Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.7 CrAccepted-AOC | ₹16.7 Cr | L1 | Accepted-AOC Being L1 bidder |
| 2 | L2₹18.8 CrRejected-Finance | ₹18.8 Cr | L2 | Rejected-Finance Being L2 bidder |
| 3 | L3₹20.1 CrRejected-Finance | ₹20.1 Cr | L3 | Rejected-Finance Being L3 bidder |
Tender Value
Refer Docs
EMD Value
₹35 L
Closing Date
28 Feb 2022, 5:00 pmClosed
DGM Engg
Faridabad Smart City Limited 3rd Floor, Nain Sadan Building Plot No. 35, 20A, Faridabad
DESIGN BUILD OPERATE AND MAINTAIN FOR 5 YEARS INCLUDING 1 YEAR DLP MECHANIZED AUTOMATIC MULTI LEVEL CAR PARKING FACILITY FOR MINIMUM 100 CARS ON AMBEDKAR MARG AT OLD SABZI MANDI FARIDABAD ON EPC MODEL UNDER SCM
2022_HRY_206593_1
FSCL/2022/208
Open Tender
Civil Works
270 days
Faridaabd
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹35 L
FSCL Office
1 Apr 2022
4 Feb 2022
1 Mar 2022
4 Feb 2022
28 Feb 2022
15 Feb 2022
9 Feb 2022
Amount
SEWERAGE SYSTEM
Design, manufacturing, Supply, installation, testing, commissioning & of G+5 / (Multi-level) with Electro Mechanical technology to accommodate for a total number of 100 (minimum) cars with suitable steel structure frame work, Independent motorized units having up/down/lateral movement which can take the load of 2500 kg. capacity including PLC with HMI operation and electrical installation etc.as per scope and specification & direction of Engineer In Charge. The system shall be designed to accommodate cars up to size 5200 mm length and 2100 mm width and height 2100mm (SUV) for minimum two floor and 1700 mm for other floors, with average parking time not more than 180 seconds, including parking management system and accessories complete in all respect (Boom barrier and CCTV, ANPR surveillance cameras), Including Foundation, underground water tank (1.5 lakh capacity), overhead tank with 10000 ltr. capacity and fire staircase with fire path as per latest fires norms. Retaining wall and all Civil & PHE and Electrical works, power back-up, including elevation etc. complete as per technical specification, scope of work mentioned in RFP and directions of Engineer in charge
Operation of 100 number of ECS (MLCP) after the physical completion of Automated Multi Level Car Parking System
1st year (Operation Cost)
2nd year (Operation Cost)
3rd year (Operation Cost)
4th year (Operation Cost)
5th year (Operation Cost)
Annual Comprehensive maintenance of 100 number of ECS after the physical completion of automated car parking system (including 1 year of Defect liability period)
1st year (Maintenance)
2nd year (Maintenance)
3rd year (Maintenance)
4th year (Maintenance)
5th year (Maintenance)
Sotefin Parking Private Limited
Wohr Parking Pvt Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid