| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹6.3 L (5.23%)Admitted-Finance | ₹1.3 Cr+₹6.3 L (5.23%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹8.7 L (7.19%)Admitted-Finance | ₹1.3 Cr+₹8.7 L (7.19%) | L3 | Admitted-Finance |
| 4 | L4₹1.3 Cr+₹9.9 L (8.17%)Admitted-Finance OLD NO 5 NEW NO 7 LAKSHMI GARDENS 3RD FLOOR 4TH STREET RANGARAJAPURAM SRINAGAR COLONY SAIDAPET CHENNAI 600015 | CHENNAI | CHENNAI | TAMIL NADU | 600015 | ₹1.3 Cr+₹9.9 L (8.17%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | spkconstructionss L1 | CREATORS ENGINEERS AND INTERIORS PVT LTD L4 | Jaisakthi Constructions L2 | M/s. Selvalaskhmi Constructions L3 |
|---|---|---|---|---|---|---|---|
| 1.00Surface dressing of the ground including removing vegetation and in equalities not exceeding 15 cm deep and disposal of rubbish, with TTRS-SERC Campus etc., complete all as per the instruction of Engineer-in-charge. | |||||||
| 1.01 | All kinds of soil | 1,680 | Sqm | 45 ₹75,600 Lowest | 49 ₹82,320 | 47.5 ₹79,800 | 49 ₹82,320 |
| 2.00Dismantling and stacking within 50 metres lead fencing posts or struts including all earth work and dismantling of concrete etc., complete all as per the instruction of Engineer-in-charge. | |||||||
| 2.01 | RCC | 131 | Each | 312 ₹40,872 Lowest | 338 ₹44,278 | 328 ₹42,968 | 335 ₹43,885 |
| 3.00 | Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within TTRS-SERC Campus etc., complete all as per the instruction of Engineer-in-charge. | 1,520 | Kg | 48 ₹72,960 Lowest | 53 ₹80,560 | 51 ₹77,520 | 52 ₹79,040 |
| 4.00Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of within the campus etc., Complete all as per the instruction of Engineer-in-charge. | |||||||
| 4.01 | Hard rock (blasting prohibited) | 55 | Cum | 2,014 ₹1,10,770 Lowest | 2,175 ₹1,19,625 | 2,115 ₹1,16,325 | 2,155 ₹1,18,525 |
| 5.00Providing, driving with hydraulic piling rigs with power units and installing driven cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) : | |||||||
| 5.01 | 300 mm dia piles | 860 | Rm | 2,650 ₹22,79,000 Lowest | 2,862 ₹24,61,320 | 2,782 ₹23,92,520 | 2,835 ₹24,38,100 |
| 6.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete | 25 | Cum | 2,250 ₹56,250 Lowest | 2,430 ₹60,750 | 2,363 ₹59,075 | 2,408 ₹60,200 |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
4 Nov 2024, 6:00 pmClosed
Sr Technical Officer Civil
Engineering Works and Services Section, CSIR Campus, CSIR Road, Taramani, Chennai - 113
Construction of RCC Compound wall in TTRS-SERC campus, at Thirusulam, CSIR-SERC Chennai 600 043
2024_CSIR_211990_1
50(51)2024-2025/CW/SE
Open Tender
Civil Works - Buildings
Item Rate
240 days
CSIR-SERC-TTRS, Chennai
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹2.4 L
7 Feb 2025
21 Oct 2024
6 Nov 2024
21 Oct 2024
4 Nov 2024
21 Oct 2024
21 Oct 2024 - 4 Nov 2024
Amount
Surface dressing of the ground including removing vegetation and in equalities not exceeding 15 cm deep and disposal of rubbish, with TTRS-SERC Campus etc., complete all as per the instruction of Engineer-in-charge.
All kinds of soil
Dismantling and stacking within 50 metres lead fencing posts or struts including all earth work and dismantling of concrete etc., complete all as per the instruction of Engineer-in-charge.
Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within TTRS-SERC Campus etc., complete all as per the instruction of Engineer-in-charge.
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of within the campus etc., Complete all as per the instruction of Engineer-in-charge.
Hard rock (blasting prohibited)
Providing, driving with hydraulic piling rigs with power units and installing driven cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of shoe and the length of pile to be embedded in the pile cap etc. all complete. (Length of pile for payment shall be measured from top of shoe to the bottom of pile cap) :
300 mm dia piles
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. “(Note :- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately).
All works above plinth level upto floor V level
Concrete of M25 grade with minimum cement content of 330 kg / Cum
Centering and shuttering including strutting, propping etc. and removal of form for :
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc., CSIR-SERC name should be finished with outside of compound wall for every three metres etc., Complete all as per the innstruction of Engineer-in-charge.
Foundations, footings, bases of columns, etc. for mass concrete
Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. TTRS-SERC Campus etc., complete all as per the instruction of Engineer-in-charge.
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used etc., complete all as per the instruction of Engineer-in-charge.
With G.I. barbed wire
15 mm cement plaster on the rough side of single or half brick wall of mix : 1:4 (1 cement: 4 fine sand)
1:4 (1 cement : 4 fine sand)
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : (including necessary putty etc., complete all as per the instruction of Engineer-in-charge.
Water thinnable cement primer
Finishing walls with water proofing cement paint of required shade : (Exterior)
New work (Two or more coats applied @ 3.84 kg/10 sqm)
Jaisakthi Constructions (BID ID -763451)
M/s. Selvalaskhmi Constructions (BID ID -763274)
CREATORS ENGINEERS AND INTERIORS PVT LTD (BID ID -763185)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.11 MB
Tendernotice_2.pdf
PDF • 7.21 MB
Tendernotice_3.pdf
PDF • 20.20 MB
Tendernotice_4.pdf
PDF • 0.66 MB
Tendernotice_5.pdf
PDF • 1.72 MB
Tendernotice_6.pdf
PDF • 0.21 MB
BOQ_233007.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .