| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC | ₹16.8 L | L1 | Accepted-AOC Due to L1 |
| 2 | L2₹19.1 L+₹2.4 L (14.0%)Rejected-Finance ASWARIPATNA PO BARAKULA DIST KHURDA | KHORDHA | ODISHA | 751001 | ₹19.1 L+₹2.4 L (14.0%) | L2 | Rejected-Finance Reject |
Tender Value
₹16.8 L
EMD Value
₹16,784
Closing Date
12 Mar 2026, 5:00 pmClosed
EXECUTIVE OFFICER, BANPUR NAC
BANPUR NAC OFFICE, BANPUR, KHORDHA
Construction of Market Complex infront of Harijan Sahi w.no-7 in Banpur NAC.
2026_ORULB_126599_5
E.O-N.A.C-BNR- 03/2025-26
Open Tender
Civil Works - Others
Percentage
90 days
OFFICE OF BANPUR NAC
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,784
Yes
3 Sept 2026
25 Feb 2026
13 Mar 2026
25 Feb 2026
12 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of founation in hard soil or gravelly soil including dressing and levelling the bed not exceeding 1.5m initial depth and depositing the soil within initial lead of 50m and as per specification approved by the Department. (F&P) Shop room size 3.05 mtr x 2.75 mtr 7Nos | 19.97 | cum | 276.89 | ₹5,529.49 |
| 2 | Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead | 3.94 | cum | 1,611.7 | ₹6,350.1 |
| 3 | Supplying and filling the foundation and plinth with clean coarse river sand of approved quality from approved quarry, laying in layers not exceeding 200mm thick, watering and ramming including cost, conveyance royalty and taxes of all materials, cost of as per the direction of Engineer-In-Charge. | 53.95 | cum | 519.79 | ₹28,042.67 |
| 4 | Supplying and providing of Cement concrete of proportion (1:3:6) by using 40mm sized CBHG metal of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect as per the direction of Engineer-In-Charge. | 41.76 | cum | 6,279.13 | ₹2,62,216.47 |
| 5 | R.C.C work of prop M20 having minimum compressive strength (in work test) 200kg./cm2 in 15cm cubes at 28days after mixing and test conducted in accordance with I.S. 456 and I.S. 516using 12mm to 20mm size (1/2” to ¾”) crusher broken hard black granite chips of 20mm size (not to exceed 25%) of approved quality & from approved quarry including hosting, lowering, laying and compacting concrete with vibrator, watering and curing for 28days, and finishing to exposed surface smooth providing, grooves or beads wherever necessary as per direction of the Engineer in charge including cost, conveyance, royalties & taxes of all materials and cost of all labour, T&P etc. as required for the work completion in all respects as per direction of Engineer in charge but excluding cost of M.S rod / Tor steel and binding wires and labour charges for bending, binding wires and labour charges for bending, binding and tying the grills. | 28.59 | cum | 6,572.05 | ₹1,87,894.91 |
| 6.1 | Supplying all materials, labour, T&P for smooth centering and shuttering to RCC works etc all complete as per specification and direction of the E.I.C. | 34.2 | sqm | 265.35 | ₹9,074.97 |
| 6.2 | Column & Beam | 74.66 | sqm | 1,227.67 | ₹91,657.84 |
| 6.3 | RCC Lintel | 17.98 | sqm | 606.92 | ₹10,912.42 |
| 6.4 | RCC Chhaja and Roof Slab | 79.85 | sqm | 777.78 | ₹62,105.73 |
| 7 | Straightening, cutting, bending and binding, welding and jointing (if necessary ) coiled/ bent up MS Rods /Tor Steel/deformed rods etc. including hoisting, placing in position, tying the grills binding with 18 to 20 gauge binding wire required for R.C.C work including cost, conveyance, taxes of all materials, cost of all labour, T&P etc. as required for the work complete (weight of binding wire will not be considered) as directed by Engineer-in-charge. (Payment will be made on actual weight of M.S rods or Tor steel linear measurements of rod for finished item of works. 5% wastage and lap length are included in the finished rate). | 24.43 | Qntl | 8,304.11 | ₹2,02,869.41 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_582833.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
BOQ_582833.xls
BOQ • 0.34 MB
13DTCN348.PDF
Tender Documents • 1.46 MB
348_CORRIGENDUM.pdf
PDF • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .