Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC 648 GANDHI NAGER ERACHAKULAM | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.8 L+₹11,082.54 (3.03%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | C.SUGANTHAN WORKS CONTRACTOR L1 | P.PAUL PANDIAN L2 |
|---|---|---|---|---|---|
| 1.00Constructionn of CC Pavement | |||||
| 1.01 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete | 34 | m3 | 109.07 ₹3,708.32 Lowest | 112.37 ₹3,820.7 |
| 1.02 | Cement Concrete 1:4:8 (One Cement, Four crushed stone sand and Eight broken stone jelly) using 40mm size hard broken stone jelly excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. | 34 | m3 | 5,363.28 ₹1,82,351.37 Lowest | 5,525.8 ₹1,87,877.17 |
| 1.03 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 27 | m2 | 6,654.24 ₹1,79,664.36 Lowest | 6,855.88 ₹1,85,108.73 |
Tender Value
Refer Docs
EMD Value
₹4,600
Closing Date
18 Jun 2026, 3:00 pmClosed
Commissioner Nagercoil City Municipal Corporation
City Municipal Corporation Office Nagercoil 629001 Ph.No. 04652230984
Nagercoil Corporation Constructionn of CC Pavement in Maps street, WCC cross street and Cave cross street at ward 23
2026_MAWS_679489_1
26/2026-27/AEE
Open Tender
Civil Works
Lump-sum
90 days
Nagercoil Corporation Constructionn of CC Pavement
Registered Contractor
3 documents required · 3 mandatory
₹0
₹4,600
8 Oct 2026
4 Jun 2026
18 Jun 2026
4 Jun 2026
18 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Constructionn of CC Pavement | |||||
| 1.01 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete | 34 | m3 | - | - |
| 1.02 | Cement Concrete 1:4:8 (One Cement, Four crushed stone sand and Eight broken stone jelly) using 40mm size hard broken stone jelly excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. | 34 | m3 | - | - |
| 1.03 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 27 | m2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_816379.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.73 MB
BOQ_816379.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .