| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.5 LAccepted-AOC HOUSE NO 89 BEHIND DD LEH LADAKH 194101 | LEH LADAKH | LADAKH | 194101 | ₹32.5 L Quoted ₹33.2 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹34.2 L+₹97,266.80 (2.93%)Rejected-Finance | ₹34.2 L+₹97,266.80 (2.93%) | L2 | Rejected-Finance Being L2 |
| 3 | L3₹39.8 L+₹6.6 L (19.8%)Rejected-Finance NEAR ALCHI MONESTRY 00 01 SKANTSO ALCHI SASPOL ALCHI LEH LADAKH PIN 194106 | LEH LADAKH | LADAKH | 194106 | ₹39.8 L+₹6.6 L (19.8%) | L3 | Rejected-Finance Being L3 |
| 4 | L4₹41.7 L+₹8.4 L (25.4%)Rejected-Finance | ₹41.7 L+₹8.4 L (25.4%) | L4 | Rejected-Finance Being L4 |
| 5 | L5₹43.1 L+₹9.9 L (29.9%)Rejected-Finance HOUSE NO 251 E BLOCK ADARSH NAGAR BALLABHGARH FARIDABAD PIN 121004 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121004 | ₹43.1 L+₹9.9 L (29.9%) | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | national engineering L5 | M/S MOHD KARIM L4 | M/S HIGHLAND ENGINEERING L1 | M/S Stanzin Tharchin L8 | M/S SHAH AND SHAH CONSTRUCTION L7 | M/S DAWA ENTERPRISES L3 | M/S stanzin tundup L2 | Takshos Enterprises L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and directed | 128.75 | Cubic Metre | 50 ₹6,437.5 | 1,370 ₹1,76,387.5 | 8.2 ₹1,055.75 Lowest | 2,000 ₹2,57,500 | 60 ₹7,725 | 1,400 ₹1,80,250 | 9 ₹1,158.75 | 48 ₹6,180 |
| 2.00 | Demolition of brickwork or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and directed . | 100 | Cubic Metre | 50 ₹5,000 | 565 ₹56,500 | 8.2 ₹820 Lowest | 500 ₹50,000 | 55 ₹5,500 | 550 ₹55,000 | 9 ₹900 | 49 ₹4,900 |
| 3.00 | Material and labour for precast cement concrete block masonry with solid blocks exc 10cm in width type C1, 1:3:6 (using 20mm graded aggregate) set in CM 1:6 complete all as specified and directed. | 50 | Cubic Metre | 8,500 ₹4,25,000 | 7,800 ₹3,90,000 | 6,000 ₹3,00,000 Lowest | 12,000 ₹6,00,000 | 8,400 ₹4,20,000 | 8,000 ₹4,00,000 | 6,256 ₹3,12,800 | 8,400 ₹4,20,000 |
| 4.00 | Material and labour for walling of random rubble, coursed,, well bonded, bedded and solidly hearted built in cement mortar 1:6 complete all as specified and directed . | 40 | Cubic Metre | 7,200 ₹2,88,000 | 5,100 ₹2,04,000 | 4,400 ₹1,76,000 Lowest | 6,200 ₹2,48,000 | 7,800 ₹3,12,000 | 5,200 ₹2,08,000 | 4,523 ₹1,80,920 | 7,300 ₹2,92,000 |
| 5.00 | All as per serial item no 4.00 above but except stone -ditto- | 10 | Cubic Metre | 5,500 ₹55,000 | 3,290 ₹32,900 | 2,300 ₹23,000 Lowest | 2,900 ₹29,000 | 5,500 ₹55,000 | 3,200 ₹32,000 | 2,407 ₹24,070 | 5,000 ₹50,000 |
| 6.00 | Material and labour for precast cement concrete block (1:3:6) type C-1 (using 20mm graded crushed stone aggregate) as in bond stones set in cement mortar 1:6 complete all as specified and directed . | 2 | Cubic Metre | 8,500 ₹17,000 | 1,090 ₹2,180 | 6,500 ₹13,000 | 1,200 ₹2,400 | 8,500 ₹17,000 | 1,000 ₹2,000 Lowest | 6,642 ₹13,284 | 8,400 ₹16,800 |
| 7.00 | Material and labour for PCC 1:2:4, type B-1 using 20mm graded stone aggregates as in coping, fixing angle iron etc (including necessary form work) complete all as specified and directed | 5 | Cubic Metre | 7,200 ₹36,000 | 8,990 ₹44,950 | 6,600 ₹33,000 Lowest | 8,500 ₹42,500 | 7,800 ₹39,000 | 8,900 ₹44,500 | 6,737 ₹33,685 | 7,200 ₹36,000 |
| 8.00 | Supply and fixing for PVC 110mm dia pipe in any length with rubber rings joints laid as in weep holes complete all as specified and directed | 1 | Running Metre | 350 ₹350 | 356 ₹356 | 238 ₹238 Lowest | 460 ₹460 | 550 ₹550 | 350 ₹350 | 240 ₹240 | 470 ₹470 |
| 9.00 | Material and labour for raised pointing to stone masonry wall in cement mortar 1:3 complete all as specified and directed. | 10 | 10 Square Metre | 350 ₹3,500 | 1,245 ₹12,450 | 444 ₹4,440 | 1,400 ₹14,000 | 450 ₹4,500 | 1,200 ₹12,000 | 336 ₹3,360 Lowest | 380 ₹3,800 |
| 10.00 | Taking down cement plaster including tiles of any description on brick or stone or cement concrete walls including raking out joints, hacking for key, scrubbing down with water etc, complete all as specified and directed . | 1,000 | Square Metre | 30 ₹30,000 | 78 ₹78,000 | 2 ₹2,000 Lowest | 95 ₹95,000 | 70 ₹70,000 | 75 ₹75,000 | 5 ₹5,000 | 43 ₹43,000 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
27 Jun 2026, 6:00 pmClosed
GE I R AND D Chandigarh
Garrison Engineer I R and D, DIHAR Base Lab, Ground Floor, Near 3 (BRD) AF Stn, Industrial Area, Ph-II, Ramdarbar, Chandigarh
REPAIR/ MAINT OF FENCING, PATH, HARD STANDING, BOUNDARY WALL, RETAINING WALL AND OTHER MISC WORKS AT DIHAR LEH AND RANBIRPURA DET
2026_MES_769983_1
GE I R AND D/CHD-15/2026-27
Open Tender
Civil Works
Item Rate
180 days
Leh
As per tender documents
8 documents required · 8 mandatory
₹500
GE I R AND D Chandigarh
₹90,000
Yes
4 Aug 2026
5 Jun 2026
29 Jun 2026
5 Jun 2026
27 Jun 2026
20 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of cement concrete of any description and in any position not otherwise specifically provided for complete all as specified and directed | 128.75 | Cubic Metre | - | - |
| 2 | Demolition of brickwork or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and directed . | 100 | Cubic Metre | - | - |
| 3 | Material and labour for precast cement concrete block masonry with solid blocks exc 10cm in width type C1, 1:3:6 (using 20mm graded aggregate) set in CM 1:6 complete all as specified and directed. | 50 | Cubic Metre | - | - |
| 4 | Material and labour for walling of random rubble, coursed,, well bonded, bedded and solidly hearted built in cement mortar 1:6 complete all as specified and directed . | 40 | Cubic Metre | - | - |
| 5 | All as per serial item no 4.00 above but except stone -ditto- | 10 | Cubic Metre | - | - |
| 6 | Material and labour for precast cement concrete block (1:3:6) type C-1 (using 20mm graded crushed stone aggregate) as in bond stones set in cement mortar 1:6 complete all as specified and directed . | 2 | Cubic Metre | - | - |
| 7 | Material and labour for PCC 1:2:4, type B-1 using 20mm graded stone aggregates as in coping, fixing angle iron etc (including necessary form work) complete all as specified and directed | 5 | Cubic Metre | - | - |
| 8 | Supply and fixing for PVC 110mm dia pipe in any length with rubber rings joints laid as in weep holes complete all as specified and directed | 1 | Running Metre | - | - |
| 9 | Material and labour for raised pointing to stone masonry wall in cement mortar 1:3 complete all as specified and directed. | 10 | 10 Square Metre | - | - |
| 10 | Taking down cement plaster including tiles of any description on brick or stone or cement concrete walls including raking out joints, hacking for key, scrubbing down with water etc, complete all as specified and directed . | 1,000 | Square Metre | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Tenderdocuments15.pdf
Tender Documents • 1.08 MB
BOQ_862259.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .