Tender Value
₹2.5 Cr
EMD Value
₹6.3 L
Closing Date
17 Oct 2026, 4:30 pm
ACE, N/E, SWD
Office of Additional Chief Engineer(N/E), Social Welfare Department Samaj Kalyan Bhawan, Lumsey , Tadong Gangtok, East Sikkim
Construction of Badminton Academy, Rangthu Ralap, Khamdong, Gangtok District, Sikkim
2026_EWD_918_1
2/SWD/EC/NIT/2026-27/124
Open Tender
Civil Works - Others
Works
Gangtok District
Please refer Tender documents.
3 documents required · 3 mandatory
₹30,000
0235-0-800-03-other Misc receipts-Cost
₹6.3 L
O/o ACE, N/E, SWD
17 Sept 2026
17 Sept 2026
26 Oct 2026
17 Sept 2026
17 Oct 2026
17 Sept 2026
28 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS | - | - | - | - |
| 2 | Earthwork in excavation in all kinds of soils in foundation trenches including dressing of all sides, watering and ramming including disposal of excavated earth up to 30m lead and lift up to 1.5m all complete. | 984.35 | cum | 295.52 | ₹2,90,895.11 |
| 3 | Providing and laying hand packed stone soling in buildings works with clean hard selected stones, all complete. | 63.49 | cum | 911.6 | ₹57,877.48 |
| 4 | Providing and Laying in position cement concrete of 1:2:4 mix including compacting curing etc all complete. | 63.49 | cum | 5,923.74 | ₹3,76,098.25 |
| 5 | Providing and laying Coarse Rubble Stone Masonry with hammer dressed clean hard selected stone in 1:3:6 c.c. (1 cement, 3 sand, 8 clean hard graded stone ships of size 40mm) and curing etc, complete as per the direction of Engineer in Charge excluding the cost of carriage of materials. | 113.56 | cum | 5,078.43 | ₹5,76,706.51 |
| 6 | Filling inside plinth in building works with 23cm layers, consolidated to 15cm including watering, ramming etc, all complete. | 721.22 | cum | 257.03 | ₹1,85,375.18 |
| 7 | Providing and Laying in position reinforced cement concrete in 1:1.5:3 mix excluding the cost of form work, finishing and reinforcements. | 188.06 | cum | 6,885.24 | ₹12,94,838.23 |
| 8 | Supplying, bending and placing in position tor steel and mild steel reinforcement in all R.C.C works including cost of binding wires, all complete. | 253.88 | qtls | 8,038.55 | ₹20,40,827.07 |
| 9 | Providing, fixing and removing form works for RCC works all complete. (With timber imported from outside the state) for Footings | 103.73 | sqm | 985.56 | ₹1,02,232.14 |
| 10 | Providing, fixing and removing form works for RCC works all complete. (With timber imported from outside the state) for Beams, Tiebeams & Sill beams | 569.84 | sqm | 936.51 | ₹5,33,660.86 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
SBDBATMINTONCOURT.pdf
Tender Documents • 1.35 MB
BOQ_991.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .