Loading…
Loading…
5,989 results • Best match
Electrical repair and renovation of existing portion of Medical unit And electrification of proposed extended portion of Medical Unit
Ammonium Molybdate Mo 52 percent Micronutrient
Construction of Compound Wall cum Fencing with concertina and construction of Counterfort at Backside of Students Canteen North Side of UBKV under UBKV Pundibari Cooch Behar
Rhizobium Culture Bio Fertiliser
Construction of Compound Wall cum Fencing with concertina and Height Escalation of Existing Boundary Wall and construction of Counterfort from Dharmabarer Kuthi Primary School to Sub-Station Southern Site of UBKV under UBKV Pundibari Cooch Behar
Construction of Compound Wall cum Fencing with concertina after dismantling of old Boundary Wall and construction of Counterfort from Main Gate to GDL High School West Side of UBKV under UBKV Pundibari Cooch Behar
Bare minimum maintenance work in the Students Hostel Teesta Hall UG Block only And International Students Hostel
Construction of Compound Wall cum Fencing with concertina from Angarkata Primary School at Vill Angarkata Eastern Side of UBKV under UBKV Pundibari Cooch Behar
Supply of Phosphate Solublising Microorganism PSM PSB Bio Fertiliser
Supply of Disodium Octaborate Tetrahydrate Boron 20 percent Micronutrient
Repair maintenance and Face Lifting of Vice Chancellors Residence and surrounding enclosed area under the possession of UBKV at Rail Ghumti Cooch Behar
Bare minimum maintenance work in the Horticulture Faculty Building External Work And Technology Faculty Building
Electrification at existing and proposed extended Staff and Student canteen
Supply and Installation of AC Points Power Points 10 KVA UPS Copper Earthing in the Pesticide Residue Laboratory including installation of HPLC system at RKVY Building under the project entitled Establishment of Pesticide Residue Laboratory at UBKV f
Supply of Carbendazim 25 percent plus Mancrozeb 50 percent WS
Construction of Compound Wall cum Fencing with concertina after dismantling of old Boundary Wall and construction of Counterfort at Back Side of Boys Hotel North Side of UBKV under UBKV Pundibari Cooch Behar
Electrical Remodelling and Renovation of U G Laboratory of Department of Seed Scirnce And Electrification of 2 nos teacher room of department of Seed Science and Technology
Bare minimum maintenance work in the Department of Pomology and Post Harvest Technology Faculty of Horticulture PG Class Room 1PG Class Room 2 PG Lab UG Lab New And Central UG Lab Faculty of Horticulture
Electrification of P.G. Class room I of Department of PPHT And Electrification of proposed P G Class room II of Department of PPHT And Electrification of proposed U G Lab of Department of Promolgy and Post-Harvest Technology And Electrification of U
Supply Installation Testing and Commissioning of 2 TR 13 nos and 1.5TR 12 no non-inverter split type A.C. machines of make HITACHI DAIKIN MITSUBISHI
Civil maintenance and upgradation of Canteen as extension And S P works for Civil maintenance and upgradation of Canteen And Civil maintenance and upgradation of existing Canteen At UBKV Pundibari Coochbehar
Construction of Compound Wall cum Fencing with concertina from RCC Culvert at Vill Angarkata Eastern Side of UBKV under UBKV Pundibari Cooch Behar
Inviting rate for Supply of Pesticides (Insecticides and Fungicide or their mixtures and Herbicides as IPM including Mechanical Control), and Micronutrients.
Infrastructure Development under the project entitled ESTABLISHMENT OF FARM MECHANIZATION WORKSHOP TESTING AND TRAINING CENTRE
Composite Work Furnishing Interior Electrical Work
Construction of Compound Wall cum Fencing with concertina adjacent to Angarkata Primary School Eastern Side of UBKV under UBKV Pundibari Cooch Behar
Supply of Pesticides (Insecticides and Fungicide or their mixtures and Herbicides as IPM including Mechanical Control), and Micronutrients
Supply and Installation of 25 liter capacity Storage Water Heater including Water Supply Line at different Hostels at UBKV Pundibari Cooch Behar Electrical Work
New construction of small hatch type steel barge at Chargopalpur major RLI scheme under Kaliganj development block under Bethuadahari (Agri-Electrical) Sub-Division
CONST OF PCC ROAD AT BELGRAM OF SATINANDI FROM BAGANBARI OF SK KALU TO AGRI LAND OF SK NASIR AT BELGRAM VILL 49113889
Construction of concrete road form end of agri land of akhil hazra of bhuri main road to bhuri uttar shasan under bhuri gp
Construction of Pucca drain from Sk Monsur hous to Agri Land of Sk Nurul Uddin at KPJ(U).ID No.-56916741 (Second Call)
Supply of Misc Items for Maintenance of different R.L.I. Schemes under Malda-III (A-M) Sub- Division within Malda-II (Agri-Mech) Division.
Rewinding and repairing of 3 phase 380-440 volt 1440 RPM 17.5/20 HP Electro Motor at Fulia (Agri-Mechanical) Workshop Sub Division
Contruction of Drain,Repairing of Septic Tank and Boundary Wall under Bankura(Agri- Mech) Workshop Sub- Division,Bankura of Financial Year 2023-24.
Development of Old Hostel Building at Netaji Subhas Training Institute of Agricultural Marketing at Baidyabati, District Hooghly
Upgradation of road from House of Biswajit Mandal to Indira of Saran Agricultural Field Tehatta-I Block
Roof treatment at the third floor of administrative building of Hooghly Zilla RMC under Agricultural Marketing Department.
Laying vitrified tiles at ground floor corridor and lobby, Faculty of Agricultural Engineering under B.C.K.V., Mohanpur, Nadia
Construction of Lock Gate for Agricultural Purpose on Ghorai Para Nasakhal (Amal Ghorai) at Nischintabasan Purba Palli
Construction of pucca drain from Raina II agricultural farm ishan dighi pond towards ahar vagar (Code-58678406)
Renovation Work of Office Canteen with Kitchen at Ground Floor of West Bengal State Agricultural Marketing Board
Construction of Jhora from Bikram house To Agricultural road Rangbull G.P. Within Jorebunglow Sukhiapokhri Panchayat Samity,Darjeeling.
Agro Residue Based Biomass Pellets (V2) (Q3) MSE Exemption for Turnover Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Time allowed for Technical Clarifications during technical evaluation 7 Days Bid Number : GEM/2025/B/6380137 Dated : 26-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 564611565 Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting Splitting Splitting Applied Yes, Maximum No. Of Bidders Amongst Which Order May Be Split 99 Split Criteria based on which quantity will be distributed Bucket filling method as per attached buyer added bid specific ATC. Reserved for Make In India products Reserved for Make In India products Yes MSE Purchase Preference MSE Purchase Preference Yes 2/6 1. If the bidder is a Micro or Small Enterprise (MSE) as per latest orders issued by Ministry of MSME, the bidder shall be exempted from the eligibility criteria of "Bidder Turnover" as defined above subject to meeting of quality and technical specifications. If the bidder itself is MSE OEM of the offered products, it would be exempted from the "
Agro Residue Based Biomass Pellets (V2) (Q3) MSE Exemption for Turnover Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Time allowed for Technical Clarifications during technical evaluation 7 Days Bid Number : GEM/2025/B/6380119 Dated : 26-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 549105270 Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting Splitting Splitting Applied Yes, Maximum No. Of Bidders Amongst Which Order May Be Split 99 Split Criteria based on which quantity will be distributed Bucket filling method as per attached buyer added bid specific ATC. Reserved for Make In India products Reserved for Make In India products Yes MSE Purchase Preference MSE Purchase Preference Yes 2/6 1. If the bidder is a Micro or Small Enterprise (MSE) as per latest orders issued by Ministry of MSME, the bidder shall be exempted from the eligibility criteria of "Bidder Turnover" as defined above subject to meeting of quality and technical specifications. If the bidder itself is MSE OEM of the offered products, it would be exempted from the "
Agro Residue Based Biomass Pellets (V2) (Q3) MSE Exemption for Turnover Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Time allowed for Technical Clarifications during technical evaluation 7 Days Bid Number : GEM/2025/B/6380146 Dated : 26-06-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 564611565 Evaluation Method Total value wise evaluation Financial Document Required Yes Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting Splitting Splitting Applied Yes, Maximum No. Of Bidders Amongst Which Order May Be Split 99 Split Criteria based on which quantity will be distributed Bucket filling method as per attached buyer added bid specific ATC. Reserved for Make In India products Reserved for Make In India products Yes MSE Purchase Preference MSE Purchase Preference Yes 2/6 1. If the bidder is a Micro or Small Enterprise (MSE) as per latest orders issued by Ministry of MSME, the bidder shall be exempted from the eligibility criteria of "Bidder Turnover" as defined above subject to meeting of quality and technical specifications. If the bidder itself is MSE OEM of the offered products, it would be exempted from the "
Repairing and Renovation of room no. 112 Installation of Glass door at Power House panel room, Repairing of temporary shed in residential quarter central store room, fixing of sliding aluminium shutter in Agriculture Engineering Section and polishing to the existing seating arrangement of Lecture Hall at ICAR-CRIJAF, Barrackpore, Kolkata
Collection of Mango fruits from the Mango Orchards of Mondouri Horticultural Farm, under Faculty of Horticultrue, Bidhan Chandra Krishi Viswavidyalaya for two fruiting seasons
CONSTRUCTION OF 100 MT CAPACITY R.K.V.Y GODOWN AND OFFICE WITH SANITARY AND PLUMBING AND WATER SUPPLY ARRAGEMENT OF RAMKRISHNAPUR SAMABAY KRISHI UNNAYAN SAMITY LIMITED.
Construction of Shed No. 01 for Rice processing unit under Bidhan Chandra Krishi Viswavidyalaya at Ranaghat Krishak Bazar of Nadia Zilla Regulated Market Committee