| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC N A | FARIDABAD | HARYANA | 121004 | ₹1.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.9 CrRejected-Finance | ₹1.9 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Found Ineligible |
| 4 | Rejected-Technical UTTAR PRADESH UP | GHAZIPUR | UTTAR PRADESH | 232325 | - | - | Rejected-Technical Found Ineligible |
| 5 | Rejected-Technical | - | - | Rejected-Technical Found Ineligible |
| Sl No | Description | Qty | Unit | M/S RADHIKA CONSTRUCTION COMPANY L2 | RIYAZ AHMAD L1 |
|---|---|---|---|---|---|
| 1.00 | Earth Work in excavation for foundation in all type of soil with all lead & lift includind proper disposal of earth. | 5,482.31 | M3 | 90 ₹4.9 L | 98.68 ₹5.4 L |
| 2.00 | Providing & laying in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone grit 12 mm to 20mm nominal size) including cost of material, labour and T&P etc. required for proper completion of the work. | 610.1 | M3 | 6,140.5 ₹37.5 L | 5,481.87 ₹33.4 L |
| 3.00 | Supply, Laying and fixing 100mm CPVC Pipe | 1,294.4 | R.M. | 1,250 ₹16.2 L | 1,202.41 ₹15.6 L |
| 4.00 | Centering and shuttering for CC including all cost of shuttering material labour and T&P etc. required for proper completion of work. | 6,034.19 | M2 | 500 ₹30.2 L | 542.72 ₹32.7 L |
| 5.00 | Providing & laying in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone grit 6 mm to 12mm nominal size) including cost of material, labour and T&P etc. required for proper completion of the work. | 732.86 | M3 | 6,700 ₹49.1 L | 5,772.55 ₹42.3 L |
| 6.00 | Centering and shuttering for RCC work including rent of shuttering material labour and T&P etc. required for proper completion of work for slab, lintels, sunshades columns and wall etc. | 2,654.34 | M2 | 790 ₹21.0 L | 680.86 ₹18.1 L |
| 7.00 | Providing & laying in R.C.C 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone grit 6 mm to 12mm nominal size) including cost of material, labour and T&P etc, required for proper completion of the work. | 358.06 | M3 | 7,200 ₹25.8 L | 6,193.49 ₹22.2 L |
| 8.00 | Mild steel or iron work such as reinforced concrete or reinforced brick work (when not including in overall rates) wrough to requiredshape as necessary including bending, binding, cutting and placing in position reinforcement including all cost of binding wire & supplied all steel and wastage overlapping & hooks | 3.98 | M.T. | 84,000 ₹3.3 L | 77,401.45 ₹3.1 L |
Tender Value
Refer Docs
EMD Value
₹4.2 L
Closing Date
13 Mar 2026, 10:00 amClosed
Superintending Engineer
Office of Superintending Engineer, VII Circle Irrigation Works, Sarojni Naidu Marg, Lucknow.
AS PER TENDER NOTICE-06 LOT-11
2026_UPIDC_1122306_11
06/SE-VII/2025-26
Open Tender
Civil Works - Canal
270 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,102
₹4.2 L
Lucknow
15 Apr 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
7 Mar 2026
Earth Work in excavation for foundation in all type of soil with all lead & lift includind proper disposal of earth.
Providing & laying in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone grit 12 mm to 20mm nominal size) including cost of material, labour and T&P etc. required for proper completion of the work.
Supply, Laying and fixing 100mm CPVC Pipe
Centering and shuttering for CC including all cost of shuttering material labour and T&P etc. required for proper completion of work.
Providing & laying in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone grit 6 mm to 12mm nominal size) including cost of material, labour and T&P etc. required for proper completion of the work.
Centering and shuttering for RCC work including rent of shuttering material labour and T&P etc. required for proper completion of work for slab, lintels, sunshades columns and wall etc.
Providing & laying in R.C.C 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone grit 6 mm to 12mm nominal size) including cost of material, labour and T&P etc, required for proper completion of the work.
Mild steel or iron work such as reinforced concrete or reinforced brick work (when not including in overall rates) wrough to requiredshape as necessary including bending, binding, cutting and placing in position reinforcement including all cost of binding wire & supplied all steel and wastage overlapping & hooks
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_2089786.pdf
techsummary_2089786.pdf
finance_2089786.pdf
BOQ Comparative Chart
xlsx
finsummary_2089786.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_2089786.xls
BOQ • 0.34 MB
BID06LOT11.pdf
Tender Documents • 1.76 MB
Download all tender documents and submit your bid