| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.3 LAccepted-AOC | ₹39.3 L Quoted ₹47.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹47.4 LRejected-Finance | ₹47.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹48.1 LRejected-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | ₹48.1 L | L3 | Rejected-Finance L3 |
| 4 | L4₹61.6 LRejected-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹61.6 L | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | K DHINAKARAN L4 | MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED L3 | HRF INFRA L1 | MK DHANALAKSHMI INFRASTRUCTURE PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Fabrication galvanising and supply of GI tower parts in accordance with boards design as per drawings furnished and as per IS:2062 Grade A and as detailed in this specification including cost of all materials, labour, leads, and lifts etc., complete as directed by the department engineer at site. | 1.47 | MT | 1,20,000 ₹1.8 L | 1,20,000 ₹1.8 L | 96,000 ₹1.4 L | 1,20,000 ₹1.8 L |
| 2.00 | Labour Charges for conducting check survey, pegging, marking of pits for tower foundation as per the apporved profile including chaining and carring theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by Department Engineer at site. | 2 | Loc. | 3,000 ₹6,000 | 3,000 ₹6,000 | 2,500 ₹5,000 | 3,000 ₹6,000 |
| 3.00 | Labour charges for Clearing of juliflora jungle with uprooting for facilitating survey including cost of all labour, transport, T&P, lead lift etc., complete as directed by the department engineer at site. | 6,390 | M2 | 5 ₹31,950 | 5 ₹31,950 | 10 ₹63,900 | 5 ₹31,950 |
| 4.00 | Leveling the site and removing boulds, scrap jungle and earth by engaging JCB including cost of all men and materials as directed by Department Engineer at site. | 40 | Hrs. | 2,500 ₹1 L | 2,500 ₹1 L | 400 ₹16,000 | 2,500 ₹1 L |
| 5.00 | Providing approach road by filling with good quilty filling earth / gravel over canal & river bed slushy soil including cost of materials, transport charges all labour,lead, lift,etc,complete | 1,800 | M3 | 1,000 ₹18 L | 732 ₹13.2 L | 700 ₹12.6 L | 700 ₹12.6 L |
| 6.00 | Providing Working platform by filling with good quilty filling earth / gravel over canal & river bed slushy soil including cost of materials, transport charges all labour,lead, lift,etc,complete | 800 | M3 | 1,000 ₹8 L | 1,000 ₹8 L | 750 ₹6 L | 1,000 ₹8 L |
| 7.00 | Labour charges for Sinking well in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete under water including bailing or pumping charges if necessary, labour, transport, lead, lift etc., complete as directed by the department engineer at site. - 0 to 2 mtrs | 81.64 | M3 | 300 ₹24,492 | 300 ₹24,492 | 400 ₹32,656 | 300 ₹24,492 |
| 8.00 | Labour charges for Sinking well in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete under water including bailing or pumping charges if necessary labour, transport, lead, lift etc., complete as directed by the department engineer at site - 2 to 4 mtrs | 67.76 | M3 | 300 ₹20,328 | 300 ₹20,328 | 500 ₹33,880 | 300 ₹20,328 |
| 9.00 | Manufacuring and supply of precast of RCC Precast well rings of inner dia 2.40m, thickness 75mm and 0.30m depth including cost of 8mm RTS rods 3 nos longtudinally and 20cm C/C vertically including all materials, dewatering, lead lift etc complete as directed by the department engineer at site. | 96 | Nos. | 300 ₹28,800 | 300 ₹28,800 | 4,800 ₹4.6 L | 300 ₹28,800 |
| 10.00 | Labour charges for bailing out of water by using pumpset including the cost of heir charges for diesel pumpset 3/5HP, labour fuel charges, transport, T & P, lead, lift ect., complete as directed by the department engineer at site. | 30 | Hrs. | 1,000 ₹30,000 | 1,000 ₹30,000 | 280 ₹8,400 | 1,000 ₹30,000 |
Tender Value
₹46.5 L
EMD Value
₹46,500
Closing Date
13 Jan 2026, 2:00 pmClosed
SE/GCC-I/CNI
230KV GIS SS Complex, A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2026_EB_640355_1
LT-033/25-26 of SE/GCC-I/CNI
Limited
Civil Works
60 days
Sriperumbudur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹46,500
Yes
27 Feb 2026
7 Jan 2026
14 Jan 2026
7 Jan 2026
13 Jan 2026
7 Jan 2026
Fabrication galvanising and supply of GI tower parts in accordance with boards design as per drawings furnished and as per IS:2062 Grade A and as detailed in this specification including cost of all materials, labour, leads, and lifts etc., complete as directed by the department engineer at site.
Labour Charges for conducting check survey, pegging, marking of pits for tower foundation as per the apporved profile including chaining and carring theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by Department Engineer at site.
Labour charges for Clearing of juliflora jungle with uprooting for facilitating survey including cost of all labour, transport, T&P, lead lift etc., complete as directed by the department engineer at site.
Leveling the site and removing boulds, scrap jungle and earth by engaging JCB including cost of all men and materials as directed by Department Engineer at site.
Providing approach road by filling with good quilty filling earth / gravel over canal & river bed slushy soil including cost of materials, transport charges all labour,lead, lift,etc,complete
Providing Working platform by filling with good quilty filling earth / gravel over canal & river bed slushy soil including cost of materials, transport charges all labour,lead, lift,etc,complete
Labour charges for Sinking well in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete under water including bailing or pumping charges if necessary, labour, transport, lead, lift etc., complete as directed by the department engineer at site. - 0 to 2 mtrs
Labour charges for Sinking well in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete under water including bailing or pumping charges if necessary labour, transport, lead, lift etc., complete as directed by the department engineer at site - 2 to 4 mtrs
Manufacuring and supply of precast of RCC Precast well rings of inner dia 2.40m, thickness 75mm and 0.30m depth including cost of 8mm RTS rods 3 nos longtudinally and 20cm C/C vertically including all materials, dewatering, lead lift etc complete as directed by the department engineer at site.
Labour charges for bailing out of water by using pumpset including the cost of heir charges for diesel pumpset 3/5HP, labour fuel charges, transport, T & P, lead, lift ect., complete as directed by the department engineer at site.
Labour charges for installation of stub and cleats and template in position & allignment and shifting template from location to location and reassambling the same including cost of all labour, transport, lead, lift, etc., complete as directed by the department engineer at site. (The template will be make own arrangement by the contractor).
Providing and laying P:C:C 1:2:4 using 12-20mm HBG metal without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Providing and laying P.C.C 1:2:4 using 20mm HBG stone with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Supplying and providing Pipe type earthing to towers including all materials GI pipe 3m length required lenght of earth wire and welded with washer at end connecting with tower leg and all lead, lift etc., complete as directed by the department engineer at site.
Labour charge for transporting and erection of tower parts including sorting out of tower parts at stores and site, rectification in tower parts if any, cost of T&P, labour, transport from stores, lead, lift, etc., complete as directed by the department engineer at site.
GST for bidders outside TamilNadu (IGST)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_766782.xls
BOQ • 0.25 MB
LT033.pdf
Tender Documents • 0.68 MB
Download all tender documents and submit your bid