| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹5.2 L+₹37,815.70 (7.90%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹6.3 L+₹1.5 L (32.3%)Admitted-Finance R O BRAGTA BHAWAN CHOTTA SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | L3 | Admitted-Finance | |
| 4 | L4₹6.5 L+₹1.7 L (35.3%)Admitted-Finance SHIMLA MUNICIPAL CORPORATION | SHIMLA | HIMACHAL PRADESH | 171001 | L4 | Admitted-Finance | |
| 5 | L5₹6.8 L+₹2.0 L (41.1%)Admitted-Finance R O BRAGTA BHAWAN CHOTTA SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Ashu Chauhan L4 | DEEP RAM L3 | Kapil Chand L5 | Bilal Ahmed L1 | VIKAS KASHYAP L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 8 | P.Cum | 360 ₹2,880 | 348 ₹2,784 | 500 ₹4,000 | 150 ₹1,200 Lowest | 220 ₹1,760 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 10.4 | P.cum | 4,900 ₹50,960 | 4,857 ₹50,512.8 | 5,000 ₹52,000 | 3,200 ₹33,280 Lowest | 4,200 ₹43,680 |
| 3.00 | Providing and laying in position specified grade of cement concrete, excluding the cost of centering, shuttering, All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 38.84 | P.cum | 6,500 ₹2,52,460 | 6,455 ₹2,50,712.2 | 7,000 ₹2,71,880 | 5,700 ₹2,21,388 Lowest | 6,420 ₹2,49,352.8 |
| 4.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 57.46 | P.cum | 1,400 ₹80,444 | 1,358 ₹78,030.68 | 1,400 ₹80,444 | 10 ₹574.6 Lowest | 100 ₹5,746 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 54 | P.Sqm | 470 ₹25,380 | 463 ₹25,002 | 500 ₹27,000 | 90 ₹4,860 Lowest | 150 ₹8,100 |
| 6.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 979.44 | P.Kg | 110 ₹1,07,738.4 | 105 ₹1,02,841.2 | 110 ₹1,07,738.4 | 104 ₹1,01,861.76 Lowest | 104 ₹1,01,861.76 Lowest |
| 7.00 | P/L Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand).Medium shade pigment using 50% Grey & 50% red including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 75.17 | P.sqm | 1,450 ₹1,08,996.5 | 1,398 ₹1,05,087.66 | 1,500 ₹1,12,755 | 1,340 ₹1,00,727.8 | 1,290 ₹96,969.3 Lowest |
| 8.00 | 15 mm cement plaster in single coat on Rough side of brick/Concrete /stone walls for interior plastering up to all floor level including arises internal rounded angles chamfers and or rounded angles not exceeding 80 mm in grith and finished even and smooth in cement motar 1:6 (1 cement : 6 Sand) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 28.8 | P. Sqm | 380 ₹10,944 | 366 ₹10,540.8 | 400 ₹11,520 | 290 ₹8,352 | 200 ₹5,760 Lowest |
| 9.00 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 79.25 | P.Sqm | 100 ₹7,925 | 94 ₹7,449.5 | 100 ₹7,925 | 80 ₹6,340 | 40 ₹3,170 Lowest |
Tender Value
₹6.3 L
EMD Value
₹12,700
Closing Date
25 Sept 2026, 5:00 pmClosed
Executive Engineer R B M C Shimla
Executive Engineer R B M C Shimla
RM of path from Ara Machine to Kothill in ward No2 Ruldu Bhatta SHPL C.C 124 steel work and precast tiles etc
2026_MC_143688_4
2893dated14092026
Open Tender
Civil Works
Item Rate
60 days
Shimla
Please refer to tender documents
7 documents required · 7 mandatory
₹413
Executive Engineer R B MC Shimla
₹12,700
3 Oct 2026
18 Sept 2026
26 Sept 2026
18 Sept 2026
25 Sept 2026
18 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 8 | P.Cum | 100 | ₹800 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 10.4 | P.cum | 100 | ₹1,040 |
| 3 | Providing and laying in position specified grade of cement concrete, excluding the cost of centering, shuttering, All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 38.84 | P.cum | 101 | ₹3,922.84 |
| 4 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 57.46 | P.cum | 102 | ₹5,860.92 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for : Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 54 | P.Sqm | 103 | ₹5,562 |
| 6 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 979.44 | P.Kg | 104 | ₹1,01,861.76 |
| 7 | P/L Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand).Medium shade pigment using 50% Grey & 50% red including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 75.17 | P.sqm | 105 | ₹7,892.85 |
| 8 | 15 mm cement plaster in single coat on Rough side of brick/Concrete /stone walls for interior plastering up to all floor level including arises internal rounded angles chamfers and or rounded angles not exceeding 80 mm in grith and finished even and smooth in cement motar 1:6 (1 cement : 6 Sand) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 28.8 | P. Sqm | 106 | ₹3,052.8 |
| 9 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufacture including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 79.25 | P.Sqm | 107 | ₹8,479.75 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.63 MB
Tendernotice_2.pdf
PDF • 0.70 MB
Tendernotice_3.pdf
PDF • 0.36 MB
BOQ_213553.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .