| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹1.1 L (0.51%)Admitted-Finance | ₹2.1 Cr+₹1.1 L (0.51%) | L2 | Admitted-Finance |
| 3 | L3₹2.2 Cr+₹12.5 L (6.02%)Admitted-Finance | ₹2.2 Cr+₹12.5 L (6.02%) | L3 | Admitted-Finance |
| 4 | L4₹2.5 Cr+₹42.8 L (20.6%)Admitted-Finance | ₹2.5 Cr+₹42.8 L (20.6%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | TZ Engineering Works L2 | M/S NEW ALLIED L1 | M/s MIR ELECTRICAL L4 | WALI MOHD KUCHAY L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth Work excavation of foundation pits including all Labour, T&P, leads & lifts, stockpiling, making of working space, carriage, disposal of excaveted soil, backfilling including cost of borrowed good earth & dressing of surplus excavated earth and dewatering during excavation... All Kind Of Soil | 2,071 | Cum | 90 ₹1,86,390 Lowest | 156 ₹3,23,076 | 112 ₹2,31,952 | 500 ₹10,35,500 |
| 2.00 | Close timbering in trenches including strutting and shoring complete. Only forPartially Submerged and Fully Submerged Foundations…..Depth exceeding 1.5m but not exceeding 3m | 2,390 | Sq.M | 45 ₹1,07,550 | 29 ₹69,310 Lowest | 45 ₹1,07,550 | 400 ₹9,56,000 |
| 3.00 | Reinforcement for R.C.C. work including straightning, cutting,bending, placing in position and binding all complete bars (TMT) including all carriages(manual and mechanical) | 26,693 | Kg | 85 ₹22,68,905 Lowest | 90 ₹24,02,370 | 105 ₹28,02,765 | 90 ₹24,02,370 |
| 4.00 | Supply Of Stubs and cleats(as per drawing) | 2,340 | Kg | 145 ₹3,39,300 | 128 ₹2,99,520 Lowest | 170 ₹3,97,800 | 155 ₹3,62,700 |
| 5.00 | Stub setting including transportation, carriage of Stubs & Templates. | 3 | Set | 20,000 ₹60,000 | 8,000 ₹24,000 Lowest | 23,111 ₹69,333 | 10,000 ₹30,000 |
| 6.00 | Providing and laying in position Cement Concrete of specified grade including curing ,Carriage of materials Mechanical & Mannual but excluding th cost of centring and shuttering.All workupto plinth level with…. 1:3:6 (1cement:3coarse sand:6 graded stone aggregate 40mm nominal size) | 57.1 | Cum | 7,000 ₹3,99,700 | 3,700 ₹2,11,270 Lowest | 9,000 ₹5,13,900 | 6,000 ₹3,42,600 |
| 7.00 | Providing and laying in position specified grade of reinforced cement concrete includingcuring Carriage of materials Mechanical & Mannual but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks uptoplinthlevel (M25) including all carriages and dewatering | 258 | Cum | 10,000 ₹25,80,000 | 8,000 ₹20,64,000 Lowest | 11,690 ₹30,16,020 | 8,500 ₹21,93,000 |
| 8.00 | Centering and shuttering including strutting, propping etc.and removal of form work for Foundations,Footings,Bases for Columns | 210 | Sq.M | 350 ₹73,500 | 29 ₹6,090 Lowest | 456 ₹95,760 | 600 ₹1,26,000 |
| 9.00 | Providing and fixing of earthing including earth resistivity including counterpoise whereever required. | 3 | Set | 5,000 ₹15,000 Lowest | 5,000 ₹15,000 Lowest | 12,111 ₹36,333 | 5,000 ₹15,000 Lowest |
| 10.00 | Providing and laying in position specified grade of reinforced Cement Concrete including curing , cost of Centering, shuttering, finishing Allworks upto plinth level (M15/M-20) including Excation, Steel, Shuttering etc for 5No Towers (D-Type Towers -3No. + C Type Towers-2NO.) (Complete Job) Steel Bars for this Item Shall be supplied Departmentally) | 218 | Cum | 9,000 ₹19,62,000 | 8,700 ₹18,96,600 | 10,200 ₹22,23,600 | 6,500 ₹14,17,000 Lowest |
Tender Value
₹2.2 Cr
EMD Value
₹4.4 L
Closing Date
27 Jan 2025, 4:00 pmClosed
Executive Engineer TLMD8 JKPTCL
PDD Complex Bemina Sgr
Laying of Tower Foundations for Multi Circuit Towers and Normal Towers, SITC of Tower Material,0.4 ACSR Conductor including Stringing for Termination of Existing 220kV DC waggora shareefabad line and wbztl through single corridor at Dangerpora Budgam
2025_PDD_269525_1
TLMD-VIII /TS/ 01 of 2025 Dated 03-01-2025
Open Tender
Electrical Works
Lump-sum
92 days
kashmir
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,000
CD A/C No. 0367010200000174
₹4.4 L
11 Mar 2025
3 Jan 2025
28 Jan 2025
4 Jan 2025
27 Jan 2025
7 Jan 2025
7 Jan 2025 - 24 Jan 2025
Amount
Earth Work excavation of foundation pits including all Labour, T&P, leads & lifts, stockpiling, making of working space, carriage, disposal of excaveted soil, backfilling including cost of borrowed good earth & dressing of surplus excavated earth and dewatering during excavation... All Kind Of Soil
Close timbering in trenches including strutting and shoring complete. Only forPartially Submerged and Fully Submerged Foundations…..Depth exceeding 1.5m but not exceeding 3m
Reinforcement for R.C.C. work including straightning, cutting,bending, placing in position and binding all complete bars (TMT) including all carriages(manual and mechanical)
Supply Of Stubs and cleats(as per drawing)
Stub setting including transportation, carriage of Stubs & Templates.
Providing and laying in position Cement Concrete of specified grade including curing ,Carriage of materials Mechanical & Mannual but excluding th cost of centring and shuttering.All workupto plinth level with…. 1:3:6 (1cement:3coarse sand:6 graded stone aggregate 40mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete includingcuring Carriage of materials Mechanical & Mannual but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks uptoplinthlevel (M25) including all carriages and dewatering
Centering and shuttering including strutting, propping etc.and removal of form work for Foundations,Footings,Bases for Columns
Providing and fixing of earthing including earth resistivity including counterpoise whereever required.
Providing and laying in position specified grade of reinforced Cement Concrete including curing , cost of Centering, shuttering, finishing Allworks upto plinth level (M15/M-20) including Excation, Steel, Shuttering etc for 5No Towers (D-Type Towers -3No. + C Type Towers-2NO.) (Complete Job) Steel Bars for this Item Shall be supplied Departmentally)
MATERIAL PART
Fabrication, Galvanisation and Supply of Lattice Type Steel Tower Structures
Tower Accessories
Danger Plates
Number Plates
Circuit Plates
Phase Plate
Anti Climbing Devices
Bird Guards
Galvanised Nuts & Bolts with Washers
Supply Of Line Material & Accessories
ACSR Zebra
Conductor Accosseries For ZEBRA
Mid Span Compression Joint
Vibration Dampers
Repair Sleeves
Earth Wire / OPGW Cable
Earth Wire / OPGW Accessories
Mid Span Compression Joint
Vibration Dampers
Tension Clamps with Flexible Cu Bonds for OPGW
Hardware Fittings Suitable For 0.4ASCR ( ZEBRA)
Single Tension Fittings
Insulators
120 KN EM Strength Porcelain Disc Insulators
ERECTION PART
Erection of various types of towers complete with Nuts & Bolts including, transportation to site, tag welding and application of Zinc Rich Paint
Erection of Tower Accessories
Danger Plates
Number Plates
Circuit Plates
Phase Plate
Anti Climbing Devices
Bird Guards
Laying & Stringing of ACSR ZEBRA conductor /Earth wire including installation of insulator strings, hardware fittings, arching horns, vibration dampers and other accessories including transportation to site and temporary anchoring of towers.(Including 1.5% sag)
Laying & Stringing of Earth Wire including installation of hardware clamps, vibration dampers and other accessories including transportation to site and temporary anchoring of towers..(Including 1.5% sag)
Testing & Commissioning of Transmission Line
TZ Engineering Works (BID ID -2319507)
WALI MOHD KUCHAY (BID ID -2319818)
M/s MIR ELECTRICAL (BID ID -2319394)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
sbd.pdf
Tender Documents • 1.62 MB
BOQ_832155.xls
BOQ • 0.30 MB
TS.pdf
Tender Documents • 2.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .