Loading…
Loading…
1,73,828 live81,526 closing this weekmost from Department Of Military Affairs and Zilla Parishad
1,73,828 results • Latest
Advance Work (Including Seedlings Raising) at Bidare Sy.No. 174 of Muthodi Range. Ext-50.00 Ha
Advance Work (Including Seedlings Raising) at Beekanahalli Kaval Sy.No. 39 of Chikkamagaluru Range. Ext-25.00 Ha
Advance Work (Including Seedlings Raising) at Saragodu R.F. Kunduru Sy.No. 235 of Aldur Range. Ext-25.00 Ha
Development of Hindu Graveyard in Prabhupada layout of ward 228, Serilingampally, Circle-49, Slp Zone, CMC (RESERVED FOR STs only) (Item 6)
1ST YEAR MAINTENANCE OF 5 KM CENTRAL MEDIAN ON NH-163 OUTER PASS FROM CHAINAGE FROM 122.700 KM TO 127.965KM) KM FROM KARUNAPURAM FLYOVER TO RAMPUR TEXTILE PARK OF HANUMAKONDA DURING 2026-27- Nov 26026 to Oct -2027
Package No-29 Design, Build, Operate and Transfer (DBOT) of Interception and Diversion works in Birur, Sringeri and Koppa ULBs of Chikkamagaluru District and Belur ULB of Hassan District with 5 years operation and maintenance (including 2 years Defect Liability Period) under Swachh Bharat Mission (Urban) 2.0 fund
Package No-08 Design, Build, Operate and Transfer (DBOT) of Interception and Diversion works in Gokak, Ramdurg & Yaragatti ULBs of Belagavi District with 5 years operation and maintenance(including 2 year Defect liability period) under Swachh Bharat Mission (Urban)2.0 fund
Package No-04 Design, Build, Operate and Transfer (DBOT) of Interception and Diversion works in Athani, Raibagh, Arabhavi, Mudalgi & Kalloli ULBs of Belagavi District with 5 years operation and maintenance(including 2 year Defect liability period) under Swachh Bharat Mission (Urban)2.0 fund
Package No-30 Design, Build, Operate and Transfer (DBOT) of Interception and Diversion works in Bellur, Krishnarajpet & Shrirangapattana ULBs of Mandya District with 5 years operation and maintenance(including 2 year Defect liability period) under Swachh Bharat Mission (Urban)2.0 fund
Package No-32 Design, Build, Operate and Transfer (DBOT) of Interception and Diversion works in Bogadi, Rammanahalli, Periyapatna, Krishnarajanagara & Heggadadevankote ULBs of Mysuru District, Madikeri & Virajpet ULBs of Kodagu District with 5 years operation and maintenance(including 2 year Defect liability period) under Swachh Bharat Mission (Urban)2.0 fund
BT to R/f KV Banjara Main Road to Repallewada-Jagannadha thanda road including bridge of Raghunadhapalem Mandal, Khammam District. Est Cost Rs. 250.00 Lakhs
BT to R/f GK Banjara to Bandipadu including construction of Bridge of Raghunadhapalem Mandal, Khammam District. Est Cost Rs. 320.00 Lakhs
175 nos of Battery Operated LED based flashing Tail Lamps
BT to R/f Dhamsalapuram to Allipuram NTR statue of Raghunadhapalem Mandal, Khammam District. Est Cost Rs. 350.00 Lakhs
BT to R/f Kothagudem to Dhamsalapuram MI Tank of Raghunadhapalem Mandal, Khammam District. Est Cost Rs. 220.00 Lakhs
Construction of Additional Accommodation and Compound Wall to Government Degree College at Sabbavaram, Anakapalli District. Estimated Cost Rs.336.00 Lakhs
Replacement of Grinding Rolls, Bull Ring Segments & badly worn out parts, full welding and hard facing of the XRP -1003 Bowl Mill parts for 7 Mills for a period of 6 months from 01.10.2026 or from actual date of commencement of work to 31.03.2027
Construction of different roads (Two roads) of Bhachau and Rapar Taluka Package No. KCH/MMGSY/Non Plan/Normal/ 2025-26/P-2(4th attempt)
Providing Desktops (Computers) and Printer with scanners for Returning Officers (ROs) for Local Body Elections 2026 in Zonal Office, Aganampudi Zone of GVMC
A &A to E.I. & Compound Light of Taluka Court Building Campus At Dabhoi, Dist. Vadodara
Renovation & Repair EI & Compound Light of Taluka Court Building Campus At Sinor, Dist. Vadodara
Renovation & Repair EI & Compound Light of Taluka Court Building Campus At Desar, Dist. Vadodara
A &A to E.I. & Compound Light of Taluka Court Building Campus At Savli Dist. Vadodara
Re-Costruction of internal boundary wall behind sugar factory to girls hostel at NSI campus, Kanpur (SH : Balance Work)
S&I OF 25 KVA DISTRIBUTION TRANSFORMER AT HIGHWAY PETROLEUM AD-HOC MANDSAUR
Construction of 03 nos. G plus 5 Double Occupancy Hostels at IIM Sambalpur, Odisha Under Phase-II
BT to R/f Balapeta to Ballepalli Smashanavatika Road via Rayala cheruvu of Raghunadhapalem Mandal, Khammam District. Est Cost Rs. 250.00 Lakhs
BT to R/F Gollagudam to Puttkota, Raghunadhapalem Mandal, Khammam District. Est Cost Rs. 240.00 Lakhs
BT to R/f Khammam DIET College to R and B Eenadu-By pass Road of Raghunadhapalem Mandal, Khammam District. Est Cost Rs. 210.00 Lakhs
BT to R/F Koyachelaka SC Colony to Raghunadhapalem Kasturibha School via Konda Reddy Cheruvu of Raghunadhapalem (M), Khammam District. Est Cost Rs. 250.00 Lakhs
CONSTRUCTION OF NANDRA NANA -1 STORAGE TANK AT VILLAGE-NANDRA NANA TA.ABDASA DIS.KACHCHH
CONSTRUCTION OF VAGHAPADHAR-2 STORAGE TANK AT VILLAGE- VAGHAPADHAR TA.ABDASA DIS.KACHCHH
CONSTRUCTION OF KHIRSARA VINJAN-1 STORAGE TANK AT VILLAGE- KHIRSARA(VI) TA.-ABDASA DIS.KACHCHH
CONSTRUCTION OF VAGHAPADHAR-3 STORAGE TANK AT VILLAGE- VAGHAPADHAR TA.ABDASA DIS.KACHCHH
CONSTRUCTION OF CHIYASAR-1 STORAGE TANK AT VILLAGE- CHIYASAR TA. ABDASA DIS. KACHCHH
CONSTRUCTION OF VAGHAPADHAR-1 STORAGE TANK AT VILLAGE- VAGHAPADHAR TA.ABDASA DIS.KACHCHH
INFRSTRUCUTRE FACILITIES TO TAKE UP VARIOUS WORKS FOR THE PROPOSED TELANGANA PUBLIC SCHOOLS (TGPS) FOR IMPROVING LEARNING OUTCOMES FROM PRE-PRIMARY (PP) TO CLASS XII AT ZPHS ADDAGUDURU, ADDAGUDURU (M) SURYAPET DISTRICT
Replacement of damage false ceiling at Proch, corridor and rooms in office building at NSI, Kanpur.
Barwala UGD-II under SJMMSVY : Working Survey, Soil Investigation, Design & Construction, Testing & Commissioning, Underground Drainage Project with 3.00 MLD Sewerage Treatment Plant Work Including Providing, Supplying, Lowering, Laying and Jointing Raising main and Gravity Main Pipeline Network, Providing House Connection, Property Connection, Road Restoration, Pumping Machinery, Pumping Station with Operation & Maintenance with All Allied Works for 02-[Two] Years and 07-[Seven] Years for STP Including 03-[Three] Years Defect Liability Period Including 03-[Three] Years Defect Liability Period for Barwala Nagarpalika Under Ground Drainage Phase-II Project, Taluka: - Barwala & District: - Botad, Gujarat” Under SJMMSVY
Construction of Category GH-Type-4 Towers (224 Quarters) and Category GH -1 Type-3 Blocks (84 Quarters) in Various Sectors of Gandhinagar.
PROCUREMENT OF 2B DRESSING SKIN MEDICINE
Construction of Compound wal at APHB park-3 in Sriramnagar ward 229, Serilingampally Circle-49, Slp Zone, CMC ( Reserved for Waddera / sagaras only) (item 10)
ARC Work for maintenance of distribution transformers center at various locations to reduce transformer failure & for providing quality power supply under SI scheme as a part of preventive maintenance for All sub divisions under Pandesara Division.
Renovation of residential quarters and replacing of conventional lights and fans with new energy efficient fans and LED light fittings in Type I II and III Type II new and old quarters Type F G and H qtrs at JIPMER Puducherry SH Providing cables for F type quarters and Spandan area Providing LED light fittings and UPS for Auditorium