Loading…
Loading…
2,248 results • Best match
REPAIR SERVICING AND MAINTENANCE OF HEATING SYSTEM OF 66 TR PACKAGED AIR CONDITIONING UNITS FOR MACHINE NO. 01,02,03 AND 04 IN WARD NO. 18 OF GOVT. SMGS HOSPITAL, JAMMU.
SITC of Air conditioning Units/ VRV/ VRF system in various Labs/ Dialysis Centre, Top Floor of New Psychiatry Block and various wards and sections of SKIMS MCH Bemina Srinagar
Unitary Air Conditioner (Window AC) (V3) ISI Marked to IS 1391 (Part 1) (Q2) (3 (3 ))
Unitary Air Conditioner (Window AC) (V3) ISI Marked to IS 1391 (Part 1) (Q2) ( ( 3 3 ))
Unitary Air Conditioner (Window AC) (V3) ISI Marked to IS 1391 (Part 1) (Q2) (3 (3 ))
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6714941 Dated : 22-09-2025 Bid Document 1/6 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2), Automatic Line Voltage Correctors (Step Type) for Domestic Use - IS - 8448 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and ... category Split Air Conditioner Including ...
Wall Bracket For Split Ac, Wall Bracket For Window Ac, Split Ac 1.5 Ton, Window Ac 1.5 Ton, MCB Swtich For Ac
Repair, maintenance and servicing of 28 Nos. Air conditioning units of Blood Bank area, Gynae OPD area, PPC section etc. of 1.52 TR capacity each at Govt. SMGS Hospital, Jammu.
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6372180 Dated : 23-06-2025 Bid Document 1/7 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
1.5 Ton Split AC, 1 Ton Window AC, Stabilizer
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6339133 Dated : 12-06-2025 Bid Document 1/6 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Providing and fixing of 1.50 tone energy efficient whirlpool make inverter split air conditioner including providing and fitting of voltage stabilizer at division Office cum computer room.
Repairing providing and fixing of aluminium cladding over the duct of VRV system installed in CHC Sumbal and SITC of hi wall mounted split type hot and cold Air conditioning units
Repair Maintenance and Servicing of 22 Nos. Split and Window Air Conditioning Units of 1.5 TR 2 TR capacities installed at Medical Education Department and Department of Anatomy of GMC, Jammu
Supply installation testing and commissioning of hot and cold Inverter technology based high wall mounted Split Type Air Conditioning Units in IDB Covid 19 Clinic at various areas of SKIMS Soura
Shifting Reinstalling Repair Maintenance and Servicing of 15 Nos. old damaged 1.5 TR Window Air Conditioning Units from GMC Guest House to various locations of Government Medical College and Hospital Jammu.
VOLTAS AIR CONDITIONER HOT AND COLD 1.5 TON 3 STAR SPLIT., STABILIZER FOR 1.5 TON SPLIT AIR CONDITIONER., INSTALLATION OF AIR CONDITIONER ON SITE.
Unitary Air Conditioner (Window AC) (V2) as per IS 1391 (Part 1) (Q2), Automatic Line Voltage Correctors (Step Type) for Domestic Use - IS - 8448 (Q2)
Hot and Cold Air Conditioners (Q3), Tower Air Conditioner including Green AC (Q2)
REFRIGERANT PIPES OF33TR PACKAGED AIR CONDITIONING UNITS 24BY WAY OF SITC OF NEW REFRIGERANT PIPES IN PLACE OF STOLEN PIPES OF WARD NO. 18 ALONG WITH ALLIED WORKS GOVT. SMGS HOSPITAL, JAMMU.
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Past Performance 10 % Bid to RA enabled No ITC available to buyer Yes Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6368148 Dated : 20-06-2025 Bid Document 1/6 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6843159 Dated : 31-10-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6964575 Dated : 04-12-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Fitting of Air Conditioning System at Lan by way of replacement of existing ductable AC System (cooling only) retrieved from old CCU, at SKIMS Soura.
Hot and cold split AC 1.5 ton, Window AC 1.5 ton, Split AC 1.5 ton
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Relaxation for Years Of Experience Yes | Partial | Experience - 1 year (s) Startup Relaxation for Years Of Experience Yes | Partial | Experience - 1 year (s) Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6996345 Dated : 12-12-2025 Bid Document 1/6 Number of Auto Extension count 2 Past Performance 10 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/5867578 Dated : 25-01-2025 Bid Document 1/5 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2), Stabilizer, Double Pole MCB, Wire, Pre Insulated AC Copper Pipe, PVC Aluminium Cable
WINDOW AC 1.5 TON HEAVY DUTY COPPER, SPLIT AC 1.5 TON
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience Yes | Complete Startup Exemption for Years Of Experience Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6545439 Dated : 09-08-2025 Bid Document 1/7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 30000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 18 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : nhpc Dulhasti Power Station, NA, NHPC Limited, Ministry of Power (Nhpc Limited) Splitting 2/7
REPLACEMENT OF REFRIGERANT PIPES OF33TR PACKAGED AIR CONDITIONING UNITS 1 3BY WAY OF SITC OF NEW REFRIGERANT PIPES IN PLACE OF STOLEN PIPES OF WARD NO. 18 ALONG WITH ALLIED WORKS GOVT. SMGS HOSPITAL, JAMMU
Servicing of ACs installed at different office of JDA Split AC as well as window AC for the year 2020-2021
LLOYD 3 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.8 Ton - 2.2 Ton Brand: LLOYD (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687774809944 dt
Supply, installation, testing and commissioning of hot and cold, Inverter technology based high wall mounted Split Type Air Conditioning Units and allied works in Newly created COVID 19 isolation centre and other areas in SKIMS, Soura.
Annual Stage Contract for Routine Maintenance and Breakdown Maintenance of Air Conditioning Units (ACs) of various capacities and VRV System installed at Associated Hospital GMC Baramulla along with Operation for a period of one year (2024-25)
Repair, maintenance and servicing of 26 Nos. Air conditioning units of Doctors Rooms of various wards of Ground Floor, Pediatric OPD, CMO Rooms and Skin OPD Areas of 1.5 2 TR capacity each at Govt. SMGS Hospital, Jammu
Window AC 0.75 ton with stabilizer, AC 1.5 Ton with stabilizer, Split AC 0.75 Ton with Stabilizer
Air Conditioner-IS 1391, automatic line voltage corrector or step type auto transformer, Extra Refrigerant Pipe for Air Conditioners(Accessories), Extra Electrical Cable for Air Conditioners (Accessories), Metallic Mount Suitable for Air Conditioner (Accessories) Bidder Turnover (Last 3 Years) 18 Lakh (s) Experience Criteria 3 Year (s)
Repair maintenance and servicing of 22 No. Air conditioning units of ENT OPD, M.S Room, Dy.MS Room, S.O., PA to MS, AAO Room, Matrons Room, Clerical hall, AMS. of 1.5 2 TR capacity each at Govt. SMGS Hospital, Jammu
Repair, maintenance and servicing of 33 Nos. Air conditioning units of Thalassemia ward, Ward 16 rooms, NICUC, NICUB, OPD Teaching Area, Principal Room, Library, Account section, Skin Doctor rooms of 1.52 TR capacity each at Govt. SMGS Hospital, J
Repair, maintenance and servicing of 31 Nos. Air conditioning units of Medical Superintendent and adjacent Areas, PA room, Dy. MS room, Ward no. 17 and ENT OPD area of 1.5 2 TR capacity each at Govt. SMGS Hospital, Jammu.
Air Conditioner, film single loading, Digital Xray film 8x10, Digital Xray film 10x12, AC installation
SPLIT AIR CONDITIONERS
2 Ton Cassette AC with Stabilizer
Cassette AC 2.5 TON with installtion
1 point 5 Ton Split AC, Installation, Stablizer, Water Dispenser, Water bottle
Repair maintenance and servicing of 24 No. Air conditioning units of ENT OPD, M.S Room, Dy.MS Room, S.O., PA to MS, AAO Room, Matrons Room, Clerical hall, AMS. And others of 1.5 2 TR capacity each at Govt. SMGS Hospital, Jammu.