| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L-1 | Accepted-AOC being lowest 1 |
| 2 | L-2₹1.2 Cr+₹1.8 L (1.52%)Rejected-AOC | ₹1.2 Cr+₹1.8 L (1.52%) | L-2 | Rejected-AOC being not lowest 1 |
| 3 | L-3₹1.2 Cr+₹2.4 L (2.04%)Rejected-AOC | ₹1.2 Cr+₹2.4 L (2.04%) | L-3 | Rejected-AOC being not lowest 1 |
Tender Value
₹1.1 Cr
EMD Value
₹2.3 L
Closing Date
6 Oct 2022, 11:00 amClosed
Er. Rajesh Vashisht
Additional Superintending Engineer, Nangal Dam Division, BBMB, Nangal Township
Providing and fixing chain link fencing of Nangal Hydel Channel from RD-57825 to Ganguwal Spillway and Ganguwal spillway to Charanganga RD 62164 left side and RD 58000 to forebay upstream of Ganguwal Power House right side of NHC.
2022_BBMB_89041_1
97/2022/NDD
Open Tender
Civil Works
Tender cum Auction
365 days
Ganguwal
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
₹2.3 L
16 Jan 2024
25 Aug 2022
6 Oct 2022
25 Aug 2022
6 Oct 2022
25 Aug 2022
Amount
Cvil work
Dismantling stone masonry / Rubble masonry including stacking of serviceable materials and disposal of unserviceable materials. In cement. [As per CSR-2020 item No. 8.1-b]
Earth work in excavation in foundations, trenches etc.in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation, and subsequent filling around masonry in 15 cm layer with compaction including disposal of all surplus soil as directed with in a lead of 30 meter. [ As per CSR-2020 item No. 6.6]
Cement Concrete 1:4:8 with Stone aggregate 40 mm gauge mixing by mechanical means using concrete mixer volumetric type [As per CSR-2020 item No. 10.11-b-ii]
Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering). [As per CSR 2020 Item No.9.1]
Cement Concrete 1:2:4 with stone ballast or shingle mixing by mechanical means using concrete mixer volumetric type. [ As per CSR-2020 item No.10.13-a-ii ]
Boulder masonry in cement mortar 1:6 in foundation and plinth. (Stone boulder to be supplied by the deptt free of cost) (Labour Rate) [CSR 2020 Item No. 12.33]
Boulder masonry in cement mortar 1:6 in foundation and plinth. (Through Rate) [CSR 2020 Item No. 12.33]
Cement pointing flush 1:2 (flush) on stone walls. [As per CSR-2020 item No.15.63]
Steel work fixed independently without connecting plates including cutting hoisting and fixing in position Tees angles & channels. [As per CSR-2020 item No.18.1-c]
Structural steel work in angles, tees and flats, riveted or welded including cutting fixing all gusset plates, bolts, nuts, rivets, welding rod, etc. with hoisting and erecting in position For roof trusses, well curbs, plates and trussed girders, etc. of any span for buildings and bridges up to 15 m span. (Through Rate) [As per CSR-2020 item No.18.3-a]
Providing and fixing G.I chain link fabric fencing of required width in mesh size 50 x 50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per direction of Engineer- in-charge.(AOR).
Applying priming coat with metal primer on new steel or iron work including preparation of surface. [As per CSR-2020 item No.16.20]
Painting one coat with aluminium paint on old work to give an even shade. [As per CSR-2020 item No.16.26]
Bidder Name
Amount in Words
ANMOL KATYAL CONTRACTOR
VINOD KUMAR SHARMA
SUBASH CHAND
SUBASH CHAND
VINOD KUMAR SHARMA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .