Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.5 LAccepted-AOC | L1 | Accepted-AOC QUOTED AMOUNT IS REASONABLE | |
| 2 | L2₹50.2 L+₹35,251.92 (0.71%)Rejected-Finance WZ 250 B 2 GALI NO 08 SADH NAGAR I PALAM COLONY NEW DELHI 110045 | NEW DELHI | SOUTH WEST DELHI | DELHI | 110045 | L2 | Rejected-Finance OTHER THAN LOWEST | |
| 3 | L3₹50.8 L+₹94,323.92 (1.89%)Rejected-Finance PLOT NO 79 SIS PARK DICHAON ENCLAVE PP2914 NAJAFGARH SOUTH WEST DELHI NEW DELHI 110043 | WEST DELHI | DELHI | 110043 | L3 | Rejected-Finance OTHER THAN LOWEST | |
| 4 | L4₹51.9 L+₹2.0 L (3.93%)Rejected-Finance WZ 143 A 7A S 4 43 GALI NO 2 OLD MAHAVIR NAGAR NEW DELHI 110018 | WEST DELHI | DELHI | 110018 | L4 | Rejected-Finance OTHER THAN LOWEST | |
| 5 | L5₹54.4 L+₹4.5 L (8.95%)Rejected-Finance 1ST FLOOR H NO 165 GALI NO 16 S B S COLONY KARAWAL NAGAR DELHI EAST DELHI DELHI 110094 | NORTH EAST DELHI | DELHI | 110094 | L5 | Rejected-Finance OTHER THAN LOWEST |
| Sl No | Description | Qty | Unit | R. S. Associates L5 | Singh Associates L6 | imran construction company L2 | M/S MSD & Associate L8 | M/S Parmod Johar L3 | M/S Sunil Steel Works L4 | J S CONSTRUCTION CO L7 | M/s SAAR ENGINEERS L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolation Bricks Tiles (laid flat or on Edge) or brick tiles in floor ,roof ,channels,kerbs,Aprons,etc.(each layer)all as specified and directed | 3,750 | Sqm | 10 ₹37,500 Lowest | 17 ₹63,750 | 10 ₹37,500 Lowest | 14 ₹52,500 | 10 ₹37,500 Lowest | 20 ₹75,000 | 30 ₹1,12,500 | 15 ₹56,250 |
| 2.00 | Demolation mud in Roofs,any thicknes ,including plastering and lapping (weather full thickness Removed or only a part there of ) all as specified and directed (as per site requirment) | 862.5 | Cum | 350 ₹3,01,875 | 277 ₹2,38,912.5 | 400 ₹3,45,000 | 230 ₹1,98,375 | 200 ₹1,72,500 Lowest | 300 ₹2,58,750 | 200 ₹1,72,500 Lowest | 220 ₹1,89,750 |
| 3.00 | Removed Demolished materials exc 1.5 km and Deposting where as Directed at Above the Starting point all as specified and directed | 862.5 | Cum | 199 ₹1,71,637.5 | 287 ₹2,47,537.5 | 30 ₹25,875 Lowest | 290 ₹2,50,125 | 100 ₹86,250 | 100 ₹86,250 | 250 ₹2,15,625 | 170 ₹1,46,625 |
| 4.00 | M & L for removal of plants ( area with in n exc 0.50sqm) growth by injection with chemical glyphosphate solution (4 % concentration) @ 20 ml or till refuse by cutting or injection in stem of plants or roots at 30 mm. The area shall then be sprayed with solution 25 ml glyphosphate (4% conc) diluted with 1 ltr of water, including taking out roots from roof / brick work and making good the disturbed surface with plaster and PCC 1 :2:4 type B0 and disposing the rubbish from site (MOD land) of upto G+ 5 storey height complete and as specified | 50 | Each Block | 500 ₹25,000 | 777 ₹38,850 | 50 ₹2,500 Lowest | 480 ₹24,000 | 500 ₹25,000 | 400 ₹20,000 | 1,500 ₹75,000 | 500 ₹25,000 |
| 5.00 | Material and labour for applying a coat of Nano technology based water proofing compound (1 part powder : 1 part liquid), of desired consistency with nylon brush @ 5 sqm/kg coverage over vertical/horizantal surface of RCC roof and parapet complete all as specified. | 40 | kg | 500 ₹20,000 Lowest | 777 ₹31,080 | 500 ₹20,000 Lowest | 500 ₹20,000 Lowest | 500 ₹20,000 Lowest | 1,800 ₹72,000 | 600 ₹24,000 | 775 ₹31,000 |
| 6.00 | Material and labour for appplying Nanotechnology based Anti-corrosive with high strength carbon Fiber based shorter chain Epoxy coating (Bond Coat) of finest quality, high strength, high penetration, durable, UV resistant, high scratch/ impact resistant, bacteria resistant and thermally stable, Semi transparent, mixed in proportion (4 Base : 1 Hardner) in reqd consistency @ 8 sqm/kg over the entire prepared surfaces of roof/parapet/sunken floor complete all as specified.
Note :
1. Rate shall include for making surface clean,dustfree, dry, and free of wax, grease, oil, loose or peeling particle, and other foreign materials.
2. During application ambient temperature is preferred. Frost, fog, or damp conditions should be avoided. | 200 | Sqm | 300 ₹60,000 Lowest | 777 ₹1,55,400 | 1,000 ₹2,00,000 | 540 ₹1,08,000 | 400 ₹80,000 | 700 ₹1,40,000 | 600 ₹1,20,000 | 695 ₹1,39,000 |
| 7.00 | Material and labour for appplying 02 coats of Nanotechnology based water-based one pack epoxy based Nano barrier coat, durable, highly water repellent, UV resistant, fungus/ algae/ bacteria resistant, thermally insulating and elastomeric incl high capillary pressure resistance, anti-bacterial, low VOC, UV resistance, high coverage area @ 6.5 sqm/kg in each coat complete all as specified.
Note :
1. Rate shall include for making surface clean,dustfree, dry, and free of wax, grease, oil, loose or peeling particle, and other foreign materials.
2. During application ambient temperature is preferred. Frost, fog, or damp conditions should be avoided. | 200 | Sqm | 350 ₹70,000 Lowest | 777 ₹1,55,400 | 1,000 ₹2,00,000 | 640 ₹1,28,000 | 400 ₹80,000 | 1,400 ₹2,80,000 | 800 ₹1,60,000 | 695 ₹1,39,000 |
| 8.00 | M&L for Cement Concrete 1:2:4 type B1 (Using 12.5mm graded stone aggregates) on roof padding surface finshed even and smooth without using extra cement complete and as specified | 281.25 | Cum | 4,200 ₹11,81,250 | 4,477 ₹12,59,156.25 | 5,000 ₹14,06,250 | 4,100 ₹11,53,125 | 3,900 ₹10,96,875 | 2,200 ₹6,18,750 Lowest | 3,500 ₹9,84,375 | 3,255 ₹9,15,468.75 |
| 9.00 | M&L for 15mm average thick (average) rendering in cement mortar 1:4 using WPC (@ 3% of cement wt.) on roof surfaces & finished even and smooth with using extra cement in any position upto G+3 storey bldg complete all as specified. Note:- cost of WPC is included. | 3,750 | Sqm | 180 ₹6,75,000 | 177 ₹6,63,750 | 100 ₹3,75,000 Lowest | 180 ₹6,75,000 | 130 ₹4,87,500 | 180 ₹6,75,000 | 100 ₹3,75,000 Lowest | 144 ₹5,40,000 |
| 10.00 | M&L for applying a coat of bituminous primer conforming to IS - 3384 @ 0.50 Litres/sqm on prepared surfaces of plaster and applying APP based polymeric membrane with plane slate finish @ 4.00 Kg/Sqm and minimum 3mm thick reinforced with polyester non woven fabric and sealing joints by torch application including demolition of existing upto G+5 storey bldg complete all as specified and directed.
Note :-
(a) The work shall be executed through authorised applicator of manufacturer only.
(b) Authrised Applicator shall be approved by GE before starting of work.
(c) All materials shall be procured directly form manufacturer. The purchase voucher shall be produced to the Engineer-in-Charge for his verification of material.
Engineer-in-Charge shall deface the original purchase vouchers.
(d) MOU with authorized applicator | 3,750 | Sqm | 435 ₹16,31,250 | 477 ₹17,88,750 | 330 ₹12,37,500 Lowest | 440 ₹16,50,000 | 390 ₹14,62,500 | 500 ₹18,75,000 | 350 ₹13,12,500 | 424 ₹15,90,000 |
Tender Value
₹80 L
EMD Value
₹1.4 L
Closing Date
12 Mar 2026, 6:00 pmClosed
CWE DELHI CANTT
HQ CWE DELHI CANTT 110010
REPAIR MAINT OF ROOF LEAKAGE SEEPAGE IN CERTAIN ACCN AT SANJAY VIHAR OLD NEW APS COLONY 1 AHQ SIG REGT AND OTHER ADJOINING AREA OF AGE B AND R II UNDER GE CENTRAL DELHI CANTT
2026_MES_752422_1
CWE/D-101/2025-26
Open Tender
Civil Works
Item Rate
180 days
DELHI CANTT
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
GE CENTRAL DELHI CANTT
₹1.4 L
Yes
6 May 2026
12 Feb 2026
13 Mar 2026
12 Feb 2026
12 Mar 2026
5 Mar 2026
Demolation Bricks Tiles (laid flat or on Edge) or brick tiles in floor ,roof ,channels,kerbs,Aprons,etc.(each layer)all as specified and directed
Demolation mud in Roofs,any thicknes ,including plastering and lapping (weather full thickness Removed or only a part there of ) all as specified and directed (as per site requirment)
Removed Demolished materials exc 1.5 km and Deposting where as Directed at Above the Starting point all as specified and directed
M & L for removal of plants ( area with in n exc 0.50sqm) growth by injection with chemical glyphosphate solution (4 % concentration) @ 20 ml or till refuse by cutting or injection in stem of plants or roots at 30 mm. The area shall then be sprayed with solution 25 ml glyphosphate (4% conc) diluted with 1 ltr of water, including taking out roots from roof / brick work and making good the disturbed surface with plaster and PCC 1 :2:4 type B0 and disposing the rubbish from site (MOD land) of upto G+ 5 storey height complete and as specified
Material and labour for applying a coat of Nano technology based water proofing compound (1 part powder : 1 part liquid), of desired consistency with nylon brush @ 5 sqm/kg coverage over vertical/horizantal surface of RCC roof and parapet complete all as specified.
Material and labour for appplying Nanotechnology based Anti-corrosive with high strength carbon Fiber based shorter chain Epoxy coating (Bond Coat) of finest quality, high strength, high penetration, durable, UV resistant, high scratch/ impact resistant, bacteria resistant and thermally stable, Semi transparent, mixed in proportion (4 Base : 1 Hardner) in reqd consistency @ 8 sqm/kg over the entire prepared surfaces of roof/parapet/sunken floor complete all as specified. Note : 1. Rate shall include for making surface clean,dustfree, dry, and free of wax, grease, oil, loose or peeling particle, and other foreign materials. 2. During application ambient temperature is preferred. Frost, fog, or damp conditions should be avoided.
Material and labour for appplying 02 coats of Nanotechnology based water-based one pack epoxy based Nano barrier coat, durable, highly water repellent, UV resistant, fungus/ algae/ bacteria resistant, thermally insulating and elastomeric incl high capillary pressure resistance, anti-bacterial, low VOC, UV resistance, high coverage area @ 6.5 sqm/kg in each coat complete all as specified. Note : 1. Rate shall include for making surface clean,dustfree, dry, and free of wax, grease, oil, loose or peeling particle, and other foreign materials. 2. During application ambient temperature is preferred. Frost, fog, or damp conditions should be avoided.
M&L for Cement Concrete 1:2:4 type B1 (Using 12.5mm graded stone aggregates) on roof padding surface finshed even and smooth without using extra cement complete and as specified
M&L for 15mm average thick (average) rendering in cement mortar 1:4 using WPC (@ 3% of cement wt.) on roof surfaces & finished even and smooth with using extra cement in any position upto G+3 storey bldg complete all as specified. Note:- cost of WPC is included.
M&L for applying a coat of bituminous primer conforming to IS - 3384 @ 0.50 Litres/sqm on prepared surfaces of plaster and applying APP based polymeric membrane with plane slate finish @ 4.00 Kg/Sqm and minimum 3mm thick reinforced with polyester non woven fabric and sealing joints by torch application including demolition of existing upto G+5 storey bldg complete all as specified and directed. Note :- (a) The work shall be executed through authorised applicator of manufacturer only. (b) Authrised Applicator shall be approved by GE before starting of work. (c) All materials shall be procured directly form manufacturer. The purchase voucher shall be produced to the Engineer-in-Charge for his verification of material. Engineer-in-Charge shall deface the original purchase vouchers. (d) MOU with authorized applicator
M&L for applying two coat of silver Shield BITUMINIOUS paint on app membrane complete all as specified and directed by Engr-in-Charge.
M &L for Brushing neat cement slurry with 3 Kg of cement per square metre complete all as specified and directed .
Disconnecting existing tanks, setting aside (or lowering if required) for repairs, cleaning, etc. and hoisting if required reconnecting and re-fixing in position. PVC water tanks of exc 250 litres and n.exc 500 litres capacity of any condition or type incl complete all as specified and directed.
S&F 500 ltr capacity rotational moulded polyethylene water storage tanks triple layer (cylindrical vertical with closed top) hoisted and fixed in position with 20mm Ball brass valves,high pressure,with polythene float and flynut complete, screwed for iron pipe or brass ferrule Minimum wt 20mm-210grm and s&f in repair 20mm dia Gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed incl Dismantling of PVC water tanks of exc 250 litres and n.exc 500 litres capacity of any condition or type incl complete all as specified and directed.
M & L for Cleaning and removing all scale and dirt, etc, from tanks and from mouths of circulating pipes, etc complete all as specified and directed.
S & F in Repair 2mm thick fiber glass reinforced transculent corrugated sheeting with two corrugation side lap fixed with coach screw in roof wall Etc all as specified and directed .
Dismantling wrought iron or mild steel work of any description not otherwise provided complete all as specified and as directed
S & F Framed bracket of angles or tees with web and flanges cut to shape, drilled and countersunk for screw, including bending and welding angles, as necessary,gusset plates, riveting, etc.. n exc 10 kg each brackets, conforming to Fe.290.Gde-E-165 (Brackets over 10 kg each to be measured under 'Structural Steel') all as specified and directed
S&F in repair stop valve cast copper alloy screw down high pressure with crutch or butterfly handel screwed both ends for 20mm dia iron pipes or for unions and fixed complete all as specified and directed by Engineer-in-Charge.
Demolition of brick work built in cement mortar in any description and position, upto G+5 storey bldg complete all as specified..
M & L for Brick work with old size bricks straight or curved on plan exceeding 6 metre mean radius built in cement mortar 1:6 (1 cement : 6 coarse sand), upto G+5 storey bldg complete all as specified.
Taking down cement plaster in any thickness from brick or stone etc including raking out joints, hacking for key, scrubbing down with water etc upto G+5 storey bldg complete all as specified.
M & L for 15 mm thick rendering in cement mortar 1:4 on fair face of New brick walls/ concrete surfaces & finished even and smooth without using extra cement, complete all as specified.Note:- cost of WPC is paid separately
M&L for Newly plastered or unplastered wall surface and apply 2mm thick wall care putty for smooth surface and applying two coats of weather coat/apex paint on walls/ceilings complete all as specified and directed.
M&L for providing cement concrete in lintels upto 1.5mtr clear span,cill,stepd,sesmic and other slimlar bands ,plinth course ,string courses,lacing courses ,parapets and raling upto 60cm in height copings kneelers apex stone bed plates, water trufs and like including weathring slighthly rounded or chamfered angles and throting etc type B1, 1 : 2 : 4 using 20mm graded aggregate and set in CM 1 : 4 complete all as specified.
S&F in repair for 110mm bore PVC (SWR) pipes single socketed, in any length with rubber ring joints, laid in trenches or in floors complete all as specified and directed.
S&F in repair of PVC (SWR) bends any radius of 110mm bore complete all as specified
Supply only liquid water proofing compound complete all as specified and directed.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
TENDERDOCUMENT101.pdf
Tender Documents • 1.50 MB
BOQ_842749.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .