Loading…
Loading…
7,268 results • Best match
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6990190 Dated : 11-12-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6627613 Dated : 30-08-2025 Bid Document 1/7 Bid to RA enabled No RCM Applicable Yes Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6641421 Dated : 03-09-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 258000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6590402 Dated : 20-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause Yes ( Arbitration clause document ) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6783976 Dated : 13-10-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 10 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience/Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Single Packet Bid Bid Number : GEM/2025/B/6489560 Dated Bid Document 1/8 Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 138600 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
REPAIR / REPLACEMENT OF SUMMER APPLIANCES, CENTRAL AIR-CONDITIONING PLANTS, PACKAGE TYPE AIR-CONDITIONERS, SPLIT AND WINDOW AIR-CONDITIONERS, REFRIGERATORS, WATER COOLERS, ETC., AND CONNECTED WORKS AT COOCH BEHAR, TELEPARA AND BINNAGURI MIL STN UNDER
SITC of Hi-Wall Split Air-Conditioners, Metallic Mount Suitable for Air Conditioner (Accessories), Extra Refrigerant Pipe for Air Conditioners (Accessories), Extra Electrical Cable for Air Conditioners (Accessories), DRAIN PIPE FOR AIR CONDITIONERS (Accessories)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6708782 Dated : 20-09-2025 Bid Document 1/7, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Custom Bid for Services - AMC OF WINDOW AND SPLIT AIR CONDITIONER OF VARIOUS CAPACITY 1 TR TO 2 TR AT DIFFERENT SECTION AND OFFICES AS PER SCOPE OF WORK
Custom Bid for Services - AMC OF WINDOW AND SPLIT AIR CONDITIONER OF VARIOUS CAPACITY 1 TR TO 2 TR AT DIFFERENT SECTIONS AND OFFICES AS PER SCOPE OF WORK
Air Conditioner, DRAIN PIPE FOR AIR CONDITIONERS (Accessories), Metallic Mount Suitable for Air Conditioner (Accessories) Bidder Turnover (Last 3 Years) 1 Lakh (s)
SITC of 3 x 2 TR 5 star Inverter Split AC units and allied works at BPC, Kolkata GPO.
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6859126 Dated : 05-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 10 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6954468 Dated : 13-12-2025 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank HDFC Bank (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : DEPUTY MANAGER (SCM) EAST, Balmer Lawrie and Company Limited, Balmer Lawrie and Company Limited, Ministry of Petroleum and Natural Gas (Balmer Lawrie And Co. Ltd.) UIN Number NCTGC2415P
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number ( ) : GEM/2025/B/5978604 Dated : 25-02-2025 Bid Document 1/8 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority Board of Officers Auto CRAC Days 15 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference No MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Startup, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to their meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
SITC of Access control System , CCTV Surveillance System, Split AC units for Power Plant and EI,MV panel for SMPS for 4G Mini DC at Durgapur Industries TE, WB circle (SH-EI, MV panel for SMPS and power feeding arrangement for Split AC units)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6938688 Dated : 10-12-2025 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 21 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : NHPC Limited NHPC Office Complex, Sector-33, Faridabad, Haryana - 121003 (Nhpc Limited)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2025/B/6830251 Dated : 31-10-2025 Bid Document 1/10, -- Number of days for which Bid would be auto -- extended 10 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 300000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : SENIOR GENERAL MANAGER PO-RBNML, Salboni-721132, Dist.-West Midnapore, West Bengal (Bharatiya Reserve Bank Note Mudran Pvt.ltd.)
Split Air Conditioner Machine, Installation Charges, Metal Bracket, Drain Water Pipe, Flexible copper cable, Copper Pipe suction
M6620150008 SPLIT AC 2TON 3STAR, M6620260000 4 TON TOWER AC: COMPLETE UNIT, M6620100000 1.5 TON: SPLIT AC COMPLETE ASSY
Repair and Overhauling Service - Window Air Conditioner including Green AC; Voltas; No; Buyer Premises, Repair and Overhauling Service - Split Air Conditioner including Green AC; LG; Yes; Buyer Premises, Repair and Overhauling Service - Split Air Conditioner...
ONIDA Split Air Conditioner, Wall Mount Type 2 Ton 3 Star Brand: ONIDA (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687717022742 dt.22/12/2023)
LLOYD Split Air Conditioner, Wall Mount Type 1.5 Ton 3 Star Brand: LLOYD (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687752127663 dt.23/04/2024)
LG Split Air Conditioner, Wall Mount Type 1.5 Ton 3 Star Brand: LG (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687743831068 dt.10/05/2024)
LLOYD Split Air Conditioner, Wall Mount Type 1.5 Ton 3 Star Brand: LLOYD (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687733862526 dt.23/04/2024)
LG Split Air Conditioner, Wall Mount Type 1.5 Ton 3 Star Brand: LG (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687712471940 dt.23/04/2024)
LG Split Air Conditioner, Wall Mount Type 1.5 Ton 3 Star Brand: LG (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687725821239 dt.29/05/2024)
godrej Split Air Conditioner, Wall Mount Type 2 Ton 5 Star Brand: godrej (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687763092041 dt.04/07/2024)
godrej Split Air Conditioner, Wall Mount Type 1.5 Ton 5 Star Brand: godrej (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687766995815 dt.14/06/2024)
BLUE STAR Split Air Conditioner Including Green AC 5201 = 7000 Brand: BLUE STAR (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687720289727 dt.01/11/2022)
LG Split Air Conditioner, Wall Mount Type 1.5 Ton 3 Star Brand: LG (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687794209624 dt.19/06/2024)
LLOYD Split Air Conditioner, Wall Mount Type 1.5 Ton 5 Star Brand: LLOYD (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687784878239 dt.27/03/2024)
LLOYD Split Air Conditioner, Wall Mount Type 2 Ton 5 Star Brand: LLOYD (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687752766517 dt.16/05/2024)
godrej Split Air Conditioner, Wall Mount Type 1.5 Ton 5 Star Brand: godrej (Detailed Description/Specification as per Product # 2 of GeM Contract No. GEMC-511687767959221 dt.02/02/2024)
LLOYD Split Air Conditioner, Wall Mount Type 1.5 Ton 5 Star Brand: LLOYD (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687746480627 dt.22/02/2024)
godrej Split Air Conditioner, Wall Mount Type 2 Ton 5 Star Brand: godrej (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687723856428 dt.20/03/2024)
LLOYD Split Air Conditioner, Wall Mount Type 2 Ton 5 Star Brand: LLOYD (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687712810579 dt.16/05/2024)
Split Air Conditioner (Ceiling Mount Type), as per IS: 1391 (part 2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2025/B/6584824 Dated : 25-08-2025 Bid Document 1/10, -- Number of days for which Bid would be auto -- extended 7 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 17 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : ACTING THROUGH PURCHASE OFFICER, CRPU CRPU, Directorate Of Purchase And Stores, Department of Atomic Energy, Sector-1, Block-AF, Bidhan Nagar, Salt Lake, Kolkata - 700 064, OUR CASE FILE NO. DPS/CRPU/VECC/30808 (The President Of India) Splitting
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 4 Days Bid Number ( ) : GEM/2025/B/6009590 Dated : 01-03-2025 Bid Document 1/9 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India ePBG Percentage(%) (%) 5.00 Duration of ePBG required (Months) ( ) . 62 (a). EMD & Performance security should be in favour of Beneficiary, wherever it is applicable., Beneficiary : AGM(Projects) MATERIALS MANAGEMENT DEPT IISCO STEEL PLANT, Steel Authority of India Limited, Ministry of Steel (Shravan Kumar) MII Purchase Preference MII Purchase Preference Yes MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Startup, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to their meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
1393/NKDA/Engg-36/2010-XII -Supply and Installation of VRF air conditioner system for 1st and 2nd floor Banquet Halls and Split Air Conditioner System for four nos. guest room, office room and lounges at mezzanine floor level of Community Centre-1
Air Conditioner-IS 1391, Extra Refrigerant Pipe for Air Conditioners(Accessories), Extra Electrical Cable for Air Conditioners (Accessories), DRAIN PIPE FOR AIR CONDITIONERS (Accessories), Metallic Mount Suitable for Air Conditioner (Accessories), ... of Air Conditioners at ...
Air Conditioner, automatic line voltage corrector or step type auto transformer, Metallic Mount Suitable for Air Conditioner (Accessories), Extra Refrigerant Pipe for Air Conditioners(Accessories), DRAIN PIPE FOR AIR CONDITIONERS (Accessories) Bidder Turnover (Last 3 Years) 2 Lakh (s)
COMPREHENSIVE MAINTENANCE OF VRF DUCTABLE PACKAGE AC UNITS AND CENTRAL AIR CONDITIONING SYSTEM INSTALLED AT FORT WILLIAM UNDER GE (FW) KOLKATA
SITC OF DUCTABLE AC
11 Ton Ductable AC
SITC of 1 no 1.5 TR Inverter Split AC units and allied electrical works for SPO Chamber, Tamluk Division Office.
SITC of 2 nos 2.0 TR Inverter Split AC units at Sify PMU room Ground Floor for Yogayog Bhawan,Kolkata.
Air Conditioner, Extra Refrigerant Pipe for Air Conditioners(Accessories) Bidder Turnover (Last 3 Years) 2 Lakh (s)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6719205 Dated : 26-09-2025 Bid Document 1/10 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 90460 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 17 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : ACTING THROUGH PURCHASE OFFICER CRPU, Directorate Of Purchase And Stores, Department of Atomic Energy, Sector-1, Block-AF, Bidhan Nagar, Salt Lake, Kolkata - 700 064, OUR CASE FILE NO. DPS/CRPU/VECC/31400 (The President Of India) 2/10