| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 CrAccepted-AOC | ₹16.0 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹17.2 Cr+₹1.2 Cr (7.75%)Rejected-Finance NA | ₹17.2 Cr+₹1.2 Cr (7.75%) | L2 | Rejected-Finance Rejected |
| 3 | Rejected-Technical GREEN AVENUE COLLEGE ROAD ABOHAR FAZILKA PUNJAB 152116 | FAZILKA | PUNJAB | 152116 | - | - | Rejected-Technical NON RESPONSIVE BIDDER |
| 4 | Rejected-Technical R O ARNAS TEHSIL DISTT REASI | REASI | JAMMU AND KASHMIR | 182301 | - | - | Rejected-Technical NON RESPONSIVE BIDDER |
Tender Value
₹20.0 Cr
EMD Value
₹40.0 L
Closing Date
25 Aug 2025, 5:00 pmClosed
Chief Engineer PMGSY (JKRRDA) Jammu
Office of The Chief Engineer PMGSY(JKRRDA) Jammu at 1st Floor, Mechanical Engineering Department (MED) Complex University Road
Construction and Maintenance of Road from L065-(Link Road) Sunchan Nallah to Chan Phase II PWD Road to Bhallar, Package No. JK20-4206, PMGSY-IV, Batch-I of 2025-26, Block-Thuroo, District Reasi (Using Waste Plastic) Length-8.300 Kms
2025_JKRRD_143654_1
JK204206
Open Tender
Civil Works - Roads
Percentage
540 days
Thuroo
Please refer Tender documents.
8 documents required · 8 mandatory
₹20,000
₹40.0 L
Office of The Chief Engineer PMGSY (JKRRDA) Jammu
9 May 2026
4 Aug 2025
27 Aug 2025
4 Aug 2025
25 Aug 2025
6 Aug 2025
5 Aug 2025 - 6 Aug 2025
5 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in all kinds of soil, Soft Rock & Hard Rock by mechanical means including cutting and trimming of side slopes & disposing of Excavated earth with a lift of 1.50 mtr and lead as directed for safe disposal of un-serviceable/surplus excavated material without damaging private/public property As per Technical specification clause 1603.1. and 1603.2 | 1,51,924.31 | Cum | 222.42 | ₹3,37,91,005.03 |
| 2 | Construction of embankment with approved material deposited at site fromroadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 | 12,565 | Cum | 77.14 | ₹9,69,264.1 |
| 3 | Earthwork in excavation for structures as per drawings and Technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposing of surplus, un-serviceable Excavated earth as directed at site for safe disposal of same without damaging private/public property, dressing of sides, bottom and backfilling in trenches with excavated suitable material including de watering if required. | 9,836.17 | Cum | 605.45 | ₹59,55,309.13 |
| 4 | Providing and laying of plain cement concrete of Grade M-10 in open foundations complete as per drawings and Technical specifications. Clause 802, 803, 1202 & 1203. including all leads, lifts and carriages of materials by MT complete. | 719.38 | Cum | 5,820.56 | ₹41,87,194.45 |
| 5 | Providing and laying of plain cement concrete of Grade M-15 in open foundation complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202 & 1204. Including cost of curing, form work, all leads and lifts and carriages of materials by MT complete. | 624.27 | Cum | 5,950.18 | ₹37,14,518.87 |
| 6 | Providing and laying of plain cement concrete of Grade M-15 in substructure complete as per drawings & Technical specification Clauses 802, 804, 805, 806, 807, 1202 & 1204. Including cost of curing, form work, all leads and lifts and carriages of materials by MT complete. | 803.64 | Cum | 6,350.52 | ₹51,03,531.89 |
| 7 | Providing and laying of plain Cement concrete of Grade M-20 in open foundation complete as per drawings & Technical specification Clauses 802, 804, 805,806, 807, 1202 & 1204. Including cost of curing , form work , all leads and lifts and carriages of materials by MT complete. | 105.23 | Cum | 6,514.14 | ₹6,85,482.95 |
| 8 | Providing and laying of plain Cement concrete of Grade M-20 in Sub-Structure complete as per drawings & Technical specification Clauses 802, 804, 805,806, 807, 1202 & 1204. Including cost of curing , form work , all leads and lifts and carriages of materials by MT complete. | 57.81 | Cum | 6,955.82 | ₹4,02,115.95 |
| 9 | Providing and laying of reinforced cement concrete of Grade M-25 in super structure as per drawings & Technical specification Clauses 800, 1205.4 and 1205.5, excluding reinforcement but including curing , cost of form work , all leads and lifts and carriages of materials by MT complete. | 30.63 | Cum | 8,098.95 | ₹2,48,070.84 |
| 10 | Supplying , fitting and placing of HYSD bar reinforcement (Fe415) for RCC work in Super Structure including bending, binding complete as per drawings & Technical specification Clauses 1002, 1010 and 1202 , including cost of binding wire, all leads , lifts, handling & re-handling and carriages of materials by mechanical transport complete. | 3.08 | MT | 93,841.57 | ₹2,89,032.04 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 9.23 MB
BOQ_222863.xls
BOQ • 0.26 MB
23sunchannallahtochan.pdf
Tender Documents • 1.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .