| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹1.3 L+₹3,088.50 (2.51%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹1.3 L+₹5,559.30 (4.52%)Rejected-Finance 34 KALI TEMPLE ROAD KOLKATA KOLKATA KOLKATA 700026 | KOLKATA | WEST BENGAL | 700026 | L3 | Rejected-Finance L3 |
Tender Value
₹1.2 L
EMD Value
₹2,500
Closing Date
30 Oct 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE C BR_VIII
172/5, R.B. AVE KOL-29
CONSTRUCTION OF SEMI UNDERGROUND WATER TANK FOR CHHATH PUJA PREPARATION IN CORNFIELD ROAD IN WARD NO 68, BR VIII.
2026_KMC_1044760_1
KMC/EEC/VIII/068/05/26-27/R
Open Tender
CIVIL WORKS
Percentage
30 days
IN WARD NO 68
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2,500
2 Nov 2026
8 Oct 2026
2 Nov 2026
8 Oct 2026
30 Oct 2026
8 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CHAPTER - VIII SUPPLYING OF MATERIALS HIRE CHARGES OF MACHINERIES 8.27Hire charges of moveable type mounted earth excavator having minimum cutter size (1.0 cubic meter) & loader size (2.0 meter length x 0.75m width) for cutting & removal of any kind of soil, spoli etc. including cost of fuel, lubricants & manpower etc. in Water Supply Works. [ This item will be operated on prior permission from the concerned SE/Dy. Chief Engineer] For minimum engagement of 8 hrs. In a day | 3 | DAY | 8,951 | ₹26,853 |
| 2 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 0.08 | %M3 | 93,621 | ₹7,489.68 |
| 3 | BUILDING WORKS ( C ) BRICKWORKS, CONCRETE WORKS Etc. A. BRICK WORKS 1. Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 55.3 | SQM | 358 | ₹19,797.4 |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth | 5.6 | M3 | 5,575 | ₹31,220 |
| 5 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster | 54.28 | SQM | 186 | ₹10,095.71 |
| 6 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 15 Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. | 54.01 | SQM | 34 | ₹1,836.34 |
| 7 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC. 1. Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof. | 4.38 | M3 | 447 | ₹1,957.86 |
| 8 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 8. Pumping out water from ponds or tanks .(Payment if permitted will be made on the quantity of water calculated on the basis of initial water level and final level on consideration being made for any water that may have been added through percolation or otherwise). | 0.59 | %M3 | 1,044 | ₹615.96 |
| 9 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : With other than hi-gloss of approved quality-(iii) One coat (with any shade except white) | 79.01 | SQM | 48 | ₹3,792.48 |
| 219 | Sub Total | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
TF.pdf
Tender Documents • 1.08 MB
civil_oid_compressed.pdf
Additional Documents • 1.12 MB
BOQ_2562009.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .