
intersection, complete as per drawing and
direction (a) For works in foundation and
upto roof of ground floor/epto 4 m (1) Tor
steel/Mild Steel | - | MT | 54,413.87 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
Tendernotice_2.pdf
PDF • 0.87 MB
BOQ_5083921.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .