Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-Finance NARAN PALLY PURBO BARDHAMAN PIN 713 101 | PURBA BARDHAMAN | WEST BENGAL | 713101 | L1 | Accepted-Finance Quoting Lowest Rate | |
| 2 | L2₹12.8 L+₹2.6 L (25.9%)Rejected-Finance GR 8 ADDA BUILDING 1ST FLOOR CITY CENTRE DURGAPUR 16 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | L2 | Rejected-Finance Quoting Higher Rate | |
| 3 | L3₹13.0 L+₹2.8 L (28.0%)Rejected-Finance DVC PARA MEMARI PURBA BARDHAMAN | MEMARI | PURBA BARDHAMAN | WEST BENGAL | L3 | Rejected-Finance Quoting Higher Rate | |
| 4 | Rejected-Technical | - | Rejected-Technical Insufficient Documents |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
28 Dec 2022, 3:00 pmClosed
Office of the Superintending Engineer, Western Ele
Office of the Superintending Engineer, Western Electrical Circle , PWD, Purta Bhavan, 1st floor, Burdwan-713103
Annual fuel consumption of 250KVA, 3phase 50Hz DG set at District court and District Judges Bungalow, Asansol round the clock in the District of Paschim Bardhaman, for one year.
2022_WBPWD_433536_1
WBPWD/SEWEC /AED /NIQ-113/2022-23
Open Tender
ELECTRICAL WORKS ORG
Item Rate
14 days
Asansol
Please refer Tender documents.
5 documents required · 5 mandatory
₹20,000
Office of the Superintending Engineer, Western Ele
11 Jan 2023
14 Dec 2022
30 Dec 2022
14 Dec 2022
28 Dec 2022
16 Dec 2022
14 Dec 2022 - 15 Dec 2022
15 Dec 2022
Amount
Fuel Consumption of 250 KV , 3phase DG Set at District Court,Asansol in the District of Paschim Bardhaman,for the period of 1(one) year including Holidays round the clock with Avg.1 hr. WBSEDCL shutdown. Diesel price on 21/11/2022
Carrying filling cost including profit along with any other Charges @ 2.5% of item No.1
TERMS & rONDTTTONS:- i) The Agency must engage one no skilled operator per Shift having sufficient knowledge for operation of the D.G .Set satisfactorily. Checking and handling of all elect, connections viz .AMF Panel Board, Change over switch incl. replacement of fuses to be done by a licensed wireman by the Agency free of cost. ii) One Log Book must be kept in site by the Agency in which recording of operation time, reading of Voltmeter, Ammeter, Temperature, Pressure etc. incl. cases of fault/ breakdown, if any, must be incorporated with signature of operator and countersigned by Work-Asstt ./S.A.E./ Authority concern as the case may be.
The operational staff of the Agency must checked followings for satisfactory running of the D.G. Set. a) Engine and Main alternator incl. necy. adjustment. b) Engine oil level, water level of radiator, clean air cleaner element, drain sediments, all belts, batteries incl. its tapping and charging equipments (Replacement of belts and supply of distilled water to be borne by the Agency free of cost.]
Speed and frequency of D.G. Set must be maintained as per I.E. Rules. 10) Diesel oil consumption will be as follows : a) Off-load running ……. Ltrs./hour. b) On-load running….. Ltrs./hour. For 250 KVA D.G. Set
Penalty may be imposed for non-operation of the D.G. Set in time as well as for absence of the operational staff. The decision of the Executive Engineer will be final in this respect.
The Agency will be responsible for any damage to the D.G. Set due to mishandling/mal-operation by the Operational staff; the cost there of will be recovered from the Agency's Bill.
The agreement of contract is terminable with one months notice from either side without assigning any reason what so- ever.
Rate should be quoted both in figures & words No. price variation clause will be accepted
Quarterly Bill in quadruplicate copies will be submitted to the S.A.E. by the Agency.
DURGAPUR POWER
KOUSHIK MONDAL
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .