Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC 171 GLOBEL SPACE HUDA GLOBEL SPACE COLONY 125055 | SIRSA | HARYANA | 125055 | ₹5.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.2 L+₹44,580 (7.72%)Rejected-AOC | ₹6.2 L+₹44,580 (7.72%) | L2 | Rejected-AOC L2 |
| 3 | L3₹6.6 L+₹80,180 (13.9%)Rejected-AOC | ₹6.6 L+₹80,180 (13.9%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | M/S SURENDRA KUMAR KAUSHIK L3 | VIKAS CONSTRUCTION COMPANY L1 | M/S SATT SAHIB CONSTRUCTION CO L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in silt clearnce of internal section i/c lift upto 1.50m and intitial lead including ramming and dressing by manual labour. The earth from clearence to be used in side embankment or to be disposed off spoil bank or as directed by engineer in charge i/c cost of all labour T&P etc. Complete | 6,150 | M3 | 32 ₹1,96,800 | 22 ₹1,35,300 Lowest | 29 ₹1,78,350 |
| 2.00 | Cleaning thick Bushes & throny jungle without uprooting with Disposal i/c all cost of labour T&P etc/ complete | 5,500 | M2 | 3 ₹16,500 | 2.2 ₹12,100 Lowest | 3 ₹16,500 |
| 3.00 | Uprooting Jhoond including back filling with dressing i/c all cost of labour T&P etc. complete | 610 | Nos | 25 ₹15,250 | 21 ₹12,810 Lowest | 26 ₹15,860 |
| 4.00 | E/w in silt clearance of extra slush and lahel, lead upto 1.00 km & lift upto 1.50 m i/c ramming dressing etc. complete | 2,960 | M3 | 145 ₹4,29,200 | 141 ₹4,17,360 | 139 ₹4,11,440 Lowest |
Tender Value
₹8.5 L
EMD Value
₹17,000
Closing Date
8 Jun 2026, 5:00 pmClosed
EE UDEYC, Saharanpur
Office of the EE UDEYC, Saharanpur
Clearance work of the internal Section of Rampuri Drain between Km 1.900 to 10.862
2026_UPIDC_1156496_12
01/EE/UDEYC/2026-27
Open Tender
Civil Works
Item Rate
15 days
Rampuri Drain
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹17,000
Office of the EE UDEYC, Saharanpur
5 Sept 2026
3 Jun 2026
9 Jun 2026
3 Jun 2026
8 Jun 2026
3 Jun 2026
3 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in silt clearnce of internal section i/c lift upto 1.50m and intitial lead including ramming and dressing by manual labour. The earth from clearence to be used in side embankment or to be disposed off spoil bank or as directed by engineer in charge i/c cost of all labour T&P etc. Complete | - | M3 | - | - |
| 2 | Cleaning thick Bushes & throny jungle without uprooting with Disposal i/c all cost of labour T&P etc/ complete | - | M2 | - | - |
| 3 | Uprooting Jhoond including back filling with dressing i/c all cost of labour T&P etc. complete | - | Nos | - | - |
| 4 | E/w in silt clearance of extra slush and lahel, lead upto 1.00 km & lift upto 1.50 m i/c ramming dressing etc. complete | - | M3 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.18 MB
BOOKLETPDF.pdf
Tender Documents • 3.61 MB
BOQ_2167042.xls
BOQ • 0.26 MB
Corrigendum09Drain09Jun.pdf
PDF • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .