Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.3 L+₹1.5 L (30.7%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹6.6 L+₹1.8 L (36.9%)Rejected-AOC R O VILL GAUNA P O KAROUR TEHSIL NADAUN DISTT HAMIRPUR H P | HAMIRPUR | HIMACHAL PRADESH | 174304 | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | neelam kumar L2 | RAHUL SHARMA L1 | Vipan Kumar L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation , trecnches including jungle clearance (for pipes & pits) up to all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing of pumping out water, blasting soft/ hard rock or chiselling soft. Hard rock where blasting is prohibited all lifts including trimming and dressing of sides, levelling of beds to correct grade including shoring srtutting, planking, timbering and dewatering wherever required, stacking the usable and un-usable material/soil separately and after laying, jointing and testing of pipes returning the usable soil to trenches in 15cm (fifteen centimeters) layers including consolidating of such deposited layer by ramming and watering and then disposing of all surplus soil, un-usable materials as directed within all leads and lifts including rstoration of un-matalled surfaces to its original condition and also including cost of diversion of traffic, night signals, fixing caution boards, crossing over trenches for access to houses, etc. complete in all respects with in all leads and lifts as per direction of Engineer-in-charge. | 53.47 | Cum | 280 ₹14,971.6 | 225 ₹12,030.75 Lowest | 330 ₹17,645.1 |
| 2.00 | Providing and laying cement concrete 1:3:6(Icement:3sand:6 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth i/c carriage of materialcomplete in all respects with in all leads and lifts as per direction of Engineer-in-charge. | 3.37 | Cum | 6,100 ₹20,557 | 3,950 ₹13,311.5 Lowest | 6,250 ₹21,062.5 |
| 3.00Providing and laying cement concrete work 1:1.5:3) concrete mix with graded stone aggregate 20 mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in : | ||||||
| 3.01 | In foundation and plinth including carriage of material in complete in all respects with in all leads and lifts as per direction of Engineer-in-charge. | 8.42 | Cum | 7,600 ₹63,992 | 6,400 ₹53,888 Lowest | 7,700 ₹64,834 |
| 3.02 | Wall (any thickness but not less than 0.10m thickness)attached pillars,pilasters ,buttresses, plinths and string courses etc.from top of foundation level up to all floor level including carriage of material in complete in all respects with in all leads and lifts as per direction of Engineer-in-charge. | 14.41 | Cum | 8,000 ₹1,15,280 | 6,600 ₹95,106 Lowest | 8,200 ₹1,18,162 |
| 4.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring,shuttering,struting and propping etc with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for insitu,reinforced concrete and plain concrete and plain concrete work in:- | ||||||
| 4.01 | Vertical surfaces such as walls circular or curbed in plan of ( any thickness but not less than 0.1 meter thickness)attached pilasters, buttresses plinths and string courses etc. from top of foundation level up to all floor levels in complete in all respects with in all leads and lifts as per direction of Engineer-in-charge. | 165.4 | Sqm. | 395 ₹65,333 | 180 ₹29,772 Lowest | 400 ₹66,160 |
| 5.00Prov.form work of ordinary timber plankings so as to give a rough finish i/c centring, shuttering,strutting & propping etc. ht.of propping & centring below supporting floor to ceiling not exceeding 4 mts. & removal of the same for insitu-reinforced concrete & plain concrete work in :- | ||||||
| 5.01 | Arches beyond 6.00 mts.span | 28.8 | Sqm. | 2,250 ₹64,800 | 350 ₹10,080 Lowest | 2,300 ₹66,240 |
| 6.00 | Prov.in RCC work smooth finishing of the exposed surface with cement mortor1:3(1cement :3 sand ) | 79.87 | Sqm. | 175 ₹13,977.25 | 150 ₹11,980.5 Lowest | 200 ₹15,974 |
Tender Value
₹6.4 L
EMD Value
₹12,809
Closing Date
10 Jul 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Jal Shakti Division Thanakalan
C/O Sub storage tank of 100000 Ltrs. Capacity at village Hatli Patialan
2025_HPIPH_109300_1
UNA-UNA03-733
Open Tender
Civil Works
Lump-sum
90 days
Thanakalan
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
EE Jal Shakti Division Thanakalan
₹12,809
26 Nov 2025
3 Jul 2025
11 Jul 2025
3 Jul 2025
10 Jul 2025
3 Jul 2025
3 Jul 2025 - 10 Jul 2025
Amount
Excavation in foundation , trecnches including jungle clearance (for pipes & pits) up to all depths in all classification of earth work such as pick work, jumper work, saturated soil including bailing of pumping out water, blasting soft/ hard rock or chiselling soft. Hard rock where blasting is prohibited all lifts including trimming and dressing of sides, levelling of beds to correct grade including shoring srtutting, planking, timbering and dewatering wherever required, stacking the usable and un-usable material/soil separately and after laying, jointing and testing of pipes returning the usable soil to trenches in 15cm (fifteen centimeters) layers including consolidating of such deposited layer by ramming and watering and then disposing of all surplus soil, un-usable materials as directed within all leads and lifts including rstoration of un-matalled surfaces to its original condition and also including cost of diversion of traffic, night signals, fixing caution boards, crossing over trenches for access to houses, etc. complete in all respects with in all leads and lifts as per direction of Engineer-in-charge.
Providing and laying cement concrete 1:3:6(Icement:3sand:6 graded stone aggregate 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth i/c carriage of materialcomplete in all respects with in all leads and lifts as per direction of Engineer-in-charge.
Providing and laying cement concrete work 1:1.5:3) concrete mix with graded stone aggregate 20 mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in :
In foundation and plinth including carriage of material in complete in all respects with in all leads and lifts as per direction of Engineer-in-charge.
Wall (any thickness but not less than 0.10m thickness)attached pillars,pilasters ,buttresses, plinths and string courses etc.from top of foundation level up to all floor level including carriage of material in complete in all respects with in all leads and lifts as per direction of Engineer-in-charge.
Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring,shuttering,struting and propping etc with wooden battens and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for insitu,reinforced concrete and plain concrete and plain concrete work in:-
Vertical surfaces such as walls circular or curbed in plan of ( any thickness but not less than 0.1 meter thickness)attached pilasters, buttresses plinths and string courses etc. from top of foundation level up to all floor levels in complete in all respects with in all leads and lifts as per direction of Engineer-in-charge.
Prov.form work of ordinary timber plankings so as to give a rough finish i/c centring, shuttering,strutting & propping etc. ht.of propping & centring below supporting floor to ceiling not exceeding 4 mts. & removal of the same for insitu-reinforced concrete & plain concrete work in :-
Arches beyond 6.00 mts.span
Prov.in RCC work smooth finishing of the exposed surface with cement mortor1:3(1cement :3 sand )
Providing & laying cement concrete 1:1.5:3(1cement :1.5 sand : 3 graded stone aggregate 20 mm nominal size) & curing complete excluding the cost of form work & reinforcement for RCC work in :-
(i) Suspended floor,roofs,landing & shelves & their support balconies,beams,girders,bressumers & cantilever upto floor level.
(ii) Arches upto floor two level.
Providing Tor steel reinforcement for RCC work i/c bending,binding & placing complete upto floor two level.
Steel work welded in built up sections,trusses & framed work i/c cutting,hoisting & fixing in position & applying a priming coatof red paint :- In grating, framed ,guards,bars, ladders,railing,brackets & similar works.
laying in trenches GMS/MS Tubes (L/M class) tube fitting (Earth work in trenches to be measured & paid for separately)
Providing & fixing CI Sluice valve (with hand wheel) as per IS : 780-1984 class-I upto 300 mm dia.(i/c brass spindle & as per 2906-1984 class-II for dia.> 300 mm) complete with bolts nuts,rubber insertion etc.,(the tail piece if required shall be measured & paid for separatly)
Constructing chamber for sluice valve, with CI surface box 100 mm top dia.,160 mm bottom dia. & 180 mm deep(inside) with chained lid RCC top 1:2:4 mix (1 cement :2 sand :4 graded stone aggregate 20 mm nominal size) 100mm thick foundation concrete 1:5:10 mix (1cement : 5 sand : 10 graded stone aggregate 40 mm nominal size) & inside plastering with cement mortor 1 :3 (1 cement : 3 sand) finished with a floating coat of neat cement i/c curing complete. 600 x 600 x 750 mm inside size With 150 mm thick walls of RCC 1:2 :4 (1 cement :2 sand :4 graded stone aggregate 20mm nominal size) complete with form work & reinforcement with 6 mm bars at not exceeding 150 mm centres both ways
Prov. & fixing SFRC Man hole cover with frame having frames size of 560 mm internal dia.should not be less than 100 kg
neelam kumar (BID ID -532998)
Vipan Kumar (BID ID -533351)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .