Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC NO 4 745 5 FIRST FLOOR 3RD STREET 6TH CROSS STREET MAHALAKSHMI NAGAR K PUDUR MADURAI 02 | MADURAI | MADURAI | TAMIL NADU | ₹1.2 Cr | L1 | Accepted-AOC L1 CONTRACTOR |
| 2 | L2₹1.2 Cr+₹1.2 L (1.05%)Rejected-Finance | ₹1.2 Cr+₹1.2 L (1.05%) | L2 | Rejected-Finance L2 CONTRACTOR |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
3 May 2023, 3:00 pmClosed
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
Madurai District Alanganallur Block Under MGSMT 2022-2023 Up gradation and Strengthening of 4 nos of Roads Package No TN MDU-ALA-02
2023_RDTN_302513_1
735/2023/D6/ALA02
Open Tender
Civil Works
Item Rate
180 days
ALANGANALLUR
Refer Tender document
4 documents required · 4 mandatory
₹0
₹1.2 L
24 Jun 2023
15 Apr 2023
3 May 2023
15 Apr 2023
3 May 2023
18 Apr 2023
Amount
1,Strengthening and Black Topping Road of Muduvarpatti PHC to Vellaiyampatti main Road KM 0/0-1/100 ( R- 187 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen information Board
Provision For Sign Boards
(i) Road Marker/ Road stud with lens Reflector
(ii)a. 60 cm Equilateral triangle cautionary signboard
2,Strengthening and Black Topping Road of Chatravellalapatti manthai to Karikattanpatti Kanmai Road KM 0/0-0/648 ( R- 103 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen information Board
Provision For Sign Boards
(i) Road Marker/ Road stud with lens Reflector
(ii)a. 60 cm Equilateral triangle cautionary signboard
3,Strengthening and Black Topping Road of Pallapatti burial ground Road KM 0/0-0/310 ( R- 153 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen information Board
Provision For Sign Boards
(i) Road Marker/ Road stud with lens Reflector
(ii)a. 60 cm Equilateral triangle cautionary signboard
4,Strengthening and Black Topping Road of Saranthangi to Peniel Road KM 0/0-1/140 ( R- 155 ) at Alanganallur Panchayat Union
Clearingthe Scrub jungle including all labour charges for burring and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20B
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg (SS - 1) per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat using Emulsion at the rate of 2.5 Kg (RS - 1) per ten square meter over Primed WMM surface preparatory to another bituminous construction over it.
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Povision for Name Board Cum Citizen information Board
Provision For Sign Boards
(i) Road Marker/ Road stud with lens Reflector
(ii)a. 60 cm Equilateral triangle cautionary signboard
1,Strengthening and Black Topping Road of Muduvarpatti PHC to Vellaiyampatti main Road KM 0/0-1/100( R- 187 ) at Alanganallur Panchayat Union
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
2,Strengthening and Black Topping Road of Chatravellalapatti manthai to Karikattanpatti Kanmai Road KM 0/0-0/648 ( R- 103 ) at Alanganallur Panchayat Union
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
3,Strengthening and Black Topping Road of Pallapatti burial ground Road KM 0/0-0/310 ( R- 153 ) at Alanganallur Panchayat Union
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
4,Strengthening and Black Topping Road of Saranthangi to Peniel Road KM 0/0-1/140 ( R- 155 ) at Alanganallur Panchayat Union
Towards the charges for routine maintenance of the road work executed under Bharat Nirman including dressing of bermsby refilling the gully with form berms, desilting of side drains and CD works , Whitewashing guardstones, painting of KM & HM stones,Parapets, cutting of breaches of trees, refixing displaced guard stones , caution boards, speed limit boards etc with the periodiocity for the above actitvities as prescribed in IRC SP 20-2002 and as directed by the departmental officers except for the constructional defects which has to be rectiufied by the contractor at his own cost.
For the second six months from the date of completion of work
For the second year from the date of completion of work
For the third year from the date of completion of work
For the fourth year from the date of completion of work
For the fifth year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SHARVAA ASSOCIATES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .