Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.1 LAccepted-AOC 6 290 MUTHA GOWDER LINE WELLINGTON BARRACKS THE NILGIRIS 643 231 | THE NILGIRIS | TAMIL NADU | 643231 | L1 | Accepted-AOC Being L1 Bidder | |
| 2 | L2₹50.4 L+₹4.7 L (10.3%)Rejected-Finance 10 324 17 BALAJI NAGAR ARUVANKADU COONOOR THE NILGIRIS TAMIL NADU 643202 | COONOOR | THE NILGIRIS | TAMIL NADU | 643202 | L2 | Rejected-Finance Being Not L1 Bidder | |
| 3 | L3₹50.8 L+₹5.1 L (11.1%)Rejected-Finance ASHOKA PARK PALLAVA PARK BVT INS VISHWAKARMA INDIAN NAVY OF GE ND VISAKHAPATNAM | L3 | Rejected-Finance Being Not L1 Bidder | |
| 4 | L4₹51.4 L+₹5.7 L (12.4%)Rejected-Finance 109 D ALLAI SALT COMPOUND OLD LAKSHMI THEATRE KRISHNAPURAM COONOOR 643102 THE NILGIRIS | COONOOR | THE NILGIRIS | TAMIL NADU | 643102 | L4 | Rejected-Finance Being Not L1 Bidder | |
| 5 | L5₹51.6 L+₹5.9 L (12.9%)Rejected-Finance H NO 111 553 64 CATTLE POUND TOWARDS AVA HILL CAMP ROAD ARUVANKADU NILGIRIS DIST TAMIL NADU 643 202 | THE NILGIRIS | TAMIL NADU | 643202 | L5 | Rejected-Finance Being Not L1 Bidder |
| Sl No | Description | Qty | Unit | M SUNDARARAJAN L2 | sree devi construction L5 | N SARAVANAN L9 | AR Mohamed Yakub and Co L8 | K.AYYAPPAN L4 | GMS Builders L7 | SREE PARABRAHMA CONSTRUCTION L1 | ACE PROMOTERS L6 | SREE CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of Brickwork , built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stone work and precast concrete articles all as specified and as directed. | 99 | Cum | 770 ₹76,230 | 800 ₹79,200 | 800 ₹79,200 | 700 ₹69,300 | 655 ₹64,845 | 901 ₹89,199 | 600 ₹59,400 Lowest | 1,010 ₹99,990 | 600 ₹59,400 Lowest |
| 2.00 | Demolition of un-reinforced cement concrete in ground floors not exceeding 15 cm thickness including floor finish complete all as specified and as directed. | 58.23 | Cum | 950 ₹55,318.5 | 990 ₹57,647.7 | 990 ₹57,647.7 | 950 ₹55,318.5 | 895 ₹52,115.85 | 1,000 ₹58,230 | 600 ₹34,938 Lowest | 1,100 ₹64,053 | 800 ₹46,584 |
| 3.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in hard/dense soil complete all as specified and directed. | 42.6 | Cum | 725 ₹30,885 | 920 ₹39,192 | 800 ₹34,080 | 725 ₹30,885 | 675 ₹28,755 | 852 ₹36,295.2 | 450 ₹19,170 | 820 ₹34,932 | 290 ₹12,354 Lowest |
| 4.00 | All as per item no.3 above but for each additional 1.5m or part thereof in depth beyond the first 1.5 m complete all as specified and directed. | 8.52 | Cum | 860 ₹7,327.2 | 999 ₹8,511.48 | 1,100 ₹9,372 | 9,000 ₹76,680 | 500 ₹4,260 | 1,000 ₹8,520 | 500 ₹4,260 | 9,100 ₹77,532 | 320 ₹2,726.4 Lowest |
| 5.00 | Excavating over areas, n.exc 1.5 m deep and getting out in hard/dense soil complete all as specified and directed. | 96.23 | Cum | 590 ₹56,775.7 | 650 ₹62,549.5 | 700 ₹67,361 | 650 ₹62,549.5 | 550 ₹52,926.5 | 650 ₹62,549.5 | 450 ₹43,303.5 | 550 ₹52,926.5 | 390 ₹37,529.7 Lowest |
| 6.00 | Surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out hard dense soil complete all as specified and directed. | 150.6 | sqm | 68 ₹10,240.8 | 77 ₹11,596.2 | 100 ₹15,060 | 65 ₹9,789 | 85 ₹12,801 | 102 ₹15,361.2 | 40 ₹6,024 Lowest | 63 ₹9,487.8 | 90 ₹13,554 |
| 7.00 | All as per item no.6 above but for every 3 cm or part there of above or below 15 cm average depth complete all as specified and directed. | 60.24 | sqm | 32 ₹1,927.68 Lowest | 45 ₹2,710.8 | 51 ₹3,072.24 | 35 ₹2,108.4 | 35 ₹2,108.4 | 50 ₹3,012 | 40 ₹2,409.6 | 46 ₹2,771.04 | 100 ₹6,024 |
| 8.00 | Removing excavated soils exc. 250 m and n.exc.500 m depositing where directed at a level n. exc. 1.5 m above starting point all as specified and directed. . | 337.74 | Cum | 365 ₹1,23,275.1 | 490 ₹1,65,492.6 | 522 ₹1,76,300.28 | 400 ₹1,35,096 | 415 ₹1,40,162.1 | 500 ₹1,68,870 | 120 ₹40,528.8 Lowest | 460 ₹1,55,360.4 | 380 ₹1,28,341.2 |
| 9.00 | Cleaning of existing drain channel/pipe culverts including removal of vegetation i.e., bushes/shrubs along with piled up soil mud/musk beneath them throughout the length of drain beside to it and depositing in a low lying area exc 500m where directed complete all as specified.
Note : Soil volume will be measured at compacted state. | 120 | Cum | 590 ₹70,800 | 750 ₹90,000 | 757 ₹90,840 | 520 ₹62,400 | 595 ₹71,400 | 590 ₹70,800 | 400 ₹48,000 | 730 ₹87,600 | 360 ₹43,200 Lowest |
| 10.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and directed. | 20.45 | Cum | 140 ₹2,863 | 120 ₹2,454 | 183 ₹3,742.35 | 130 ₹2,658.5 | 125 ₹2,556.25 | 180 ₹3,681 | 80 ₹1,636 Lowest | 154 ₹3,149.3 | 120 ₹2,454 |
Tender Value
₹47.8 L
EMD Value
₹95,600
Closing Date
4 Jul 2026, 6:00 pmClosed
Shri Pawan Kumar Goswami, EE, GE DSSC
GE DSSC WELLINGTON
SPECIAL REPAIRS TO FOOTPATH KERB STONES, DRAINS FROM GORKHA HILL BLOCK NO 10 TO 18 33 TO 42 JUNCTION AT DSSC WELLINGTON
2026_MES_772147_1
8649/E8
Open Tender
Civil Works
Works
180 days
WELLINGTON
PLEASE REFER TENDER DOCUMENTS AND NIT
8 documents required · 8 mandatory
₹500
Yes
GE DSSC WELLINGTON
₹95,600
Yes
29 Jul 2026
13 Jun 2026
11 Jul 2026
13 Jun 2026
4 Jul 2026
27 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Brickwork , built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stone work and precast concrete articles all as specified and as directed. | 99 | Cum | - | - |
| 2 | Demolition of un-reinforced cement concrete in ground floors not exceeding 15 cm thickness including floor finish complete all as specified and as directed. | 58.23 | Cum | - | - |
| 3 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in hard/dense soil complete all as specified and directed. | 42.6 | Cum | - | - |
| 4 | All as per item no.3 above but for each additional 1.5m or part thereof in depth beyond the first 1.5 m complete all as specified and directed. | 8.52 | Cum | - | - |
| 5 | Excavating over areas, n.exc 1.5 m deep and getting out in hard/dense soil complete all as specified and directed. | 96.23 | Cum | - | - |
| 6 | Surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out hard dense soil complete all as specified and directed. | 150.6 | sqm | - | - |
| 7 | All as per item no.6 above but for every 3 cm or part there of above or below 15 cm average depth complete all as specified and directed. | 60.24 | sqm | - | - |
| 8 | Removing excavated soils exc. 250 m and n.exc.500 m depositing where directed at a level n. exc. 1.5 m above starting point all as specified and directed. . | 337.74 | Cum | - | - |
| 9 | Cleaning of existing drain channel/pipe culverts including removal of vegetation i.e., bushes/shrubs along with piled up soil mud/musk beneath them throughout the length of drain beside to it and depositing in a low lying area exc 500m where directed complete all as specified.
Note : Soil volume will be measured at compacted state. | 120 | Cum | - | - |
| 10 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and directed. | 20.45 | Cum | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
8649TENDER.pdf
Tender Documents • 1.03 MB
BOQ_864609.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .