| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.8 LAccepted-AOC | L-1 | Accepted-AOC Accepted as L-1 | |
| 2 | L-2₹6.3 L+₹47,159 (8.07%)Rejected-AOC GOYAL NIWAS POWER HOUSE ROAD SAPRRON SOLAN H P | SOLAN | SOLAN | HIMACHAL PRADESH | L-2 | Rejected-AOC Rejected | |
| 3 | L-3₹7.3 L+₹1.5 L (25.4%)Rejected-AOC | L-3 | Rejected-AOC Rejected |
Tender Value
₹7.7 L
EMD Value
₹19,253
Closing Date
28 Jul 2021, 4:00 pmClosed
Superintending Engineer
SE (OP) Circle, HPSEBL, Solan
E Tendering for partial work on turnkey basis for Construction of 11 KV HT Line 11 0.4 kV 63 KVA Sub Station along with 3 phase LT line in village Bagana Suro at Sewala in Electrical Sub Office Chail under Electrical Sub Division HPSEBL Kandaghat
2021_HPSEB_49875_1
07-2021-22
Open Tender
Electrical Works
Turn-key
90 days
Solan
A Class License from Chief Electrical Inspector
4 documents required · 4 mandatory
₹1,180
₹19,253
4 Aug 2021
15 Jul 2021
29 Jul 2021
15 Jul 2021
28 Jul 2021
17 Jul 2021
15 Jul 2021 - 17 Jul 2021
Amount
Material Part for 11 KV line
Dead End Structures: (Adopt three (3) No. per Km) on Double Pole (Prefer along road side)
Belt Set - MS Angle Iron: 50x50x6, Length [1700 mm x 2 No.]
X-Bracing Set - MS Angle Iron: 50x50x6, Length [2125 mm x 2 No.]
X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length [2400 mm x 2 No.]
Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)
11 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure (Provided by HPSEBL only Erection required)
HT Stay / Guy Arrangement
Stay set complete in all respect (1No. / Single Pole , 4 No. / Double Pole Structures) (Provided by HPSEBL only Erection required)
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
Earthing
HT Earthing set complete
Single Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m (Provided by HPSEBL only Erection required)
Eye Hook for earth wire
Earth Wire Clamp
Half clamps
Full clamps
Danger Plate (250X200X1.6 mm) (Provided by HPSEBL only Erection required)
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Barbed Wire
Aluminium Paint
G.O Switch Unit (11 kV, 400A, 25 kA )
D.O Fuse Unit
X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm] for supporting DO fuse unit & GO switch
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm]
ACSR 6/1/4.09 (80mm²) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage} (Provided by HPSEBL only Erection required)
Steel Tubular Pole 11 mtr. Long (Provided by HPSEBL only Erection required)
Muffs with concerete filling
Run Thro' Structures (∆ Formation): on Single Pole Structures (Adopt Eight (8) No. Run-through Structures per Km)
Cross Arm: [Channel Iron (100x50x6 mm), Length 1800 mm
Angle Iron (50x50x6 mm), Length (2x750) mm
Pole Top Bracket
11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure (Provided by HPSEBL only Erection required)
Material of 11/0.4 KV, 63 KVA Sub Station
Distribution Transformer (Ordinary), 11/0.4 kV, 63 KVA (Provided by HPSEBL only Erection required)
Steel Tubular Poles 9 m (Provided by HPSEBL only Erection required)
Muffs with concerete filling
G.O Switch Unit (11 kV, 400A, 25 kA )
D.O Fuse Unit
Surge Arrester, 18 kV Station Class (Porcelain Type)
Discs insulator sets (comprising 2 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
Stay set complete (Provided by HPSEBL only Erection required)
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
Pipe Earthing Set (Provided by HPSEBL only Erection required)
LT Distribution Panel Box With MCCB(100A, 10KA, 4P, 1No) & SFU(32A, 4No, rewirable) (Provided by HPSEBL only Erection required)
Half Clamp (M.S. Flat 50X6 mm)
Full Clamps (M.S. Flat 50X6 mm)
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Aluminium Thimble (Provided by HPSEBL only Erection required)
Aluminium Thimble (Provided by HPSEBL only Erection required)
Danger Plate (Provided by HPSEBL only Erection required)
Barbed Wire
LT Cable (3.5 Core) 70 mm² (Provided by HPSEBL only Erection required)
Energy Meter (3-Phase, 4-Wire) DLMS compliant 100 A CT Type for 63 KVA Transformer
Aluminium Paint.
LT Switched Capacitors 27-KVAr for 63 KVA (rate per KVAr)
Chain Link Fencing, Angle Iron Gate etc. for transformer fencing
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 4 Nos
X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of Transformer
MS Angle Iron (50X50x6 mm), Length : 2800 mm x (1 Nos for LA's + 2 No. for Dist Panel Box)
Transformer Belting & Knee Bracing
MS Angle Iron (50X50x6 mm), Length : 2800 mm x 4 Nos
MS Angle Iron (35X35x5 mm), Length: 460 mm x 2 Nos
Transformer bed supporting arm - MS Angle Iron: 50x50x6, Length 750 mm
Material part for LT line
ACSR 6/1/3.35 (50mm²) (Provided by HPSEBL only Erection required)
Steel Tubular Pole 9 mtr. Long (Provided by HPSEBL only Erection required)
Muffs with concerete filling
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Aluminium Paint
Spiral PVC Spacer
Shackle Insulator (16 kN)
D-Iron (U- Clamps)
Earth Knob
LT Stay Set (Provided by HPSEBL only Erection required)
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
Stay Clamp & Guy Insulator
Full Clamps [ 2 No for A.I + 1 No for Stay Set]
Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m (Provided by HPSEBL only Erection required)
Spool Tie
HIM ELECTRICALS
Sai Bholey Consultancy
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .