Loading…
Loading…
Tender Value
₹7.0 L
EMD Value
₹13,960
Closing Date
10 Sept 2026, 4:00 pm
Executive Engineer Construction Leh
Executive Engineer Construction Leh
Improvement of edge wall along side in Kuzey Mangalchak road Bashakha Chochout Shamma under Maintenance
2026_PWD_19394_2
CDL 64 of Leh of 2025-26
Open Tender
Civil Works - Roads
Works
90 days
Leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Executive Engineer Construction Leh
₹13,960
20 Aug 2026
20 Aug 2026
11 Sept 2026
20 Aug 2026
10 Sept 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (no texceeding 1.5m in width or 10sqm on plan), including dressing of sides and ramming of bottoms, lift upto1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
a) All kinds of soil. | 3.9 | Cum | 208.42 | ₹812.84 |
| 2 | Dumping stone including cost of stones.
in Horizontal on level | 0.9 | Cum | 953.03 | ₹857.73 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 8 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA) | 0.6 | Cum | 5,725.33 | ₹3,435.2 |
| 4 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate
20mm nominal size) upto plinth level and curing complete with Cement mortar 1:6 (1 Cement : 6 coarse sand) | 5.25 | Cum | 5,730.39 | ₹30,084.55 |
| 5 | Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil: | 9 | Cum | 689.8 | ₹6,208.2 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 82.8 | Cum | 6,606.08 | ₹5,46,983.42 |
| 7 | Carriage of Material from source to site by M.T including loading, unloading and complete Job.
a) Cement an average lead 20Km | 0.54 | MT | 342.06 | ₹184.71 |
| 8 | b) Sand an average lead of 10km | 1.96 | cum | 271.53 | ₹532.2 |
| 9 | c) Earth 2 Km | 9 | cum | 190.22 | ₹1,711.98 |
| 10 | d) Stone aggregate an average lead of 10km | 0.53 | cum | 271.53 | ₹143.91 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_46035.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].