Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.1 CrAccepted-AOC MANE CHAMBERS OPP S T DEPOT AUSA ROAD SHIVAJI CHOWK LATUR 413512 | LATUR | LATUR | MAHARASHTRA | 413512 | ₹39.1 Cr Quoted ₹37.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹38.4 Cr+₹73.6 L (1.95%)Rejected-AOC LAXMI NAGAR LATUR TQ DIST LATUR | LATUR | LATUR | MAHARASHTRA | ₹38.4 Cr+₹73.6 L (1.95%) | L2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical B 301 KAPIL UPAVAN BIBWEWADI PUNE 411037 | PUNE | PUNE | MAHARASHTRA | 411037 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S B. R. ANDE CONSTRUCTION COMPANY L2 | SHRI SATYASAI BABA INFRA VENTURES PRIVATE LIMITED L1 |
|---|---|---|---|---|---|
| 1.00PART – A (Work Portion) | |||||
| 2.00ITEM No. 1 :- Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 millimetre, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of over 1000 metres including removal and disposal of top organic soil not exceeding 150 millimetre in thickness. | |||||
| 3.00 | A) Solid Approaches and service road | 16,100 | One Square Metre | 12.84 ₹2,06,724 | 12.6 ₹2,02,860 Lowest |
| 4.00ITEM No. 2 :-Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately etcetera complete. | |||||
| 5.00 | A) Solid Approaches and service road | 402.5 | One Cubic Metre | 460.1 ₹1,85,190.25 | 451.5 ₹1,81,728.75 Lowest |
| 6.00ITEM No. 3 :- Conveying materials obtained from road cutting including all lifts, laying in layers of 20 centimetre to 30 centimetre breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97 % of standard proctor density for a lead of 300 metre to 500 metre inclusive, from the site of excavation to the site of deposition as directed. | |||||
| 7.00 | A) Solid Approaches and service road | 19,429.51 | One Cubic Metre | 420.51 ₹81,70,303.25 | 412.65 ₹80,17,587.3 Lowest |
| 8.00ITEM No. 4 :- Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting as necessary and disposing off excavated stuff as directed etcetera complete. (By Mechanical Means) (Depth upto 1.50 Metre depth) | |||||
| 9.00 | A) Solid Approaches and service road | 21,621.6 | One Cubic Metre | 96.3 ₹20,82,160.08 | 94.5 ₹20,43,241.2 Lowest |
| 10.00 | B) Bridge ROB non obligatory span | 374.25 | One Cubic Metre | 96.3 ₹36,040.28 | 94.5 ₹35,366.62 Lowest |
Tender Value
₹37.5 Cr
EMD Value
₹18.8 L
Closing Date
11 Mar 2025, 11:00 amClosed
EE PWD LATUR
EE PWD LATUR
Construction of Railway over bridge on NH-211 to Pimpalgaon Para Bhogji Kallam Shiradhon Tandulja Bhuisamudra Latur Babhalgaon Lodga Nitur road, SH-236, Km.102/380 (Near Harangul), Tq.District Latur.
2025_PWR_1153676_1
Notice No. B 2 LTR 34/1 For 2024 25 E Tender
Open Tender
Civil Works - Bridges
Item Rate
540 days
LATUR
Please refer Tender documents
2 documents required · 2 mandatory
₹3,540
₹18.8 L
Chief Engineer, P W Region, Nanded
23 Apr 2026
24 Feb 2025
12 Mar 2025
24 Feb 2025
11 Mar 2025
24 Feb 2025
3 Mar 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART – A (Work Portion) | - | - | - | - |
| 2 | ITEM No. 1 :- Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 millimetre, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of over 1000 metres including removal and disposal of top organic soil not exceeding 150 millimetre in thickness. | - | - | - | - |
| 3 | A) Solid Approaches and service road | 16,100 | One Square Metre | 12 | ₹1,93,200 |
| 4 | ITEM No. 2 :-Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately etcetera complete. | - | - | - | - |
| 5 | A) Solid Approaches and service road | 402.5 | One Cubic Metre | 430 | ₹1,73,075 |
| 6 | ITEM No. 3 :- Conveying materials obtained from road cutting including all lifts, laying in layers of 20 centimetre to 30 centimetre breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97 % of standard proctor density for a lead of 300 metre to 500 metre inclusive, from the site of excavation to the site of deposition as directed. | - | - | - | - |
| 7 | A) Solid Approaches and service road | 19,429.51 | One Cubic Metre | 393 | ₹76,35,797.43 |
| 8 | ITEM No. 4 :- Excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting as necessary and disposing off excavated stuff as directed etcetera complete. (By Mechanical Means) (Depth upto 1.50 Metre depth) | - | - | - | - |
| 9 | A) Solid Approaches and service road | 21,621.6 | One Cubic Metre | 90 | ₹19,45,944 |
| 10 | B) Bridge ROB non obligatory span | 374.25 | One Cubic Metre | 90 | ₹33,682.5 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
TENDERDOCUMENT3401.pdf
Tender Documents • 2.14 MB
BOQ_2006985.xls
BOQ • 0.32 MB
BOQ.xls
BOQ • 0.32 MB
Tenderdocument.pdf
Tender Documents • 2.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .