Loading…
Loading…
2,532 results • Best match
Oneiric Cooling Only 1.5 Ton Green AC 5 Star (ISEER value Not less than, Oneiric Cooling Only 1.5 Ton Green AC 5 Star (ISEER value Not less than 5.33) Inverter AC - Variable Speed Wall Mount Split AC
REPAIR AND MAINT OF INTERNAL ELECTRIC SYSTEM WITH FANS GEYSER AND ALLIED WORKS AT AFS ARJANGARH / REPAIR/ MAINT OF COOLING/ HEATING APPLICANCES SUCH AS SPLIT/WINDOW AC WATER COOLER DESERT COOLER AT AIR FORCE STATION NARELA UNDER GE (AF) GURGAONTHER
Provision of 2 Nos 86 Touch Screen Panel with OPS PTZ2X USB Camera 2 Nos. Digital Podium Speakers, Amplifiers, 5 KVA Online UPS for backup of Power, Wireless Microphones Split AC Units Water Cooler with RO and other allied accessories has be
Replacement of Air Conditioners in Judicial Court Complex at Mohindergarh District Narnaul
Construction of ADR Centre at Rewari District (Pdg. Additional Air Conditioners only)
BLUE STAR Cooling Only 2 Ton 2 Star (ISEER value from 3.5 to 3.79) Non-, BLUE STAR Cooling Only 2 Ton 2 Star (ISEER value from 3.5 to 3.79) Non-Inverter AC - Fixed Speed Wall Mount Split AC
1. RMO 1X200 KVA, 1X75 KVA & 1X50 KVA DG Sets at GSI Building NH- V Faridabad. 2. MOEI and Fans, Sub-stn., DG Set, P/Set at CGWB, NH-IV , Faridabad.(SH:- SITC of Window and Split AC.)
Solid drawn seamless copper tube of size 1/4 inch dia. with minimum 22 SWG, wall thickness suitable for R 32 and R 410A and R22 & soft annealed copper installation of split AC and to be supplied coil
Custom Bid for Services - Job Contract for Electrical Maintenance of Residential Non Residential buildings Admin Building etc and service cum maintenance of air conditioner water cooler RO fridge deep freezer etc Similar Category Repair, Maintenance and Installation of Plant Systems/Equipments
PROVN OF STANDBY POWER SUPPLY TO RANDOM, AIR CONDITIONING FOR 24X7 MONITORING SYSTEM CLP SECTION OF DG CONTROL PANEL, OUTDOOR POWER PANEL NEAR RANDOM AND EARTHING OF WATCH TOWER EQUIPMENT AT AF STN INDUAR UNDER AGE E/M RAJOKRI UNDER GE (AF) GURGAON
Operation Maintenance of Heating, Ventilation and Air Conditioning (HVAC) services
Title1, Title2, Title3, Title4, Title5, Title6, Title7, Title8, Title9, Title10
REPAIR/MAINTENANCE OF COOLING/HEATING APPLIANCES SUCH AS SPLIT/WINDOW AC WATER COOLER DESERT COOLER AT AF STATION RAJOKRI AND REPAIR/MAINTENANCE OF EXTERNAL WATER SUPPLY SYSTEMS PIPE LINES PUMPS OH TANKS UG SUMP AT AF STN RAJOKRI UNDER GE (AF) GURGAO
Repairing of defective Air Conditioners installed in HSVP office Building Sector-12 Faridabad.
Providing and fixing of 13 nos. window type 5 star inverter air-conditioner having capacity of 1.5 ton alongwith 13 nos. 4 KVA automatic voltage stabilizer for installation on 2nd floor of International Students Hostel, in MDU, Rohtak
2 Ton Air Conditioner, Wire 2 Core 4 Sqm, Stabilizer 2KVA, Stand Air Conditioner, SS Sitting Chair, Gym Mat 2X2, Insulation Tape
Renovation of multipurpose hall at Bal Bhawan in Distt. Rewari (Pdg. Air Conditioners only).
COMPREHENSIVE MAINT OF HVAC INCLUDING VRF PAC WATER CHILLER AND OTHER ALLIED WORKS AT NCN COMPREHENSIVE MAINT OF (3X55 TR AND 3 X 25 TR) AC PLANT AND OTHER ALLIED WORKS AT 2003 STN AND REPAIR/MAINTENANCE OF DESERT COOLER WATER COOLER SPLIT/WINDOW AC
computer table, spilt Air conditioner BOQ Title BOQ BOQ
Pdg. ERD for 4 No Lifts, Extension Expansion of Expansion of Electric Sub Station and Air Conditioner for Conference Hall in the Campus of Mini Sectt., Distt Sonipat.(pdg. 500 KVA Transformer, 400 KVA DG Set and Cabling work only). Recall
Custom Bid for Services - supply and fixing for provn of 2X Split AC (2 TonCapacity) in Computer Room and Water Cooler 01 No in newly raised Sub DivnAGE B/R Project at Chandimandir Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
Operation Maintenance of Heating, Ventilation and Air Conditioning (HVAC) services Hospital Block
Supply, installation, testing & commissioning of VRV Air- conditioning system including dismantling (Q3)
REPAIR OF WINDOW/SPLIT AC INSTALLED AT CH (WC) CHM
Pdg Split AC, Batteries, EI work Fan and fitting etc
CMC and operation of 190 TR X 3 Water cooled Screw type Central AC Plant and Rate contract for maintenance and repair of AC Water Cooler Refrigerators Dfreeze for three year
COMPREHENSIVE MAINT OF HVAC INCL VRV PAC WATER CHILLER AND UPS AT NCN REPAIR MAINT OF SPLIT WINDOW AC COOLING APPLIANCES PAC AC PLANT 3 X 7.5 TR CAPACITY AND OTHER ALLIED WKS AND REPAIR OF SOLAR WATER HEATERS AND FIRE FITTING SYSTEM AT AFSSR UNDER GE
Providing and fixing of 02 Nos. split type 5 star inverter air-conditioner of the capacity of 02 ton in MDU, Rohtak alongwith 5 KVA voltage stabilizer (copper) and 02 Nos. M.S. stands for outdoor units for committee room, ACIL, MDU, Rohtak
Supply, Installation, Testing & Commissioning of VRF Cassette Type Air Conditioning System at Instit
Work for providing air conditioning in newly constructed Kiosks at 220KV Substation, Mohana
MOEI AND FANS S/STN CLIGHT IN RESIDENTIAL AND NON RESIDENTIAL BUILDING RMO PUMP SET 3X110 TRAC PLANT AFA SYSTEM SWH SYSTEM AUDIO AND VIDEO AIDS AND STAGE LIGHTING AT NACIN COMPLEX SEC-29 FARIDABAD (SH: SERVICING ANDOVERHAULING OF WINDOW AND SPLIT AC AS REQD
Skipping Rope, 10 KG Dumbell, 12.5 KG Dumbell, Split AC, Stand
Shifting of existing Split Ac outdoor unit of Municipal Corporation, Hisar
automatic line voltage corrector or step type auto transformer (Q3), Hot and Cold Air Conditioners (Q3)
CWE/CHM(U)-140/2025-26 REPAIR AND MAINT OF CENTRAL AIR CONDITIONING SYSTEM OF CAPACITY 5 X 225 TR, 2 X 48 TR AND 3 X 50 TR INCLUDING LT PANELS, LT CABLES, HEATING SYSTEM, AHUs, FCUs AND DUCTINGS INCLUDING ALL CONNECTED ITEMS AT COMMAND HOSPITAL (WC)
Maintenance of Window, Split, Packaged Air conditioner and Air Handling Unit
Supply of installation of Air Conditioner in Horticulture Division HSVP Gurugram
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
PROVN OF CENTRAL AIR CONDITIONING OF LRC/URP IGLOO BUILDING AT AF STN AMBALA
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - AC Service
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System