Loading…
Loading…
8,392 results • Best match
Asset Management Services - Replacement of old Split AC by new one and minor maintenance work in the inspection house situated at Badalpur in the G B Nagar District; Onsite
Lead Wool, Lead Pig, Spun Yam, Condenser Coil for 1.5 TR for Split Ac, Condenser Coil for 1.5 TR for Window Ac, Stop Cock CI, Ring Spanner Set BOQ Title BOQ ITEM BID
Routine / breakdown maintenance work of M/s L and T make 0.4 KV switchgear of Air Conditioning Plant of MCB, UCB, Service House Building and E.P. Control rooms Except Motor maintenance work
Offloading work for Annual Maintenance Contract for maintaining the Air conditioning system of 09 Nos. REL Drill machines (06 Nos. REL650D Drill and 03 Nos. REL 750E Drills) working at Khadia Project
WORK OF ANNUAL MAINTENANCE/SUPERVISION OF LIGHTING, L.T. SYSTEM AND COMPLETE AIR CONDITIONING SYSTEM AND OTHER ASSOCIATED WORKS AT 400 KV S/S MORADABAD UNDER ELECTRICITY 400 KV SUB-STATION DIVISION MORADABAD
Comprehensive annual maintenance contract of Stulz make Precision Air Handling Unit PAHU Cooling Distribution Unit CDU and Precision Air Conditioning Unit PAC installed at Computer center and Microscope Building at IIT Kanpur
Annual Maintenance contract for Cabin Air conditioning System in 21 nos dumpers CAT777D 100 Te 19 nos and CAT777DI 85 Te 02 nos at Dudhichua Project for a period of 01 year
Repairing, Maintenance, Servicing and Overhauling including testing of 6x5.5 Ton Capacity Duct type Air Conditioning System (Blue Star make) along with all associated works at 220KV Substation Dohna under ETD-II Bareilly
Annual maintenance contract of Cabin Air Conditioning system of BEML make 02 nos. BH-100 dumpers and 04 nos. BWS-70 Water Sprinkler of Khadia Project for a period of 365 days.
Annual maintenance contract of air conditioning system of operator cabin of CAT D11T Dozer Sl. No-661 and 668 and 992K Payloader Sl. No-ZMX00642 working in Khadia Project for 730 days.
Annual Maintenance Contract for Maintaining inbuilt Air Conditioning System in different model Drills DMH311 04 nos IDM70E 03 nos and IDM30D 08 nos. of Dudhichua Project for a period of 2 years
Offloading of the work for Annual Maintenance Contract AMC for Cabin Air Conditioning System in 03 nos Komatsu WD600 3 Wheel Dozers and 02 nos Komatsu D475A Crawler Dozers of Dudhichua Project
Design, Engineering, Manufacturing, Procurement of Materials and Bought Out Components, Assembly Shop, Inspection, Testing, Packing, Delivery at Site for Supply of Complete Precision Air Conditioning Unit At IS Server Room, Mathura Refinery.
Annual maintenance contract for inbuilt Air conditioning system in Komatsu make WA600 6R Payloader for a period of 1 year, working at Bina project. (Work to be carried out at NCL site).
WORK OF ANNUAL MAINTENANCE / SUPERVISION OF LIGHTING L.T. SYSTEM AND COMPLETE AIR CONDITIONING SYSTEM AND OTHER ASSOCIATED WORKS AT 400 KV SUB-STATION MORADABAD UNDER ELECTRICITY 400 KV SUB-STATION DIVISION MORADABAD
Annual Routine & Comprehensive Maintenance of electrical and mechanical services for RRSL, Varanasi. (SH - Miscellaneous electrical work in RRSL building alongwith providing and fixing of CCTV camera, Air conditioning & EPBAX system at Payakpur)
Maintenance of EI & Fans, S/Light and Repair & Operation of pump set i/c SITC of High Wall Split Air Conditioning System at CIPMC Khajni Road, Gorakhpur (During the year 2026-27)
Offloading the work of repair and maintenance of air conditioning system fitted in operators cabin of BEML Dozer Sl. No. 11769 of Krishnashila Project for the period of 365 Days (One year).
Condenser Motor With Fan Blade for Air conditioning Unit in 3 Phase locos. 0.25 KW, Frame 71, Frequency: 50 HZ +/- 5%, Voltage 415 +/- 10% RPM: 1350, Duty: SI, Connection: Star, Insulation Class
1.5 Tr 5 Star Inverter Split Type Air Conditioner, 2.0 Tr 5 Star Inverter Split Ac, 5KVA Voltage Stablizer For 1.5/2.0 Tr Split Ac, MS Angle Stand For Outdoor Unit Of Split A. C., COPPER PIPE, CONTROL CABLE LEAD ( 1188 meter ), P. V. C. Drain Pipe ( 792 meter ), Air Curtain For 5 H Model C 1-060 Complete, Heet Steel Enclosure Flush/surface Fitted With 20A 2 Pin Metal Clad Scraping Earth Plug For AC With, S/F Of 6 Way VTPN DB With Additional Metal Door Without Door, 80 To 100 Amp 4 Pole MCCB (16KA) Thermal Magnetic, 6 To 32A SPMCB, 15 A 240V F/T Switch & 6 Pin Socket In Suitable M. S. Box Complete, Submain Wire 2.5 Sqmm 2 Wire Copper ( 630 meter ), Submain FR PVC Insulated Copper Cond. 4 Sqmm 2 Wire Copper ( 1450 meter ), Submain FR PVC Insulated Copper Cond. 6 Sqmm 2 Wire Copper ( 2400 meter ), 400 Sq. Mm 3-1/2 Core Armoured Cable ( 80 meter ), 120 Sq. Mm 3-1/2 Core Armoured Cable ( 60 meter ), 70 Sq. Mm 3-1/2 Core Armoured Cable ( 90 meter ), 35 Sq. Mm 3-1/2 Core Armoured Cable ( 240 meter ), Cable Gland 400 Sq. Mm 3-1/2 Core, Cable Gland 120 Sq. Mm 3-1/2 Core, Cable Gland 70 Sq. Mm 3-1/2 Core, Cable Gland 35 Sq. Mm 3-1/2 Core, Cable Lug 400 Sqmm, Cable Lug 240 Sqmm, Cable Lug 120 Sqmm, Cable Lug 70 Sqmm, Cable Lug 50 Sqmm, Cable Lug 35 Sqmm, Cable Lug 25 Sqmm, 100 Amp MCCB Cubicle Panel With Outgoing Of 63 A MCCB - 2 Nos., 200 Amp MCCB Cubicle Panel With Outgoing Of 100 A MCCB, 400 Amp MCCB Cubicle Panel With Outgoing Of 100 A MCCB - 3 Nos. 63A, 800 Amp MCCB Cubicle Panel With Outgoing Of 400 Amp. MCCB - 1 No. , 200 Amp MCCB - 1 No. , 100 Amp MC, 2 Nos. 8 SWG G. I. Wire ( 180 meter ), GI Strip 25 X 3 Mm ( 240 meter ), TILED FALSE CEILING ( 1698 meter ), Wiring Point For Light With 1.5 Sq. Mm. FRLSH PVC Insulated Multistrand Single Core Copper Conductor ( 42 ream )
Facility Management Services - LumpSum Based - Commercial; Tower Air Conditioner (Floor Type); Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Commercial; Split Air Conditioner;...
Unitary Air Conditioner (Window AC) (V2) as per IS 1391 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6445360 Dated : 12-07-2025 Bid Document 1/10 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 51240 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/10 PFA/NER/GKP Office Of The Principal Financial Advisor, Indian Railways, North Eastern Railway, Ministry of Railways (Pfa/ner/gkp) Splitting
Unitary Air Conditioner (Window AC) (V2) as per IS 1391 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes Past Performance 20 % Bid to RA enabled No Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6343279 Dated : 13-06-2025 Bid Document 1/9 Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Estimated Bid Value 571200 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 11430 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 15 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr Divisional Finance Manager, NR, LKO 1.EMD/PBG to be submitted to the Sr. Divisional Materials Manager, Hazaratganj Lucknow Office. 2. For any bid related query/submission of documents/correspondence, you may contact following Supervisor: Mr.Nripendra Kumar, ChDMS [Mob9794833772] of the Office of Sr. Divisional Materials Manager, Hazaratganj Lucknow. 2/9 (Sarvesh Singh) Splitting
Supply of Cassette AC, 3.0 TR SINGLE PHASE ONLY BEE 5-Star Inverter AC, Supply of Hi-Wall Split AC, 1.5 TR BEE 5-Star Inverter AC, Supply of Hi-Wall Split AC, 1.0 TR BEE 5-Star Inverter AC, Installation of 3.0 TR Cassette AC, Installation of 2.0 or ... Hi-Wall Split AC , ...
Supply of Cassette AC, 3.0 TR BEE 5-Star Inverter AC, Supply of Hi-Wall Split AC, 1.5 TR BEE 5-Star Inverter AC, Supply of Hi-Wall Split AC, 1.0 TR BEE 5-Star Inverter AC, Installation of 3.0 TR Cassette AC, Installation of 1.5 or 1.0 TR Hi-Wall ... Hi-Wall Split AC , ...
WORK OF REPAIRE AND MAINTENANCE OF SPLIT AND WINDOW TYPE AIR CONDITIONER INSTALLED IN CONTROL ROOM AND KIOSK AT 220 KV AND 132 KV SUBSTATIONS UNDER ETD HAMIRPUR.
FOR REPAIRING OF SPLIT AND WINDOW AIR CONDITIONER INSTALLED IN CONTROL ROOM AT 220KV S/S SARH AND 220KV S/S NAUBASTA UNDER ELECTRICITY TRANSMISSION DIVISION-II KANPUR.
AMC and General shift Operation, Maintenance of 08 Nos 17TR package type air-conditioner units of Ms Voltas make installed at ESP Control Room of 5x200MW, BTPS, Obra
PROVISION OF PACKAGE TYPE AIR CONDITIONER AT LDP LAB, PROVISION OF STANDBY COOLING TOWER MOTORS ALONGWITH CONNECTED ITEMS AND PROVISION OF CERTAIN MINOR WORKS AT AF STATION BAREILLY
Blower Motor for 2.2 TR of EMU Cab Air Conditioner of M/s. Prag make, confirming to M/s. Prag part No. 210107012. Make/Brand : Star Electric Company
Facility Management Services - LumpSum Based - Bank; Supply and Fixing of 2 nos 2 Ton 5 Star Inverter Type Split Ac; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - Bank; ... Type Split Ac ; ... Type Split Ac ; ...
Customized AMC/CMC for Pre-owned Products - Annual maintenance contract for air conditioners water coolers refrigerators deep freezers RO water purifier units plants installed at various CF assets in Lucknow Cantonment; As per Terms Conditions and ..
ARMO of Electrical and Mechanical installations at Kanpur Airport. SH Annual Maintenance and Operation contract of Window and Split Air-Conditioners, RO and Industrial Type Water cooler cum RO Water Purifier for the year 2020-21.
Automatic Line Voltage Correctors (Step Type) For Domestic Use (Stabilizer) Conforming To IS 8448 (Q2), Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
SUPPLY OF AC 2.5 TR Casette Unit 3 Phase, SUPPLY OF AC 2.0 TR Single Split Unit, SUPPLY OF AC 1.5 TR Single Split Unit, SUPPLY OF AC 1.0 TR Single Split Unit, SITC of digital timer with 4 hr to 8 hr option suitable for 1.5 tr or 2 tr load, Providing and Installation of 4KVA voltage Stabilizer with range of 100 to 280V
PCBs, Fan Assy, Job work, installation, Maintenance Work
As per tender document
M6620106004_Barauni, M6620106004_Darlipali, M6620106004_WR II HQ, M6618100069_Barauni, M6618100069_Darlipali, M6618100069_Sipat, M6600001011_Barauni, M6600001011_Sipat, M6600001011_Tanda
Water Cooler with RO, Split Air Conditioners
Supply of 1.5 TR inverter type 5 Star rated split AC unit at OLT sites (Block Head Qtrs.) for various places B.A. Agra. (SH-ITC of Split A/c units)
PROVIDING E AND M WORK SERVICES AT HAF HINDAN GHAZIABAD SH REPAIR/REPLACEMENT OF 1.5/2 TR SPLIT AC UNIT AT VARIOUS LOCATION AT AF STN HINDAN DURING 2025-26
RMO 2X110 TR CENTRAL AC SPLIT AC AND WTAC AT CBI ACADEMY GHAZIABAD SH COMPREHENSIVE MAINTENANCE OF DAIKIN MAKE VRV SYSTEM INSTALLED AT VERTICAL EXTENSION ADMIN BLOCK AND BILLARD ROOM
V GAURD Metallic Mount Suitable For High Wall Split AC Brand: V GAURD (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687746132043 dt.16/05/2025)
V GAURD Metallic Mount Suitable For High Wall Split AC Brand: V GAURD (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687720234939 dt.30/08/2024)
Servicing Installation of AC, Repair of AC and Gas Charging, AC for way wire, Repair of PCB, New Sencer, Capacitor
Renovation of air conditioning facility of DOAA building Ist and 2nd floor for Wadhwani School of AI including supply and laying of chilled water pipeline connected with new central AC plant IIT Kanpur
Overhauling Pressure Testing Flushing and Vacuumizing of Voltas make 120-Ton model 05126S and 80-Tone Model-5H80 Air conditioning Compressor installed for UCB and Service House Building of 2X210 MW PTPP Parichha
GENERAL MAINTANANCE AND REPALCEMENT OF DAMAGED COMPRESSOR AND OTHER DEFECTIVE PARTS OF 5X16.5 TON AIR-CONDITIONING SYSTEM INSTALLED AT 400 KV S/S AZAMGARH UNDER EE ELECTY 400 KV S/S DIVISION AZAMGARH
Offloading work for Annual Maintenance Contract for maintaining the inbuilt Air conditioning system of 09 Nos. REL Drill machines (06 Nos. REL650D Drill and 03 Nos. REL 750E Drills) working at Khadia Project
PROPOSED FALSE CEILING , WALL PENALING , HEATING VENTILATION AIR CONDITIONING RKVY ESTABLISHMENT OF CENTRE FOR TRAINING , RESEARCH AND PRODUCTION OF BIOFERTILIZER AND BIOPESTICIDE FORMULATIONS FOR THE BENEFIT OF FARMERS IN EASTERN U.P., AT A.N.D.