Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.3 Cr
EMD Value
₹2.3 L
Closing Date
7 Nov 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Bruhat Bengaluru Mahanagara Palike
Subramanya J V
Beautification Landscape Development Water facility and other civil works in Bangalore South Assembly constituency parks
BBMP/2024-25/OW/WORK_INDENT4636
BBMP/2024-25/OW/WORK_INDENT4636
Open
Other Works
Two Tender Document System(Two Cover)
BBMP Senior Assistant Director of Horticulture Bommanahalli
8 documents required · 8 mandatory
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
₹3,210
₹2.3 L
29 Oct 2024
29 Oct 2024
9 Nov 2024
30 Oct 2024
30 Oct 2024
Beautification Landscape Development Water facility and other civil works in Bangalore South Assembly constituency parks
Beautifiction Landscape Development and Borwell works in Garebhavipalya SITE/JUNGLE CLEARENCE Cutting and clearing thin jungle including removal of roots with a intitial lead of 50 m and life of 1.50 ...
Planting of Shrubs Shrubs in Isolated Plants. Digging pits of size 0.45x0.45x0.45 filling up to 50Percentage of the pits with top excavated soil and remaining 50Percentage with the mixture of sand (0....
Cost of the Plant (including Transportation and Handling Charges)
Shrubs in Groups Developing the area for shrubs by digging to a depth of 0.45m filling 50Percentage with sand (00375 Cum) FYM (0.075 Cum) Red earth (0.21) (that is in the proportion of 1 2 3) and plan...
Cost of the Plant (8 Plants per Sqm) including Transportation and Handling Charges
Planting of Creepers Digging pits size 0.45m x 0.45m x 0.45 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with the mixture of sand (0.007 Cum) Fym (0.014 Cum) ...
Cost of the Plant (including Transportation and Handling Charges)
Planting of Ground Cover Plants Developing the area for ground cover pants by digging to a depth of 0.45m filling 50Percentage of the area with excavated top soil and remaining 50Percentagewith sand (...
Cost of the Plants (10 Plants per Sqm) including Transportation and Handling Charges
Hedges Developing hedges by digging trenches of size 0.45mx0.45m filling 50Percentage of the trench with excavated top soil and remaining 50Percentage with the mixture of sand (0.0112 Cum) FYM (0.0224...
Cost of plants 7 Plant per Rmtr
Mound Formation Providing and forming mound using red earth by filling spreading and leveling to the required grade s per design. (including scraping and removing top layer of soilremoving unwanted de...
development of lawn scraping and removing top soil cleaning the site by scraping and removing top layer of soil removing unwanted debris grass along with excavated earth to a distance of 500m from the...
1st DIGGING FOR LAWN Earthwork digging including removing weeds. debris if any and breaking of clumps watering etc. to a depth of
2nd DIGGING FOR LAWNDigging for second time and removing weeds if any miner leveling to a depth of 0.45m
Soil Filling for Lawn Supply and stocking good quality red earth etc for filling the top layer to a depth of 0.15m
Providing Sand FYM and Red earth in the ratio of 1 3 6 and spreading to a depth of 7.5 cm at the required site
Chemical Fertilizer Super Phospates (50 gm/Sq.m Rs. 0.1.00/ Sq.m) Neeem oil cake (250gm/Sq.m Rs. 6.00/Sq.m) Bone meal (250gm/Sq.m Rs. 4.00/Sq.m) Potash (50gm/Sq.m Rs.1.00/Sq.m) Furodon (25gm/Sq.m Rs.2...
Other Charge cost towards dibbling/laying of lawn inclusive of mixing of ingradients application of manure and spreading 5x5 Cm
Supplying of Red Soil (New Earth Filling) Supply of Good Quality Red Soil for Gardening and Growing of Plants Shrubs Etc. Including the weightage given to B.B.M.P. Area
Sprinkler System Providing and fixing of sprinkler system with in the site by using 25mm/10kg40mm/6kg 50mm/6kg good quality PVC pipesISI marked sprinklers control valves and fitiings etc Including exc...
Planting Specimen Plants Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in th...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportionof 1 2 3) and...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportionof 1 2 3) and...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Planting of TreesDigging pits of size 0.75mx0.75mx0.75m and filling upto 50Percentage of the pits with top excavated soil and remaining 50Percentage with sand(0.035 Cum) Fym(0.070Cum) Red Earth(0.105C...
Cost of the Plant 5 - 10 Height
Supplying and fixing polished grey granite slab benches of size 5 feet width of seating slab with bottom slab of 75mm th. with 1.5 feet width with two stands strong base with back slab (suport) machin...
Maintenance of Park in Garebhavipalya Bommanahalli zone
Beautifiction Landscape Development and New Drilling Borwell works in Uttarahalli Junction (BBMP Help line) ParkSITE JUNGLE CLEARENCE Beautifiction Landscape Development and New Drilling Borwell works...
Planting of Shrubs Shrubs in Isolated Plants. Digging pits of size 0.45x0.45x0.45 filling up to 50Percentage of the pits with top excavated soil and remaining 50Percentage with the mixture of sand (0....
Cost of the Plant ( including Transportation and Handling Charges)
Shrubs in Groups Developing the area for shrubs by digging to a depth of 0.45m filling 50Percentage with sand (00375 Cum) FYM (0.075 Cum) Red earth (0.21) (that is in the proportion of 1 2 3) and plan...
Cost of the Plant (8 Plants per Sqm) including Transportation and Handling Charges
Hedges Developing hedges by digging trenches of size 0.45mx0.45m filling 50Percentage of the trench with excavated top soil and remaining 50Percentage with the mixture of sand (0.0112 Cum) FYM (0.0224...
Cost of plants7 Plant per Rmtr
DEVELOPMENT OF LAWN SCRAPING AND REMOVING TOP SOIL Cleaning the site by scraping and removing top layer of soil removing unwanted debris grass along with excavated earth to a distance of 500m from the...
1st DIGGING FOR LAWN Earthwork digging including removing weeds. debris if any and breaking of clumps watering etc. to a depth of
2nd DIGGING FOR LAWN Digging for second time and removing weeds if any miner leveling to a depth of 0.45m
Soil Filling for Lawn Supply and stocking good quality red earth etc for filling the top layer to a depth of 0.15m1x1x0.15)
Providing Sand FYM and Red earth in the ratio of 1 3 6 and spreading to a depth of 7.5 cm at the required site
Chemical Fertilizer Super Phospates (50 gm/Sq.m Rs. 0.1.00/ Sq.m) Neeem oil cake (250gm/Sq.m Rs. 6.00/Sq.m) Bone meal (250gm/Sq.m Rs. 4.00/Sq.m) Potash (50 gm/Sq.m Rs.1.00/Sq.m) Furodon (25gm/Sq.m Rs....
Supply of lawn grass Phasphalam grass
Other Charge cost towards dibbling/laying of lawn inclusive of mixing of ingradients application of manure and spreading
Supplying of Red Soil (New Earth Filling) Supply of Good Quality Red Soil for Gardening and Growing of Plants Shrubs Etc Including the weightage given to B.B.M.P. Area
Sprinkler System Providing and fixing of sprinkler system with in the site by using 25mm/10kg40mm/6kg 50mm/6kg good quality PVC pipesISI marked sprinklers control valves and fitiings etc Including exc...
Planting Specimen Plants Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in th...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Planting of Trees Digging pits of size 0.75mx0.75mx0.75m and filling upto 50Percentage of the pits with top excavated soil and remaining 50Percentage with sand(0.035 Cum) Fym(0.070Cum) Red Earth(0.105...
Cost of the Plant 5’ - 10 Height
Supplying and fixing polished grey granite slab benches of size 5 feet width of seating slab with bottom slab of 75mm th. with 1.5 feet width with two stands strong base with back slab (suport) machin...
Maintenance of Park in (BBMP Help line Bommanahalli zone
Beautifiction Landscape Development Borwell and Pathway resetting Fencing Repair works in Himagiri Park J.P Nagara SITE /JUNGLE CLEARENCE Cutting and clearing thin jungle including removal of roots wi...
Planting of Shrubs Shrubs in Isolated Plants. Digging pits of size 0.45x0.45x0.45 filling up to 50Percentage of the pits with top excavated soil and remaining 50Percentage with the mixture of sand (0....
Cost of the Plant ( including Transportation and Handling Charges)
Shrubs in GroupsDeveloping the area for shrubs by digging to a depth of 0.45m filling 50Percentage with sand (00375 Cum) FYM (0.075 Cum) Red earth (0.21) (that is in the proportion of 1 2 3) and plant...
Cost of the Plant (8 Plants per Sqm) including Transportation and Handling Charges
Hedges Developing hedges by digging trenches of size 0.45mx0.45m filling 50Percentage of the trench with excavated top soil and remaining 50Percentage with the mixture of sand(0.0112 Cum) FYM (0.0224C...
Cost of plants 7 Plant per Rmtr
DEVELOPMENT OF LAWN SCRAPING AND REMOVING TOP SOIL Cleaning the site by scraping and removing top layer of soil removing unwanted debris grass along with excavated earth to a distance of 500m from the...
1st DIGGING FOR LAWN Earthwork digging including removing weeds. debris if any and breaking of clumps watering etc. to a depth of
2nd DIGGING FOR LAWNDigging for second time and removing weeds if any miner leveling to a depth of 0.45m
Soil Filling for Lawn Supply and stocking good quality red earth etc for filling the top layer to a depth of 0.15m 1x1x0.15)
Providing Sand FYM and Red earth in the ratio of 1 3 6 and spreading to a depth of 7.5 cm at the required site
Chemical Fertilizer Super Phospates (50 gm/Sq.m Rs. 0.1.00/ Sq.m) Neeem oil cake (250gm/Sq.m Rs. 6.00/Sq.m) Bone meal (250gm/Sq.m Rs. 4.00/Sq.m) Potash (50 gm/Sq.m Rs.1.00/Sq.m) Furodon (25gm/Sq.m Rs....
Phasphalam grass
Other Charge cost towards dibbling/laying of lawn inclusive of mixing of ingradients application of manure and spreading (5x5 Cm)
Supplying of Red Soil (New Earth Filling) Supply of Good Quality Red Soil for Gardening and Growing of Plants Shrubs Etc. Including the Percentage weightage given to B.B.M.P. Area
Sprinkler System Providing and fixing of sprinkler system with in the site by using 25mm/10kg40mm/6kg 50mm/6kg good quality PVC pipesISI marked sprinklers control valves and fitiings etc Including exc...
Planting Specimen Plants Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in th...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Digging pits size 0.75m x 0.75m x 0.75 filling up to 50Percentage the pits with top excavated soil and remaining 50Percentage with sand Fym Red earth (0021 Cum) (that is in the proportion of 1 2 3) an...
Planting of Trees Digging pits of size 0.75mx0.75mx0.75m and filling upto 50Percentage of the pits with top excavated soil and remaining 50Percentage with sand(0.035 Cum) Fym(0.070Cum) Red Earth(0.105...
Cost of the Plant 5 10 Height
Supplying and fixing polished grey granite slab benches of size 5 feet width of seating slab with bottom slab of 75mm th. with 1.5 feet width with two stands strong base with back slab (suport) machin...
Maintenance of Park inHimagiri Park J.P Nagara Bommanahalli zone
Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or PWSS by vertical electrical sounding by adopting Venner or Sc...
Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG and above 1100 CMF and above in all strata including over burdern upto 20 m. Fixing of casing pipes collars a...
Above 50.00 to 100.00m depth
Above 100.00 to 150.00m depth
Above 150m to 200m depth
Above 200m to 250 m depth
Above 250m to 300 m depth
Above 300m to 350 m depth
Above 350m to 375 m depth
Supply of ISI mark 175mm nominal boreplain and steel casing pipe grade of steel Fe 410 of wall thickness conforming to IS 4270-2001 and latest ammendments electrical resistance welded steel tubes mate...
Providing and fixing MS casing collars as per IS 1239 (part-II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm minimum. The dimension...
Providing and laying at site of work MS casing caps as per IS 1239 (part-II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm minimum T...
Providingsupplying to work site Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase SS Bowl and Impeller with Low volt Motor as per specificationsas per nece...
Providing and fixing in trenches galvinised/mild steel tube 50mm dia nominal bore with all fittings (earth work in trenches to be measured and paid for seperately) including cost of all materials labo...
Supplying and drawing 3 core flat PVC sheathed submersible pump cable manufactured with electrolytic grade copper with flexible copper with low resistance conductor confirming to13 8130-1984 and virgi...
Providing and fixing in position 50mm Nominal bore non- return Valve verticle type of approved make including cost of all materials labour HOM of equipment with all lead complete as per Specification
Spplying and fixing 50mm GI Union
Spplying and fixing 50mm GI Elbow.
Spplying and fixing 50mm GI Nipple.
Spplying and fixing 50mm GI Hose collers
Fabricating Supplying and mounting MS box made out SWG suitable for floor / wall mounting fully weather proof with provision for better heat dissipation provided with hinged front cover equipped with ...
Supplying and fixing angle iron frame work Fabricated out of MS angle iron and MS flat with bolts nuts washersetc and painted with two coats of Red oxide and pants
Supplying and fixing 20inches x 20inches x 2.5inches polished wood board made of not less than 15mm thick plank on both the sides with planks made out of not more than 2 pieces and fixing the same to ...
Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and C Type curve indicator ON/OFF energy cross-3 with Short circuit breaking capaci...
Supplying fixing and wiring Earth Leakage Miniature Circuit Breaker (ELMCB) 240/450V up to 300mA sensitivity on existing wood/panel board.
Supplying of TPST with rewirable porcelain channels in SM encloser made out of 14 SWG powder coated point of approved colour 63 amps
Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440v A.C. 50 Hz 12/24v D.C.
Suppling fully automatic star delta starter unit push button type with suitable wires 2 conductors and adjustable thermal timer mounted on a common base plate held in steel enclosure for use on 400/44...
Supplying and fixing single phase preventer using necessary wires over an existing panel board suitable for motar up to 20 HP capacities.(Electrical SR 2022-23.P-10 SL-5.3
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade multistrand copper conductor single core wire in open or concealed system of wiring as per IS 694 1990 and conforming to t...
Supplying fixing and wiring heavy duty low voltage capacitors conforming to IS 2834 phase 400/440 volts grade for power factor improvement of rotating machinery.
Supplying fixing wiring earth electrode for grounding conduits I.C cotouts and other equipments on the meter board using 40mm dia 2.90 thick GI pipe 2.5 mtr long buried in a pit… The pit should be f...
Digging of trench of 0.36mtrs deepx0.5 mtrs wide refilling the trench to the required gorund level and consolidating etc. complete (PWD Ele SR 2019-20p-41It-6.6.2) hard soil
Supplying of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1 Armouring strip thickness in average +5Per...
Labour charge for laying 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe/ on wall / on poles as required in existing trench/duct. 6 sq mm to 16 sq mm(PWD Ele SR 2019-20 p-41It-6.5.1)...
Supplying and fixing class-A(medium duty) GI pipe wall thickness not less then 3.25mm on pole/wall/drain crossing with necessary clamping arrangements for UG cable of 1.1KV class 40mm(PWD Ele SR 2019-...
Supplying and fixing LT cast iron pot heads suitable for 1.1KV class UG cable filled with necessary bitumen / insulating compound complete with terminalsclamps bolts and nuts and washer etc.complete f...
Supplying and fixing porcelain fuse channel with cut out on the existing wooden block and wiring complete 63 amps (Electrical SR 2022-23.P-10 SL-5.7.3
Earth work excavation by manual means for drains canals waste weir draft approach channels key trenches foundation of bridges and such simillar works in all kinds of soils as per drawing and technical...
Providing and installing at site of work PVC pipes including cost of pipes and specials and labour including lowering into trenches laying true to line level and perfect linking at joints leak proof i...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and constructing un-reinforced plain cement concrete pavement thickness as per design over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade) coars...
BESCOM Deposit charges for Borewell
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW-4 South.docx
Tender Document • 0.12 MB
Notification Developmen New Work.docx
Tender Document • 0.02 MB
Corrigendum letter.docx
Tender Document • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .