Loading…
Loading…
2,134 results • Best match
Uniboom--IONSTAR INDIA PRIVATE LIMITED 5 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.3 Ton - 1.7 Ton Brand: Uniboom--IONSTAR INDIA PRIVATE LIMITED (Detailed Description/Specificat
Uniboom--IONSTAR INDIA PRIVATE LIMITED 5 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.3 Ton - 1.7 Ton Brand: Uniboom--IONSTAR INDIA PRIVATE LIMITED (Detailed Description/Specificat
Uniboom--IONSTAR INDIA PRIVATE LIMITED 5 Star Wall Mount Type Split Air Conditioner of Capacity Between 1.3 Ton - 1.7 Ton Brand: Uniboom--IONSTAR INDIA PRIVATE LIMITED (Detailed Description/Specificat
The brief Scope of work includes Preventive Maintenance for Air Conditioners & Breakdown Maintenance for Air Conditioners etc., as detailed in section-III of the tender
2 TON SPLIT AC (INVERTER TYPE), 1.5 TON SPLIT AC (INVERTER TYPE), TOWER AC (INVERTER TYPE)
6 HP VRF Type AC unit along with relocation and commissioning of existing 3 Ton capacity cassette AC, 8.5 TR and 5.5 TR Ductable Type AC units and Dismantling of the existing air conditioning unit, 2.0 TR Inverter type High Wall Split AC with all connected accessories
Custom Bid for Services - AMC OF AIR CONDITIONERS AND OTHER COOLING APPLIANCES AT GAIL MANGALORE PETROCHEMICALS LIMITED Similar Category ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system Comprehensive Annual Maintenance Services for ... Precision Air Conditioners
Annual Operation and comprehensive Maintenance (2021-23) of AHUs, Split AC units at AAI Occupied area at KIA and DVOR-II Sidlaghatta at Bangalore Airport, Bangalore
Supply and Installation of 1.5TR cooling capacity concealed ducted Split AC units for proposed IMS facility at MCF Hassan.
Annual maintenance of Split Air conditioning units installed at Office complex, Hospital, IB, Server Room,Mobile Booster Room,Telephone exchange as detailed in section-III of the tender document.
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days Bid Number : GEM/2025/B/6284369 Dated : 20-06-2025 Bid Document 1/9 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 16275 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 17 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Site Director, Kaiga NUCLEAR POWER CORPORATION OF INDIA LIMITED, PMO (Kaiga Nuclear Power Corporation) Splitting
Cassette AC, 2 Ton Capacity
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6859029 Dated : 17-11-2025 Bid Document 1/13, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 15 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : POWERGRID Near RTO Driving Test Track, Singnayakanahalli, Yelahanka – Dodaballapur Road, Yelahanka Hobli, Bengaluru - 560064 (Karnataka) (Powergrid Corporation Of India Limited)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Bid Number ( ) : GEM/2025/B/6244301 Dated : 17-05-2025 Bid Document 1/10 Time allowed for Technical Clarifications during technical evaluation 2 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Payment Timelines Payments shall be made to the Seller within 90 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference Yes MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Air Conditioner-IS 1391 ( PAC Only ), Metallic Mount Suitable for Air Conditioner (Accessories) ( PAC Only ), Extra Refrigerant Pipe for Air Conditioners(Accessories) ( PAC Only ), Extra Electrical Cable for Air Conditioners (Accessories) ( PAC Only ... FOR AIR CONDITIONERS (Accessories) ...
Supply, Installation, Testing and Commissioning of 2-Ton capacity split Air Conditioner unit as per attached technical specification. Make: LG, Voltas, Daikin, Samsung, Panasonic, Blue Star, Godrej and Haier or similar.
Custom Bid for Services - ONE TIME REPAIR OF AIR CONDITIONERS Similar Category ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system Repair and Overhauling Service
AMC of AC & Ventilation system of RTPS Green Building for a period of one year- excluding water cooled chiller & VRF air conditioners units.
Annual Maintenance service-AIR CONDITIONER, ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system
R and M of E and M Installation at Mysore Airport. CAMC of Split AC units for the year 2020-21
Renovation of Classroom in Admin Section/ building including Electrical fittings accessories and providing cassette AC units along with civil works at CFSP and TI Hessaraghatta Bangalore.
Supply, installation, testing and commissioning of 4 No. 2.0TR and 1 No. 1.5TR capacity split air conditioners of reputed make along with the connected accessories at the registered office, KPCL, Shakthi Bhavan, Bengaluru and 1 No. 1.5TR capacity ... capacity split air conditioner of ...
Custom Bid for Services - HIRING OF CONTRACT SERVICES FOR MAINTENANCE OF AIR CONDITIONERS OTHER COOLING APPLIANCES INSTALLED AT GMPL MANGALURU Similar Category ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system Comprehensive Annual ... Precision Air Conditioners
Custom Bid for Services - CAMC for Chiller Similar Category ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system Comprehensive Annual Maintenance Services for Precision Air Conditioners
Custom Bid for Services - AMC for Chillers Similar Category ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system Comprehensive Annual Maintenance Services for Precision Air Conditioners
Custom Bid for Services - CAMC for Chillers Similar Category ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system Comprehensive Annual Maintenance Services for Precision Air Conditioners
Supply, Installation, Testing and Commissioning of 1.5 Ton AC Unit, Inverter type/5 Star rated (Label period: 1st Jan 2025 to 31st December 2025), split air conditioner conforming to IS 1391 (Part 2)
Supply, installation, testing and commissioning of 1.5 Ton AC Unit, Inverter type/5 Star rated(label period: 1st july 2022 to 31st december 2024), split air conditioner with R410 gas with compressor 1
1)Provision of BEE 5 star rated air conditioning units in place of old conventional AC units on age basis and provision of BEE 5 star rated geysers in place of old non BEE 5 star rated geysers on age cum condition basis over Bangalore division(PID: 14.01.36.25.4.50.010) 2)Provision of standby pumps over major GLRs of SBC division (PID: 14.01.36.25.3.50.010)
Air Conditioners
Custom Bid for Services - AMC for Voltas Chiller Similar Category ANNUAL MAINTENANCE SERVICE FOR Centralised air conditioning system Comprehensive Annual Maintenance Services for Precision Air Conditioners
Custom Bid for Services - CAMC FOR AC UNITS Similar Category Comprehensive Annual Maintenance Services for Precision Air Conditioners Customized AMC/CMC for Pre-owned Products
2 Ton Cassette AC (Q3)
Cassette Ac 2 Ton (Q3)
AMC FOR AC UNITS IN HUBLI BA
Comprehensive AMC for Split Air Conditioner
DUCTED AIR CONDITIONERS
SPLIT AIR CONDITIONERS
3 Ton Ceiling mounted Cassette AC
1.5 TON INVERTER TYPE SPLIT AC, INSTALLATION COMMISSIONING OF INVERTER TYPE AC
Supply installation testing and commissioning of Tower Model Split AC Units for Providing additional AC facilities for Aditya at URSC Main Campus Vimanapura Bengaluru 560017
SITC of 2 X 8.5TR Ductable AC
Air Conditioner, Installation and Commissioning of Air Conditioners at Extra cost(Excluding Accessories) Bidder Turnover (Last 3 Years) 3 Lakh (s) Experience Criteria 2 Year (s)
Providing Ductable Split AC units for Server Rooms and Bonded store Area at Admin Building, Lab Block and Arybhatta Building of LEOS campus, Peenya, Bangalore-560058
2TR INVERTER CASSETTE AC (BEE 5 STAR)