Loading…
Loading…
5,161 results • Best match
Providing and fixing interlocking Tiles 80mm thick on Berms along the B.R Ambedkar Park and Repair of compound wall, Upgradation of Lane and Drain from the shop of Bishamber Karyana store to H/o Anil Bakshi, Construction of Lane and Drain from
Construction of 3 No 10000 Gln GSR, Construction of 4 No 5000 Gln GSR ,1 No Pump Room, 5 Nos. spring cover ,01 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Namblan (JJM).
Construction of 2 No 20000 Gln GSR ,Construction of 3 No 10000 Gln GSR, 3 Nos Pump Room, 06 No. spring cover, 03 No. compound wall , 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Saroola (JJM).
Construction of 1 No 20000 Gln GSR/Sump Tank, Construction of 1 No 10000 Gln GSR, Const. of 02 Nos. 5000 Glns, 2 Nos Pump Room, 02 Nos. Compound wall, Laying and Fitting Rising Main and Distribution system under WSS Lower Dhangri (JJM).
Construction of 04 Nos. (Four Nos.) 4000 glns per hour capacity Slow Sand Filteration Plant, 04 Nos. 20000 Glns Sump Tank, 01 No. Pump Room and 03 Nos. compound wall at WSS Loorkote, WSS Dhanwan , WSS Chingus and WSS Mubarakhpura (Under JJM)
Construction of 4 No 20000 Gln GSR/Sump Tank, Construction of 2 No 10000 Gln GSR, 01 No. spring cover , 2 Nos Pump Room, 02 Nos. Compound wall, Laying and Fitting Rising Main and Distribution system under WSS Behrote Kashmiri Mohalla (JJM).
Construction of 2 No 10000 Gln GSR, Construction of 2 No 5000 Gln GSR ,01 No. collection tank , 4 Nos. spring cover ,01 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Drari (JJM).
Construction of 3 No 20000 Gln GSR, Construction of 3 No 10000 Gln GSR ,2 Nos Pump Room, 2 Nos. spring cover ,02 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Lower Sawani (JJM).
Construction of 8 No 20000 Gln GSR, Construction of 2 No 10000 Gln GSR ,03 Nos Pump Room, 03 No. compound wall, 01 No. protection work , Spring cover 13 Nos. Laying and Fitting Rising Main and Distribution system under WSS Ghambir Mughlan (JJM).
Construction of 4 No 20000 Gln GSR ,Construction of 2 No 5000 Gln GSR, ,2 Nos Pump Room, 02 No. spring cover . 02 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Loorkote (JJM).
Construction of 1 No 20000 Gln GSR/Sump Tank, Construction of 4 No 10000 Gln GSR, Construction of 2 No 5000 Gln GSR , 5 Nos Pump Room, 05 No. Compound wall, Laying and Fitting Rising Main and Distribution system under WSS Margan (JJM).
Construction of 4 No 10000 Gln GSR, Construction of 1 No 5000 Gln GSR ,3 Nos Pump Room, 3 Nos. spring cover ,03 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Patrara (JJM)
Please refer in BOQ
Construction of 9 No Dugwell, 11 No 2000 Gln Per Hour Capacity Slow Sand Filteration Plant, 10 No Pump Room, 10 No 10000 Glns Sump Tank, and 1800mtr Boundary Wall under WSS Kalsian, Bagnoti, Garan Pain, Pukharnie, Sangpur, Laroka, Langer and Chowki
Constt. of underground water tank and boundary wall at UPS Kalyal W. No. 2(2.50) and Const. of Tractor road from link road to SC Moh. Near the H/o Pritam Chand and others W.No. 2. (2.00) Pyt. Gurah Kalyal-East , Block Mandli
Renovation / up gradation of Kabrastan Chinore by way of Const. of boundary wall water tank, one room and fixing of Onex tiles under shed at kera including const. of waiting shed, drain plate farm at Chinore cremation ground in ward No. 62 (CCDP)
Construction of 1 No 5,000 Gln GSR/Sump Tank, 5 No 10,000 Gln GSR/Sump Tank, 2 No 20,000 Gln GSR/Sump Tank, 1 No pump room, 180 mtr boundary wall, Laying and Fitting Rising Main and Distribution system under WSS Siot (JJM).
Construction of 1 No 5000 Gln GSR/Sump Tank, 5 No 10000 Gln GSR/Sump Tank, 1 No 20000 Gln GSR/Sump Tank, 3 No Pump Room, 360mtr boundary wall Laying and Fitting Rising Main and Distribution system under WSS Deeing (JJM).
Construction of Boundary wall near kabir bhawan , construction of drain from haveli of rakesh kumar to h/o harnam singh and construction of lane drain from h/o pupinder singh village and panchayat Chak Bala Block RS Pura (DDC COMPONENT) for the year
REPAIR REPLACEMENT OF SEWAGE LINE CLEANING OF MANHOLES SEPTIC TANKS ETC INCL DAY TO DAY LINE CLEANING AND REPAIRS TO BOUNDARY WALL AND MAINT OF EXTERNAL PIPE LINE SLUICE VALVE ETC AND MAINT OF PERIMETER SECURITY LIGHTS AT 213 TC UNDER GE NAGROTA
Const. of community Hall at Shiv Mandir Qasim Nagar ,Const. of boundary wall and tile work in Radha Swami ashram in Qasim Nagar,Tile Work IN Govt Pry School Pacca Talab and Const. of lane and drain at Pacca Talab. (Phase - II)
CONST. OF LANE DRAIN NEAR HOUSE OF TARSEM LAL TO ONWARDS AT WNO 7 AND CONSTT OF BOUNDARY WALL GMS DADORA AT WNO 8 IN PANCHAYAT BAKORE, BLOCK KHOUR UNDER THE SCHEME CAPEX BUDGET (PRI PLAN) FOR THE YEAR 2023-24. ( Pyt Level)
1. Const. of 02 ACR at Govt. Girls Middle School Chowki Under SAMAGRA SHIKSHA for the Year 2025-26 (SSR 2020). 2. Construction of Boundary Wall at Govt. Girls Middle School Chowki Under SAMAGRA SHIKSHA for the Year 2025-26 (SSR 2022).
DEVELOPMENT OF FOLLOWING FACILITIES AT IOCL ZEWAN DEPOT UNDER PUNJAB STATE OFFICE A CONSTRUCTION OF BOUNDARY WALL APPR 175 M LENGTH GATE BOOM BARRIER AND ALLIED WORKS IN TT PARKIN AREA B PROVISION OF OFFICE ROOM AND RACKING ARRANGEMENT AT LUBE G
CA NO GES U 12 2023 24 PROVN OF COVERED SHELTER RETAINING WALL AT DEPOT AREA RECONSTRUCTION OF BOUNDARY WALL NEAR BLDG NO P13 AT SAPPER ENCLAVE AND REWIRING OF BLDG NO NP15 OR LIVING AT MED REGT UNDER GE SOUTH UDHAMPUR
PROVISION OF PAINTING ON ROOF OF 37 BUILDINGS ALONG WITH CHANGE OF ROOF SHEET IN EW BN, SPECIAL REPAIR TO BOUNDARY WALL OF FPO AND QUARTER GUARD BUILDING NO T-173 OF DEF AND EMP COYOF HQ 15 CROPS, AT BB CANTT, SRINAGAR.
Construction of Boundary Wall by way of Brick Masonry including laying of Grills etc in park at Matto Colony ward 52, P/L of intelocking tiles in park at Matto Colony Making Green surface in park and plantation at Matto Colony Cons
Repair to boundary wall, retaining wall, toe walls including wall cladding and security fencing at chnc and other areas and Repair/ maint of led street light, poles, MCBs/ MCCBs, cables and connected items at chnc and other areas under GE (U) Udh
Restoration and structural strengthening of bowli near shiv temple ward no 4 and Improvement of boundary wall of panchayat ghar with main gate ward no 5 and Restoration and structural strengthening of bowli with shed near the house of vijay kumar pam
Construction of 1 No 5000 Gln GSR/Sump Tank, 5 No 10000 Gln GSR/Sump Tank, 1 No 20000 Gln GSR/Sump Tank, 3 No Pump Room, 360mtr boundary wall Laying and Fitting Rising Main and Distribution system under WSS Deeing (JJM).
Construction of Boundary wall near Kabir Bhawan , Construction of drain from Haveli of Rakesh kumar to h/o Harnam Singh and Construction of lane drain from h/o Pupinder Dingh village and panchayat Chak Bala Block RS Pura (DDC COMPONENT) for the year
Construction of 04 Nos. Pump Room Building, 08 Nos. 10000 Glns GSR/ Sump Tank, 02 Nos. Cleaning of Dug wells, 01 No. Improvement of Pump room building, 02 Nos. Boundary wall and pipe laying and allied works under WSS Pacholi under JJM
Construction of 2 No 10,000 Gln GSR/Sump Tank, 2 No 20,000 Gln GSR/Sump Tank, 1 No 30,000 Gln GSR/Sump Tank, 1 No pump room, 180 mtr boundary wall, Laying and Fitting Rising Main and Distribution system under WSS Metka (JJM).
Repair of boundary wall and pathway main gate to building, tile work in open area, repair of roof top and plaster repair of walls drinking water connection, water tank required in Sub Centre Kaleeth. (Under Health District Capex 2026-27) (Ist Call)
REFER BOQ
BOQ
Refer BOQ
please refer BOQ
Please Refer BOQ
Refer BOQ
Please refer to BOQ
please refer BOQ
Please Refer to BOQ
Please refer BOQ
please refer BOQ
please refer BOQ
Please refer BOQ
Please refer BOQ