Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAdmitted-Finance | ₹5.4 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHRI PACHAIYAMMAN CONSTRUCTION L1 |
|---|---|---|---|---|
| 1.02 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation | 13.64 | Cum | 351 ₹4,787.64 Lowest |
| 1.03 | Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the TWAD Board Officers. | 3.26 | Cum | 4,056 ₹13,222.56 Lowest |
| 1.04 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | 12.46 | Cum | 702 ₹8,746.92 Lowest |
| 1.05 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | 15.64 | Cum | 702 ₹10,979.28 Lowest |
| 1.06 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 3.24 | Cum | 6,500 ₹21,060 Lowest |
| 1.07 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 7.08 | Cum | 6,300 ₹44,604 Lowest |
| 1.08 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 2.45 | Cum | 6,630 ₹16,243.5 Lowest |
| 1.09 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 5.06 | Cum | 6,630 ₹33,547.8 Lowest |
| 1.10 | Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete. | 0.51 | Cum | 68,500 ₹34,592.5 Lowest |
| 1.11 | Refilling and supply of gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 5.11 | Cum | 550 ₹2,810.5 Lowest |
Tender Value
Refer Docs
EMD Value
₹6,900
Closing Date
22 Sept 2026, 3:00 pmClosed
BLOCKDEVELOPMENTOFFICEVPTS
BLOCKDEVELOPMENTOFFICEVPTS
Construction of Mini CSC Girls Type-3 at PUES Mel kariyamangalam Habitation in Kariyamangalam panchayat Chengam Block Under village Panchayat General fund 2026-2027
2026_RDTN_699104_1
Roc.No.A10 2553 2026 01.08.2026
Open Tender
Civil Works - Buildings
Lump-sum
60 days
Chengam
PLEASE REFER THE TENDER DOUMENTS
2 documents required · 2 mandatory
₹0
₹6,900
22 Sept 2026
28 Aug 2026
22 Sept 2026
28 Aug 2026
22 Sept 2026
28 Aug 2026
28 Aug 2026 - 22 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.02 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation | - | Cum | - | - |
| 1.03 | Plain Cement Concrete 1:4:8 (one cement, four sand and eight hard granite broken stone of 40mm size ISS gauge) for foundation and footing including mixing, placing, ramming ,finishing curing etc. complete in accordance with standard specification and as directed by the TWAD Board Officers. | 1 | Cum | - | - |
| 1.04 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | - | Cum | - | - |
| 1.05 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | - | Cum | - | - |
| 1.06 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | - | Cum | - | - |
| 1.07 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | - | Cum | - | - |
| 1.08 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | - | Cum | - | - |
| 1.09 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 1 | Cum | - | - |
| 1.1 | Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete. | 1 | Cum | - | - |
| 1.11 | Refilling and supply of gravel from approved quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_840422.xls
BOQ • 0.30 MB
TENDERDOUEMENT.pdf
Tender Documents • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .