Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC BANSAL NIWAS RAM NAGAR SHIMLA 171004 HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 171004 | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.1 L+₹6,500 (1.60%)Rejected-AOC HIMACHAL PRADESH HP | CHAMBA | HIMACHAL PRADESH | 176207 | L2 | Rejected-AOC L2 | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Docs not submitted |
Tender Value
₹3.9 L
EMD Value
₹8,000
Closing Date
2 Feb 2023, 5:00 pmClosed
XEN Electrical Division No. 1 Shimla
The Executive Engineer Electrical Division No-1 HPPWD Shimla-9
Annual Maintenance of stage lighting, Sound system Video Projection system installed in New Admn. Block HP. High Court Shimla for the period of one year 2023-24 w.e.f.1.02.2023 to 31.01.2024
2023_PWD_67492_1
Electrical Div.No.I PWD Shimla 8461-66 dt.17.01.20
Open Tender
Electrical Works
Item Rate
365 days
SHIMLA
Please refer Tender documents.
7 documents required · 7 mandatory
₹350
E.E.Electrical Division No-I Shimla-9
₹8,000
26 Feb 2023
27 Jan 2023
3 Feb 2023
27 Jan 2023
2 Feb 2023
27 Jan 2023
Amount
AMC of stage lighting system, Sound Sysytem, video projection system including minor repairs, electrical wiring components etc. as per best satisfactory by Engineer-in-Charge.
One qualified Technical person deputed for operating the above system during the each event/function at Hon'ble H.P. High Court Campus.(Lump-sum event/function i.e. 18 nos.)
Terms and conditions:-
Contractor will engage 1 No. Electrician-II & 1 No. T/mate from 9.00 am to 5.00 p.m. or as required by the controlling officer in case of emergency for attending the complaints of area under Electrical subdivision Nahan .
The staff employed should be trained and must have done ITI in Electrician Trade, should have knowledge of wiring, repair and maintenance and other basic technical terminology. Preferably should have experience in E.I. related works
Competent Electrician will be required to attend break down call as and when intimated withing the least possible time but not more than 24 hours in any case, there is no limit of break down calls. The sole responsibility shall be of the firm to keep the whole system in running condition round the clock.
The work shall be carried out as per direction and up to the satisfaction of Engineer-in-Charge.
The contractor will submit the attendance register after each month duly coutersigned by the Engineer-in-Charge only then the payment will be released to the contractor.
MANOJ KUMAR BANSAL
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_101685.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .