Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹24,000
Closing Date
23 Apr 2022, 11:00 amClosed
Executive Engineer JSD PHE Mech Rural Division Sgr
Executive Engineer JSD PHE Mech Rural Division Sgr
Repairs to 63 KVA HT/LT Distribution Transformer at WSS Chuntwaliwar Stage 1st
2022_PHE_166610_1
PHE/MRD/TS/ 03 of 04/2022
Open Tender
Miscellaneous Works
Item Rate
7 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹100
Executive Engineer JSD PHE Mech Rural Division Sgr
27 Apr 2022
13 Apr 2022
23 Apr 2022
13 Apr 2022
23 Apr 2022
13 Apr 2022
Amount
Loading of damaged 63KVA HT/LT Al. wound transformer into private load carrier to be arranged by the firm using channels and skilled/ semi-skilled labours then shifting it to workshop for conducting repairs. Dis-assembling of transformer after opening of top lid/cover plate, removing of the cell from the MS tank, opening of inner core channels and dismantling of the damaged phase legs using special tools and tackles and skilled/semi-skilled labours. Then shifting back of the repaired transformer to the site of work. The job includes installation of HT Transformer on the two-pole structure bed and testing of HT Transformer on load using special tools and tackles and skilled/semi-skilled labours. (01 job)
Complete rewinding of damaged 01 HT legs (each leg comprising of 4 No. coils) using Al- coils of proper gauge and specification. The job includes tapping of rewinded phase legs using cotton tape/varnishing etc, complete in all respects.(04 coils)
Complete rewinding of damaged LT leg using Al-Strip of proper gauge and specification. The job includes tapping of rewinded phase legs using cotton tape/varnishing etc complete in all respects.(01 leg)
Dehydration of moisture from the core by way of heat treatment of same in the electric oven at least for 24 Hours. (01 job)
Reassembling of the cell, closing of the inner case channels and lowering of the cell assembly in the MS tank, fixing of the top core plate using cork gasket, nuts and bolts complete, then testing on full load at site of work. (01 job)
Fabrication, P/F of top lid gasket to the transformer including replacement of worn-out nuts-bolts. (01 job)
Asif Engineering Works
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .