Loading…
Loading…
Tender Value
₹29.1 L
EMD Value
₹58,260
Closing Date
7 Sept 2026, 4:00 pm
Executive Engineer
Irrigation Division Shopian
Vehji canal- Construction of lining wall and bed treatment of Meemandar Ladi and Palpora Ladi
2026_IFC_321591_3
eNIT 22 of 2025-26
Open Tender
Civil Works
Percentage
45 days
Shopian
Please refer Tender documents.
2 documents required · 2 mandatory
₹550
Executive Engineer
₹58,260
Yes
20 Aug 2026
20 Aug 2026
8 Sept 2026
20 Aug 2026
7 Sept 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : | 585.65 | Cum | 479.3 | ₹2,80,702.05 |
| 2 | Dumping stone excluding cost of stones. in Horizontal on level | 122.56 | Cum | 237.9 | ₹29,157.02 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 230.98 | Cum | 6,591.25 | ₹15,22,446.93 |
| 4 | 12mm Cement plaster of mix: (Fine Sand) 1 : 4 ( 1 cement : 4 fine sand) | 551.68 | Sqm | 283.8 | ₹1,56,566.78 |
| 5 | Structural steel work in built up sections, trusses and framed work,
including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded | 1,777.77 | Kg | 138.2 | ₹2,45,687.81 |
| 6 | Supply of Nallah Stones | 122.56 | Cum | 700 | ₹85,792 |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 292.83 | Cum | 218.4 | ₹63,954.07 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 586.08 | SQM | 286.35 | ₹1,67,824.01 |
| 9 | Carriage of material by Mechanical Transport .
Sand avg lead of 25 kms | 112.21 | Cum | 465.14 | ₹52,193.36 |
| 9.01 | 20 mm agg. Avg. lead of 25 kms | 205.57 | Cum | 465.14 | ₹95,618.83 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_1074738.xls
BOQ • 0.26 MB
CorrNIT22.pdf
PDF • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].