Loading…
Loading…
67 live35 closing this weekmost from Department Of Military Affairs and CE Public Works Department
67 results • Best match
Supply &ampamp fixing of Air Conditioner (06 Nos.) in Office Building at ATC Farm Khara District Bikaner
SITC of Air conditioner work in Construction of 3 new room on 1st floor at circuit house Pali.
RFP for Repair and Maintenance of MEP/ Civil Works and AMC of Air Conditioning, RO,UPS etc. Makeshift Old JNVU Campus, Jodhpur
RFP for Repair and Maintenance of MEP/ Civil Works and AMC of Air Conditioning, RO, UPS etc. Makeshift Old JNVU Campus, Jodhpur
Ajmer Division: Comprehensive Repair Maintenance Contract of Window/Split Air Conditioners (Capacity-1.5 & 2 Ton) at various stations/IBH over Ajmer Division for 03 years
Rate Contract for Central Air Conditioner Model KWS095, 12x2 (Extended upto 95.12 Ton) and O AND M for 1 Year
चिकित्सालय में स्थापित Central Air Conditioner Model KWS095. 12X2 (Extended Upto 95.12 Ton) का वार्षिक संचालन एवं मरम्मत का कार्य हेतु
27- RATE CONTRACT FOR AC MAINTENANCE AT JLN MEDICAL COLLEGE AJMER
Supply &ampamp Installation of Three (03) Nos. Split AC and Four (04) Nos. Wall Fan as per Annexure-D at RSMML, Khanij Bhawan, Jaipur
ARMO of E.I. & Fans, Substation equipments, Pump sets, DG set, Lifts, Fire Alarm and Fire Fighting system, AC Units i/c Street light & Compound lights at ITAT Campus, Jaipur for year 2026-27.
NVR 64 Channels, Hard Disk 10 TB WD, PTZ Camera 175 IR Range, PTZ Camera Stand, OFC 24 Core, Media Converter, UPS 1 KVA, Media Rack, Network Switch, FMS Rack, OFC Patch Cord, CAT 6 Patch Cord, Split Air Conditioner, LED Screen 85 Inches, Inverter with Dual Battery, Configuration, Installation and Fixing of Cameras
Stainless Steel Tiffin T 5, Water Dispenser Pump, White Board 3x2 ft, Dustbin Big, Trolley for Inverter, Refrigerator Double Door 300 Ltr, Glass Door, Revolving Chair, Water Pipe, Foot Mat, Window AC 2 Ton, Split AC 1.5 Ton, Revolving Chair with Arm Rest, Patient Chair, Stabilizer 4 KVA
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - Complete System
Operation And Maintenance Of HVAC System (Heating, Ventilation And Air Conditioning System) - As per BOQ item no 01 of tender document, Ventilation And Air Conditioning System) - As per BOQ item no 02 of tender document
Upgradation of branches, old offices for staff working and Officer chambers, miscellaneous works in c/w Provision of Air Conditioner unit, Provision of hall with attached toilet for retired railway employees, drainage, water harvesting and other misc. work in DRM Office, Bikaner under ADEN/HQ/BKN
Hiring of Consultants - Milestone/Deliverable Based - Hiring of consultancy services for fire precaution, central Air Conditioning system and Electric services for stage of building Auditorium cum Cinema Hall at Niwaru, Jaipur Mil Stn; Hiring of cons..
Miniature Circuit Breakers (MCB) for AC Operation Marked To IS/IEC 60898 (Part 1) (Q2), Supply install testing and commissioning of vertical pack type tower50Hz of capacity 4 TR, Supply and install of voltage stabilizer for automatic operation, M and ... of, Air Conditioner 1 ... Window Air Conditioner 1 ...