Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAdmitted-Finance ALINAGAR KHOTTADIH BARDDHAMAN BARDDHAMAN 713378 WEST BENGAL INDIA | BARDDHAMAN | BARDDHAMAN | WEST BENGAL | 713378 | ₹10.3 L | L1 | Admitted-Finance |
| 2 | L2₹10.7 L+₹41,612 (4.03%)Admitted-Finance 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | ₹10.7 L+₹41,612 (4.03%) | L2 | Admitted-Finance |
| 3 | L3₹11.7 L+₹1.4 L (13.3%)Admitted-Finance | ₹11.7 L+₹1.4 L (13.3%) | L3 | Admitted-Finance |
| 4 | L4₹12.4 L+₹2.1 L (20.3%)Admitted-Finance AR 3 7D 7TH FLOOR ASHIYANA RESIDENCY PANDAVESWAR PASCHIM BARDHAMAN WEST BENGAL INDIA 713206 | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713206 | ₹12.4 L+₹2.1 L (20.3%) | L4 | Admitted-Finance |
| 5 | L5₹13.4 L+₹3.1 L (29.9%)Admitted-Finance NATUNDANGA BANAGRAM BARDHAMAN 713381 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713381 | ₹13.4 L+₹3.1 L (29.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NAYAK ENTERPRISE L3 | MAZUMDER ELECTRICAL L2 | ABHIJIT MONDAL L1 | CHAKRABORTY ELECTRICAL L4 | ENERGY ENGINEERING L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Fabrication and erection of 10 nos of Lighting tower at SS Siding, Khottadih OCP under Pandaveswar Area. (Inclusive of EPF/CMPF) | ||||||||
| 1.01 | Material required of making of ladder in 13 mtr. Pole | 576 | Kgs | 74 ₹42,624 | 76 ₹43,776 | 61 ₹35,136 Lowest | 73.15 ₹42,134.4 | 83 ₹47,808 |
| 1.02 | Material required of making of top box for light fitting | 468 | Kgs | 74 ₹34,632 | 76 ₹35,568 | 61 ₹28,548 Lowest | 73.15 ₹34,234.2 | 83 ₹38,844 |
| 1.03 | Cost of fabrication of ladder | 12 | Nos | 8,055 ₹96,660 | 6,860 ₹82,320 | 6,650 ₹79,800 Lowest | 6,678.5 ₹80,142 | 9,000 ₹1,08,000 |
| 1.04 | Cost of fabrication of top box | 12 | Nos | 5,817 ₹69,804 | 4,200 ₹50,400 Lowest | 4,800 ₹57,600 | 4,278.8 ₹51,345.6 | 6,500 ₹78,000 |
| 1.05 | Cost of painting double coat with red oxide | 24 | L | 492 ₹11,808 | 300 ₹7,200 Lowest | 400 ₹9,600 | 323.95 ₹7,774.8 | 550 ₹13,200 |
| 1.06 | Cost of painting double coat with silver colours | 24 | L | 716 ₹17,184 | 460 ₹11,040 Lowest | 590 ₹14,160 | 573.8 ₹13,771.2 | 800 ₹19,200 |
| 1.07 | Cost of erection of tubular pole | 10 | Nos | 6,265 ₹62,650 | 4,860 ₹48,600 Lowest | 5,100 ₹51,000 | 5,374.15 ₹53,741.5 | 7,000 ₹70,000 |
| 1.08 | Cost of transportation and handling for fabrication of workshop | 10 | Nos | 3,132 ₹31,320 | 1,750 ₹17,500 Lowest | 2,550 ₹25,500 | 2,034.9 ₹20,349 | 3,500 ₹35,000 |
| 1.09 | Supply & Fitting of 300 W LED light | 60 | Nos | 11,187 ₹6,71,220 | 8,460 ₹5,07,600 Lowest | 9,250 ₹5,55,000 | 10,983.42 ₹6,59,005.5 | 12,500 ₹7,50,000 |
Tender Value
₹15.4 L
EMD Value
₹19,400
Closing Date
13 Aug 2026, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Fabrication and erection of 10 nos of Lighting tower at SS Siding, Khottadih OCP under Pandaveswar Area
2026_ECL_362953_1
GM-PND/EandM/26-27/75/2431 dated 31/07/2026
Open Tender
Electrical and Maintenance Works
Item Rate
60 days
Khottadih OCP
Please refer Tender documents.
5 documents required · 5 mandatory
₹19,400
21 Sept 2026
3 Aug 2026
14 Aug 2026
3 Aug 2026
13 Aug 2026
3 Aug 2026
3 Aug 2026 - 6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Fabrication and erection of 10 nos of Lighting tower at SS Siding, Khottadih OCP under Pandaveswar Area. (Inclusive of EPF/CMPF) | |||||
| 1.01 | Material required of making of ladder in 13 mtr. Pole | 576 | Kgs | - | - |
| 1.02 | Material required of making of top box for light fitting | 468 | Kgs | - | - |
| 1.03 | Cost of fabrication of ladder | 12 | Nos | - | - |
| 1.04 | Cost of fabrication of top box | 12 | Nos | - | - |
| 1.05 | Cost of painting double coat with red oxide | 24 | L | - | - |
| 1.06 | Cost of painting double coat with silver colours | 24 | L | - | - |
| 1.07 | Cost of erection of tubular pole | 10 | Nos | - | - |
| 1.08 | Cost of transportation and handling for fabrication of workshop | 10 | Nos | - | - |
| 1.09 | Supply & Fitting of 300 W LED light | 60 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.33 MB
BOQ_375868.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .