Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.9 LAccepted-AOC NANGAVALLI TOWN PANCHAYAT SALEM DIST | SALEM | TAMIL NADU | 621011 | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹68.1 L+₹26,297.46 (0.39%)Rejected-AOC | L2 | Rejected-AOC REJECTED | |
| 3 | L3₹68.2 L+₹32,109.95 (0.47%)Rejected-AOC | L3 | Rejected-AOC REJECTED | |
| 4 | L4₹68.4 L+₹54,089.18 (0.80%)Rejected-AOC | L4 | Rejected-AOC REJECTED |
Tender Value
Refer Docs
EMD Value
₹44,100
Closing Date
5 Dec 2024, 12:30 pmClosed
Executive Officer
A/m Suyambunatheeswarar Temple, Ocheri
Thirukoil Thiruppani and Compound Wall - A/m Suyambunatheeswarar Temple, Ocheri
2024_HRCE_499404_1
HRCE_3872_01
Open Tender
Civil Works
Lump-sum
300 days
A/m Suyambunatheeswarar Temple, Ocheri
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹44,100
6 Feb 2025
9 Nov 2024
5 Dec 2024
9 Nov 2024
5 Dec 2024
9 Nov 2024
Amount
Dismantling
Dismantling clearing away of pressed tiles & weathering course and depositing the debries in the place as shown by the departmental officers.
Dismantling, clearing away for Floor finish and dadooing walls in cement mortar with mosaic tiles / glazed tiles / cuddapah slabs and clearing the debries as directed by the departmental officers.
Dismantling and clearing away of plain cement concrete and clearing the debries and depositing the same in the place as shown by the department officers.
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead and initial lift, and clearing and levelling the site, etc, complete complying with standard specification.
Supplying and filling in foundation, basement, etc with filling Msand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. Complete complying with standard specification.
Plain cement concrete 1:5:10(one of cement five Msand and ten of aggregate) using 40mm gauge hard broken granite broken stone jelly for foundation and basement including dewatering wherever necessary and laid in layers of not more than 15cm thick wall rammed, consolidated and curing etc., Complete complying with standard specification.
Foundation and Basement
Providing and laying in position, standardised concrete mix M-20 grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m³ and maximum water cement ratio of 0.55, including admixture (plasticiser/super plasticiser) in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m) 5156 kg of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming extra, etc, complete complying with standard specification (No separate payment will be made by the Department for the excess usage of materials).
Foundation and Basement
Supplying, fabricating and placing in position mild steel / ribbed to steel grills for all RCC works as per design given including cost of steel and G.I. Binding wire in all floors etc. Complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29M height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheets of size 90 x 60cm and 10BG stiffened with welded mild steel angle of size 25mm x 25mm x 3mm for boarding laid over silver oak koists of size 10cm x 6.50 cm spaced at above 90 cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at not more than 75cm centre to centre etc. complete complying with the standard specification. (Payment for centering shall be given after the concrete is laid)
For foundation, Plinth Beam, upto basement
Special plastering for R.C.C. slab beam and sunshades with Cement mortar 1:3, 10mm thick in all floors including cost and conveyence of all materials and labour charges, curing, hacking, cement mortar nosing wherever necessary finishing etc. complete complying with standard specifications.
Brick work in lime motar using best quality of Third Class Country Bricks Kiln Burnt of size 83/4" x 41/4" x 23/4" in Lime mortar 1:2 including curing, etc., complete complying with standard specifiction.
Ground floor
Plastering with Lime mortar 1:1.5, 12mm thick including cost and coveyance of all materials and all labour charges, curing, etc. complete in all floors complying with standard specifications
Painting two coats of newly plastered wall surface with ready mixed exterior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supplying and fixing teak wood temple type door using well seasoned best quality teak wood including wrought and put up all materials, labour charges and fixing in position including all furniture fittings making grows in the frame and door shutter etc complete with standard specifications.
Below 7'0"
Above 7'0"
Painting new wood work with two finishing coats with synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat including brush, labour charges etc, complete complying with standard specification.
Supplying and fixing mild steel grill gate including cost conveyance of all materials and fixing in position, welding, grinding including priming coat etc complete with standard specifications.
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrade, grill gate etc, with two coats of best approved first quality and colour of synthetic enamel paint over the existing zinc chromite yellow primer coat in all floors etc, complete complying with standard specification. (The make quality and colour of paint should be got approved by the Executive Engineer before use on works).
Weathering course concrete with broken jelly 20mm size and pure unslaked lime over RCC roof slab, the proportion being 32:12.5 (by volume) for required depath of 80mm for giving required slope and thickness of roof on required, well beatten with wooden beater using lime Jaggery galnut water etc, complete complying with standard specifications.
Finishing the top of roof with one course of machine pressed tiles 20cm x 20cm x 20mm of approved quality laid in lime mortar 1:2 12mm thick mixed with water proofing compound 2% by weight of lime used and pointing the same mortar with red oxide etc complete complying with standard specification.
Providing new Sudhai vigrahams in the Vimanams and Rajagopurams with copper rod reinforcement of suitable dia with binding wires wherever necessary, shaping the core with broken bricks set in Lme mortar 1:1.5 with 20% cement finishing the same with Lime mortar 1:1.5 with 20% cement bringing to the correct shape (Laskshana) in conformfit with silpa sastra inclusive of special ornaments, wiapons, peedam etc,. complete and providing Combination mortar Nayam theervai wherver necessary. Inclusive of cost and conveyance of all materials, such as cement broken bricks, and copper rods binding wire all labour for working in heights, curing lifting of materials etc., complete including cement painting 2 coats over a primary coat (one vigraham is accountable with one head, 4 hands with weapons, ornamental costumes etc., as per pathima lashans, Vigraham height is measurable from the crown top to bottom of foot only if peetam is pt/provided the rate with peetam may be adopted as detailed hereunder. complete all as specified and directed by the Executive Engineer.
Sudhai 2'6" upto 3'6" size
Scraping the decayed lime plaster from the surface of Vimanams and Gopurams, carefully including isolated bricks or brickwork without damaging the vari vargams, racking out the joints, cleaning the surface with water. Including all working in heights, hire charges for special tools, brushes complete superficial are including all folds. 100 sft.
Providing Vargopoochu over the corewalls of Vimanams/Gopurams, with lime mortar 1:1.5 complete including shapping the mukhapathram, muhanasi, koodu all ornamental works to proper shape by embdding broken bricks of shaped/chiselled bricks, rough-plastering with lime mortar 1:1.5 and finishing withfinal ornamental plastering and nayam theervani including cost and conveyance of all materials, labour, lifting of all materials, to all working heights, curing etc, complete including extra for Scaffolding and including clearing from the Vimanams/gopurams 100sft superficial for area.
Vimanam of ht. upto 15'
Vimanam of ht upto 25'
Scaffolding charges for Vimanams and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing ladder arrangements, country wood plank for working, inspection etc, complete hire charges only for erection, maintainance and removing the same on completion of the work.
Cleaning the stone surfaces by water wash such as wall stones, pillar, pothiyal, uthiram, flooring and pavukkal from white wash/colour/ wash painting including cost of necessary soap/ brushes labour charges for cleaning etc.,all complete as directed by the department others.
Pointing the cut stone masonry work with lime mortar 1:1.5 excluding cost and conveyance of cut stone but including all labour charges scaffolding curring, pointing etc complete with standard specifications. The lime used shoud be sourced is highly iron fortified and suitable for structural and masonry works.
Labour charges for Dressing and fixing of required faces consisting of Aswapadam, Sthamaba, Sthambam, Kalasam, Thadi, Kudam, Palagai, Veerakandam, Bodhiyal, Uthiram, Kambu, Eludham, Kabothagam, Viyalam, Koodu, Ull Vari, Pavukkal, Thun, Flooring, Nilaikal, Bodhiyal Thani, Uthiram, etc neatly finishing, fixing in position and pointing with lime mortar 1:1.5 as directed by the departmental officers.
Flooring with cut stone slab of size 600mm x 600mm and other sizes for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and labour charges for paving and pointing with Lime Mortar 1:1.5 etc., complete as directed by the departmental Officers. single line dressing
Sub Total
Abinav Constructions (BID ID -1201241)
M/S Sri Pachaiamman Temple Construction (BID ID -1197449)
M/S G K WOOD TRADERS (BID ID -1197474)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_593606.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .