Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Finance GSTIN: 08CNDPG5310D1ZK | -36.71% | ₹10.6 L | L1 | Admitted-Finance |
| 2 | L2₹10.9 LAdmitted-Finance GSTIN: 08ABMFS8977R1ZN, 08ADLFS4409G1ZU, 08CEJPG3395F1ZC, 08DBKPK5801F1ZP, 08DQDPS0021P1ZMWARD NO 09 VPO CHHAPOLI UDAIPURWATI JHUNJHUNU RAJASTHAN 333302 | JHUNJHUNU | RAJASTHAN | 333302 | -35.01% | ₹10.9 L | L2 | Admitted-Finance |
| 3 | L3₹11.2 LAdmitted-Finance | -33.33% | ₹11.2 L | L3 | Admitted-Finance |
| 4 | L4₹11.7 LAdmitted-Finance GSTN: 08AFFPK9344D1ZF | -30.31% | ₹11.7 L | L4 | Admitted-Finance |
| 5 | L5₹13.0 LAdmitted-Finance GSTN: 08AKMPJ7378N2Z6 | -22.91% | ₹13.0 L | L5 | Admitted-Finance |
Tender Value
₹16.8 L
EMD Value
₹33,620
Closing Date
10 Mar 2026, 6:00 pmClosed
Executive Engineer
Executive Engineer WR Canal Division Ist Bisalpur Project Tonk
Repair And Renovation Of Gulabpura Minor From Rd 3100 To 3500 Mtr.
2026_WRDAS_542707_7
E-Nit No. 08 Year 2025-26 MJSA
Open Tender
Civil Works
90 days
Tonk
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
AS PER NIT
₹33,620
Yes
13 Mar 2026
27 Feb 2026
11 Mar 2026
27 Feb 2026
10 Mar 2026
27 Feb 2026
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick
Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required.In cement mortar
Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil
Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm
Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. In cement sand mortar 1:5 Masonry work in superstructure
Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 50 mm
Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: 20 mm
Re-handling of excavated material including loading unloading and dressing within initial lead of 50 m and lift of 1.5m with cost of de-watering wherever required and all applicable taxes and levies etc. complete in all respect Earth / Soil
Supplying, Laying & consolidation of quarry rubbish / Murrum / Murda to required grade & camber in layers not exceeding 15 cm. thickness (loose) by road roller as per specifications including dressing etc. complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.77 MB
BOQ_967450.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid